This Solicitation opportunity from Ohio was posted on February 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract involves comprehensive improvements at the Rockefeller Greenhouse Campus in Cleveland, Ohio, an exemplar of 1920s Art Deco architecture designed by J. Milton Dyer. The scope covers multiple structures including the Greenhouse and Admin Building, Historic Brick Garage, and Forestry Garage. Major renovations include a complete HVAC system replacement in the Admin Building due to outdated and nonfunctional equipment, extensive exterior repairs like roofing, brick repointing, steel lintel replacement, and window restorations, and full interior renovations. The Historic Brick Garage requires HVAC upgrades, façade repairs, and interior improvements, while the Forestry Garage needs emergency power, gutter replacement, and winter heating enhancements. The greenhouse complex itself demands a range of back-of-house repairs including asbestos mitigation, mechanical trench repairs, and restoration of glazing, masonry, and steel components.
The project is divided into three segments with varying levels of design responsibility. For the first two projects, the City has retained Architect and Engineer of Record consultants who will oversee construction administration and provide expert consultation, with the Construction Manager at Risk (CM-R) team assisting to meet budgetary goals. The third project requires the CM-R to provide full design and construction documentation, acting as the Architect or Engineer of Record. Separate bid packages may be considered if beneficial to the City’s economic interests. The solicitation is issued by the Mayor's Office of Capital Projects, with key contacts including the Chief Architect and Deputy Commissioner. The response deadline for proposals is mid-April 2026, and the project aims to preserve the historic integrity while modernizing facilities critical to the City's urban forestry and horticultural functions.
General Info
Renovate Rockefeller Greenhouse Campus including HVAC, structural repairs, preservation, and phased designs by 2026.
DOC, High priority: read this first5 pages · specifications
HighAI Summary for 15_PART_D_-_DETAIL_SPECIFICATIONS_JM - Rockefeller Greenhouse Campus Construction: This document, titled 'PART D - DETAIL SPECIFICATIONS,' outlines the detailed construction specifications for the Rockefeller Greenhouse Campus CM-R Improvements project in Cleveland, OH. It covers the scope of work under a single General Construction contract, including three project parts involving traditional and progressive design-build methods. The document details requirements for alternates, unit price items, allowances, examination of premises, applicable codes, permits, and utility protection. It emphasizes contractor responsibilities for coordination, compliance with Ohio Building Code, securing permits, and protecting utilities. The version is identified by the original filename 15_PART_D_-_DETAIL_SPECIFICATIONS_JM.doc.
PDF
PDF, High priority: read this first1 page · wage-determination
HighAI Summary for 24_PW_RATES - Prevailing Wage Rates Cover Letter: A cover letter regarding prevailing wage rates for Cuyahoga County, Ohio. It directs contractors to the Ohio Department of Commerce website for current rates and specifies that the contractor is responsible for compliance and record-keeping throughout the contract duration.
PDF
PDF, High priority: read this first28 pages · policy-manual
HighAI Summary for City of Cleveland City-Wide Asbestos Policy Manual (2017.05.19): This City-Wide Asbestos Policy Manual, effective May 19, 2017, provides comprehensive guidance for managing asbestos-containing materials (ACM) in City of Cleveland properties. It is designed to assist department and property managers in preventing asbestos fiber release during maintenance, renovation, or demolition. The manual outlines roles such as the Project Manager and Competent Person, and covers regulatory compliance, hazard communication, training, emergency procedures, and recordkeeping. It ensures adherence to federal, state, and local asbestos regulations and supports the Public Employment Risk Reduction Program (PERRP) requirements. Attachments include inspection reports, operation plans, notification forms, and exposure policies.
PDF
PDF, High priority: read this first56 pages · contract-document
HighAI Summary for City of Cleveland Design/Build Contract Sample: A sample Design/Build agreement between the City of Cleveland and a Consultant Company. The document outlines the contractual relationship for a fast-track project, defining the contract documents, order of precedence, administration by the Director of Capital Projects, and key definitions such as 'Design Documents' and 'As-builts'.
