Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

ROD, PUSH

Active
N0010426QFF18Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the supply of a push rod designated as SPECIAL EMPHASIS material (Level I/SUBSAFE) for use in a critical shipboard system, where failure could result in catastrophic consequences including loss of life or vessel. The item must strictly comply with NAVSEA drawing 7614787 and material specification QQ-N-286, hot finished and age hardened with a Brinell hardness of 265–320, with welding explicitly prohibited on this material. All components require comprehensive certification including quantitative chemical and mechanical analysis, ultrasonic inspection of starting material, and slow strain rate tensile testing conducted only by designated laboratories. Traceability is mandatory from raw material through final assembly, requiring permanent, legible markings on each part linked to certified test reports, with batch sampling every eight hours during production. Electronic signatures are accepted on certification documents, provided they are uniquely controlled, authenticated, and tamper-evident. No disclaimers are permitted—certifications must be positive and unqualified. All suppliers must maintain an ISO-9001 quality system with calibration control per ISO-10012 or ANSI-Z540.3 and ISO-17025, subject to government audit at any time prior to and during production. Government Quality Assurance is performed at source, and all subcontractors must be vetted and monitored for compliance. Each shipment requires submission of certification data via WAWF to Portsmouth Naval Shipyard (DODAAC N50286), with inspection and acceptance handled by N39040 and notification sent to PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL; no material may be shipped without prior acceptance. Final delivery must occur within 365 days of contract effective date, with early or incremental delivery allowed at no additional cost. The contract strictly prohibits mercury-containing materials, mandates configuration control through Engineering Change Proposals for any modifications, and requires 100% inspection of traceability, certification data, and nondestructive test results. Only suppliers with an approved Quality Control Manual are eligible, and the solicitation is set aside for small businesses under a total small business set-aside, with Buy American and DPAS priority rating requirements in effect.

General Info

Procure push rod per NAVSEA 7614787 and QQ-N-286, traceable, weld-free, certified, delivered in 365 days, zero-defect, Buy American compliant.

Agency

Department Of Defense → Navsup Weapon Systems Support MechView Agency

NAICS

333613 - Mechanical Power Transmission Equipment ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support Mech
View Agency Profile
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more

CONTACT INFORMATION|4|N743.25|WVE|771-229-1462|jordan.d.neely2.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specifications Section C and Section E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material|N50286|TBD|133.2|N/A|N/A|N39040 - Certifications.|N/A| N/A|See form DD1423|PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL | NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|365 DAYS AFTER FINAL DELIVERY||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference to N00102 within this order should be updated to N50286. 3. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed here in. 4. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior to scheduled delivery. PNSY review/acceptance of Certification CDRLs 30 working days after receipt of Certification DD 1423 CDRLs. Final delivery of material will be on or before 365 days after effective date of the resulting contract. 5. Only those sources with an acceptable Quality Control Manual are eligible for award under this solicitation. Offerors are cautioned that this procurement will not be delayed solely for the purpose of approving additional sources. 6. Any contract awarded because of this solicitation will be a DO rated order certified for national defense use under the Defense Priorities and Allocations System (DPAS). 7. If requirement is packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility. 8. Early and incremental delivery is acceptable at no additional cost to the Government. 9. Final delivery of material 365 Days. 10.NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers. 11.If drawings are included in the solicitation, access needs to be requested on the individual solicitation page on Contracts Opportunities on the Government's SAM.gov website. After requesting access, send an email to the Primary POC listed on the solicitation. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=7614787 |53711| B| |D| | | | DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|F| |01| DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | 3. REQUIREMENTS 3.1 ;The push rod must be made in accordance with NAVSEA drawing 7614787, except as amplified or modified herein.; 3.2 ;Welding is not permitted on QQ-N-286 material.; 3.3 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Push Rod; Material - ;QQ-N-286, Hot Finished and Age Hardened, with a Brinell Hardness of 265-320; 3.4 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Attribute - ;Age Hardening; Item - ;Push Rod; Performance - ;QQ-N-286; Test - Ultrasonic Inspection on Starting Material Item - ;All Items requiring certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract; Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286 3.5 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories: Huntington Alloys, a Special Metals Company Attn: Bill Bolenr 3200 Riverside Drive Huntington, WV 257059 Phone: (304) 526-5889 FAX: (304) 526-5973 Metallurgical Consultants, Inc. Attn: W. M. Buehler 4820 Caroline PO Box 88046 Houston, TX 77288-0046 Phone: (713) 526-6351 FAX: (713) 526-2964 Naval Surface Warfare Center, Carderock Division Attn: Eric Focht Code 614 9500 Macarthur Blvd West Bethesda, MD 20817-5700 Phone: (301) 227-5032 FAX: (301) 227-5576 Teledyne Allvac Attn: Dr. W. D. Cao 2020 Ashcraft Ave. Monroe, NC 28110 Phone: (704) 289-4511 FAX: (704) 289-4269 Westmoreland Mechanical Testing and Research Inc. Attn: Andrew Wisniewski P.O. Box 388 Youngstown, PA 15696-0388 Mannesmann Rohrenwerke Mannesmann Forschungsinstitut (MFI) Attn: Dr. Weiss Postfach 251160 47251 Duisburg Germany Phone: 011-49-0203-9993194 FAX: 011-49-0203-9994415 ThyssenKrupp VDM USA, Inc. Attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 Houston, TX 77065-4939 Phone: (281) 955-6683 3.6 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.6.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.6.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.6.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.7 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.8 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.8.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.8.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.8.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.9 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.10 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.10.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.11 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.12 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.12.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.12.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.12.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.12.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.12.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.13 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.13.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.13.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.14 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.14.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.14.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.14.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.14.4 The prime contractor must evaluate the requirements of the contractand select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.14.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.15 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.15.1 Visual examination upon receipt to detect damage during transit. 3.15.2 Inspection for completeness and proper type. 3.15.3 Verification of material quality received. 3.15.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.15.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.15.6 Identification and protection from improper use or disposition. 3.15.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.15.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.15.9 Material returned to the contractor must be handled as GFM. 3.16 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.16.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein and elsewhere in this Contract/Purchase Order. 3.17 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number, as applicable, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.17.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.17.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.17.3 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. ;Marking area to be as shown on the drawing.; 3.18 See CDRL DI-MISC-81020 (Chemical and Mechanical) - Material Certification - In addition to the