PDF
PDF, High priority: read this first2 pages · wage-determination
HighAI Summary for City of Cleveland Prevailing Wage Notification: This document notifies bidders and contractors that the contract is subject to Ohio Prevailing Wage Laws (Chapter 4115 O.R.C.). It outlines requirements for paying prevailing hourly wages and fringe benefits, submitting certified payrolls, and providing a final wage affidavit. Failure to comply may result in contract termination, debarment, or suspension of City of Cleveland certifications.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for City of Cleveland Professional Services Reimbursables Policy (01/01/2023): This document outlines the City of Cleveland's policies for reimbursable expenditures in Professional Services Contracts, effective January 1, 2023. It defines the distinction between Direct Labor and Reimbursables, specifies what costs must be included in labor multipliers (overhead, fringe benefits), and establishes requirements for the submission, approval, and invoicing of reimbursable expenses. It also provides detailed guidance on office expenses and equipment eligibility.
PDF
PDF, High priority: read this first618 pages · rfb
HighAI Summary for City of Cleveland Rockefeller Greenhouse Campus Renovations Project Manual: This document is the Project Manual for the City of Cleveland Rockefeller Greenhouse Campus Renovations, specifically for the Greenhouse Building located at 750 East 88th Street, Cleveland, OH. Dated January 5, 2026, it serves as the Permit/Bid Set and includes project identification, notice to prospective bidders, project description, contract scope and terms, and project consultants' contact information. The manual also contains a detailed project directory and a comprehensive table of contents outlining procurement and contracting requirements, specifications, and various construction divisions. It is intended as an Invitation to Bid for general contractors for construction, demolition, renovation, hazardous material removal, and related work on this historic building.
PDF
PDF, High priority: read this first20 pages · notice-to-bidders
HighAI Summary for Cleveland Area Business Code Notice to Bidders Chapter 187: This document is the Cleveland Area Business Code Notice to Bidders from the City of Cleveland Mayor’s Office of Equal Opportunity, dated May 5, 2022. It outlines the equal opportunity clause required in contracts, prohibiting discrimination and mandating affirmative action for minority, female, and local businesses. The notice defines key terms related to business enterprises, bidding, and contracting within the City of Cleveland. It emphasizes compliance with the Code to avoid bid rejection or contract cancellation and details the responsibilities of contractors regarding nondiscrimination and participation of certified businesses.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for MOCAP Minimum Consultant Design Requirements and Deliverables (DASD): This document outlines the minimum required deliverables for consultants working with the City of Cleveland's Mayor’s Office of Capital Projects (MOCAP) for the Division of Architecture and Site Development (DASD). It defines specific requirements across multiple project phases, including Due Diligence and Existing Conditions, Program Verification and Preliminary Design, Schematic Design, and Design Development. The document specifies technical review requirements, drawing and specification standards for various disciplines (Architectural, Structural, MEP), and cost estimation formats.
DOC
DOC, High priority: read this first1 page · special-notice
HighAI Summary for Northern Ireland Fair Employment Practices Disclosure Notice: This document is a supplemental notice to bidders regarding the Northern Ireland Fair Employment Practices Disclosure. It instructs bidders and appropriate parties to complete and submit the disclosure with their bid or prior to contract award. Failure to submit the disclosure renders bidders ineligible for contract award. The notice emphasizes compliance requirements for fair employment practices in the bidding process.
PDF
PDF, High priority: read this first2 pages · wage-determination
HighAI Summary for Ohio Instructions for Preparing Certified Payroll Reports (2024.12.27): Guidance document from the Ohio Department of Commerce providing detailed instructions for contractors and subcontractors on how to complete certified payroll reports in compliance with Ohio's Prevailing Wage Law (Ohio Revised Code Chapter 4115). It specifies requirements for reporting employee data, work classifications, hours worked, base rates, and fringe benefit payments.
PDF
PDF, High priority: read this first1 page · wage-determination
HighAI Summary for Ohio Prevailing Wage Affidavit of Compliance: A legal affidavit form from the Ohio Bureau of Wage and Hour Administration used by contractors to certify that wages paid on a specific project comply with the prevailing wage requirements of Chapter 411.5 of the Ohio Revised Code. This document must be submitted to the public authority before the release of surety or final payment.
PDF
PDF, High priority: read this first4 pages · wage-determination
HighAI Summary for Ohio Prevailing Wage Contractor Responsibilities (2024.12.27): A summary of the legal responsibilities for contractors operating under Ohio's prevailing wage laws (Chapter 4115 of the Ohio Revised Code). The document outlines project cost thresholds for applicability, penalties for violations, requirements for apprentice ratios, payroll record-keeping, and detailed instructions for submitting certified payroll reports.
PDF
PDF, High priority: read this first2 pages · wage-determination
HighAI Summary for Ohio Prevailing Wage Notice - Valerie Harvey 2024.12.27: This document is a prevailing wage notice from the Ohio Department of Commerce, Bureau of Wage & Hour Administration, dated December 27, 2024. It informs public authorities and contractors about the availability of wage rates online and the process for receiving notifications of wage rate changes via email. The notice provides contact information for Valerie Harvey at the City of Cleveland Mayor’s Office of Capital Projects for inquiries. The document aims to facilitate efficient access to prevailing wage information for public projects in Ohio.
PDF
PDF, High priority: read this first2 pages · wage-determination
HighAI Summary for Ohio Prevailing Wage Notification to Employee (2024.12.27): A prevailing wage notification document for employees in the state of Ohio, dated December 27, 2024.
PDF
PDF, High priority: read this first1 page · wage-determination
HighAI Summary for Ohio Prevailing Wage Threshold Levels (2024.01.01): Official notice from the Ohio Department of Commerce regarding prevailing wage threshold levels effective January 1, 2024. It specifies the monetary thresholds for building construction ($250,000 for new; $75,000 for reconstruction) and road/bridge construction ($98,974 for new; $29,653 for reconstruction) that trigger the requirement for prevailing wage determinations in public improvements.
PDF
PDF, High priority: read this first13 pages · specifications
HighAI Summary for Part B - General Conditions (Revised August 28, 2025): This document outlines the General Conditions for a public improvement contract with the City of Cleveland, Ohio, revised August 28, 2025. It defines the contract documents, key terminology, and establishes legal and operational requirements including time of completion, liquidated damages, insurance, prevailing wage rates, and indemnification.
PDF
PDF, High priority: read this first79 pages · specifications
HighAI Summary for Phase 1 Rockefeller Campus Admin Permit Bid Drawings: This document contains the building plan and design criteria for the Rockefeller Greenhouse Campus Renovation project in Cleveland, Ohio. It includes contact information for key personnel such as architects, engineers, and city officials, as well as building code summaries and repair notes. The document references the 2017 Ohio Building Code and ASCE 7-10 standards, detailing floor live loads, snow loads, wind loads, and repair legends for structural elements. It serves as a technical specification and guideline for construction and renovation work on the campus.
PDF
PDF, High priority: read this first10 pages · permit-bid-drawings
HighAI Summary for Phase 1 Rockefeller Campus Forestry Permit-Bid Drawings: This document is the permit and bid drawings set for the Rockefeller Park Greenhouse Campus Urban Forestry Maintenance Garage located at 750 East 88th Street, Cleveland, OH. It includes architectural, electrical, and mechanical plans, life safety plans, and building code summaries. The project involves minor modifications to the existing forestry barn with no changes in use, construction, or occupancy. The scope covers HVAC, plumbing, fire suppression, fire alarm, power, data, lighting, interior partitions, doors, and finishes. The document references applicable Ohio building codes and standards, and includes detailed occupancy classifications, fire protection, allowable height and area, and exit travel distances. The drawings are dated January 5, 2026, and are intended for permit and bid purposes.
PDF
PDF, High priority: read this first39 pages · rfp
HighAI Summary for Rockefeller Greenhouse Campus CM-R Improvements RFP: This document is a Request for Proposal (RFP) issued by the City of Cleveland for the Rockefeller Greenhouse Campus Construction Management at Risk (CM-R) Improvements project. Released on February 26, 2026, with a response deadline of April 15, 2026, it outlines the scope of services for three projects involving design-build and progressive design-build approaches. The RFP includes detailed proposal schedules, submission requirements, selection criteria, and compliance information. It also contains numerous attachments such as policies, wage determinations, project manuals, and drawings. The project aims to renovate and improve the historic Rockefeller Greenhouse Admin Building, Forestry Garage, and Historic Brick Garage, addressing HVAC replacements, exterior repairs, asbestos mitigation, and other critical infrastructure upgrades.
PDF
PDF, High priority: read this first25 pages · sow
HighAI Summary for Rockefeller Greenhouse Solar Glazing SD Narrative: This document dated August 22, 2025, is the Schematic Design (SD) Narrative for the Rockefeller Greenhouse Solar Glazing project in Cleveland, Ohio. It outlines architectural and electrical criteria for implementing solar glazing in three locations within the greenhouse complex: Lobby Kalwall, Tropical Showhouse, and Auxiliary/Typical Showhouses. The narrative includes existing structural details, proposed modifications, and consultant feedback on shading methods. Electrical design standards referenced include NFPA 70 and ASHRAE 90.1. Appendices contain architectural renders, electrical drawings, and product datasheets. The document serves as a detailed design criteria guide for the project.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for Section 01 74 19 Construction Waste Management and Disposal: Technical specifications detailing the administrative and procedural requirements for salvaging, recycling, and disposing of nonhazardous demolition and construction waste. It establishes a performance requirement to achieve a 50% salvage/recycling rate by weight and mandates the submission of a Waste Management Plan and progress reports.
PDF
PDF, High priority: read this first2 pages · wage-determination
HighAI Summary for State of Ohio Certified Payroll Report (Part A & B): Standard State of Ohio forms (F330-03A and F330-03B) for Certified Payroll Reporting in public facility construction. The document includes templates for reporting hours worked, wage rates, fringe benefits, and worker identification to ensure compliance with prevailing wage laws.
PDF
PDF, High priority: read this first26 pages · supplemental-general-conditions
HighAI Summary for Supplemental General Conditions - Part C: This document, titled 'Part C Supplemental General Conditions,' provides supplementary provisions that amplify or modify the General Conditions of a contract. It includes detailed definitions and clarifications of key terms such as Allowance, Alternate, Architect, Change Order, Contract Amount, Construction Duration, and others relevant to the contract administration and execution. The document is intended to be used alongside the original General Conditions, with supplementary portions considered additions. It outlines the scope, definitions, and procedural elements critical for contract management and compliance, dated as part of the contract documentation for the City of Cleveland projects.
PDF
PDF, Low priority4 pages · policy
LowAI Summary for City of Cleveland Subcontractor Addition and Substitution Policy: This document outlines the policies and procedures for City of Cleveland contractors to add or substitute subcontractors. It mandates prior Board of Control (BOC) approval before any subcontractor begins work, requires verification from the Office of Equal Opportunity (OEO) for certified small, minority, or female business enterprises, and specifies a three-week lead time for submission of requests to avoid project delays.
PDF
PDF, Low priority10 pages · policy
LowAI Summary for City of Cleveland Sustainable Municipal Building Policy (April 2013): Issued in April 2013, this policy mandates the incorporation of green building practices into the design, construction, and maintenance of City of Cleveland facilities. It establishes goals for energy, water, and greenhouse gas reductions, and requires LEED Silver certification or higher for new construction and major renovations over 10,000 square feet.
DOC
DOC, Low priority27 pages · policy-manual
LowAI Summary for Cleveland City-Wide Asbestos Policy and Program Manual (2017.05.19): This document is the City of Cleveland's City-Wide Asbestos Policy and Program Manual dated May 19, 2017. It provides comprehensive guidance for managing asbestos-containing materials (ACM) in city properties to ensure safety and regulatory compliance. The manual includes purpose, background, definitions, applicable regulations, and detailed procedures for managing asbestos, including roles of personnel, hazard communication, training, medical surveillance, and emergency response. Attachments provide additional forms and contact lists. The policy aims to prevent asbestos fiber release during maintenance, renovation, or demolition activities and complies with federal and state OSHA standards.
PDF
PDF, Low priority1 page · special-notice
LowAI Summary for Northern Ireland Fair Employment Practices Disclosure: This document is the Northern Ireland Fair Employment Practices Disclosure required by the City of Cleveland pursuant to Codified Ordinance Sec. 181.36. It must be completed by all contractors and subcontractors with more than 50% interest in a contract before award. The disclosure requires contractors to state whether they or their controlling entities are engaged in business in Northern Ireland and to confirm compliance with the MacBride Principles for fair employment practices or provide documentation of such compliance. False statements may result in contract default and a two-year bidding exclusion.
Description of Need Exemplary of 1920s Art Deco architecture, The Rockefeller Greenhouse & Admin Building was designed by J. Milton Dyer and constructed in the 1920s. The greenhouse houses the City of Cleveland rare plant collection and serves as the primary growing facility for the Cities summer annual plants used throughout the City owned downtown public buildings. The Greenhouse Admin building and Historic garage are primarily brick with limestone embellishments. The Forestry Garage is a metal clad butler building serving primarily as tool storage and a garage for the Urban forestry department. The Admin Building serves as the headquarters for the Urban Forestry department and as the management office for the Rockefeller Greenhouse. The Admin Building requires a complete HVAC replacement, as the existing boiler has exceeded its functional life and the air-conditioning system has been inoperable for years. Significant exterior repairs are also needed, including a new roof, brick repointing, replacement of severely deteriorated steel lintels, and restoration of several previously bricked-in windows. In addition, the building interior requires a full renovation. The Historic Brick Garage similarly needs HVAC upgrades, façade repairs, and interior improvements, while the Forestry Garage requires emergency power, new gutters, and winter heating enhancements. The greenhouse complex requires a comprehensive back-of-house renovation, including asbestos mitigation within the working greenhouse, mechanical trench repairs, exterior façade work, and repairs to greenhouse glazing, masonry, and steel elements. Possible Separate Bid Packages Based on any opportunity agreed upon with the Director of the Mayor's Office of Capital Projects, the Design-Builder shall be responsible to evaluate the advantages and disadvantages of the need for separate bid packages that best serve the economic interests of the City. City's and Contractor Consultants On Project 1, the City has retained Architect and Engineer of Record Consultants through construction, and will remain contractually under the City of Cleveland. The CM-R team will assist the Consultants to meet the CM-R budget. The Consultants shall perform construction administration and advise and consult with the City and perform customary AOR and EOR Construction Administration activities. Additional Professional Services, except those required by the Construction Documents (such as delegated design), are not anticipated by the selected CM-R in this project. On Project 2, the City has retained Architect and Engineer of Record Consultants through construction, and will remain contractually under the City of Cleveland. The CM-R team will assist the Consultants in completion of the Construction Documents to meet the CM-R budget and attain a permit. The Consultants shall perform construction administration and advise and consult with the City, and perform customary AOR and EOR Construction Administration activities. Additional Professional Services, except those required by the Construction Documents (such as delegated design), are not anticipated by the selected CM-R in this project. On Project 3, the CM-R team will need to provide full Design and Construction Documents based on the criteria set provided. The CM-R design team will be the AOR or EOR of record. The City's Project 1 and 2 AOR and EOR will not assist on Project 3, unless the CM-R chooses to contract with that Team. Existing Documentation Brief Project 1: 100%, Permitted, Construction Documents for the Rockefeller Greenhouse Admin Building, Brick Garage, and Forestry Garage. This includes a Project Manual. Project 2: 85% Construction Documents for the Rockefeller Greenhouse. This includes a Project Manual. Project 3: Criteria documents for the Rockefeller Greenhouse solar glazing project.
More opportunities from Ohio → Mayor's Office of Capital Projects
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.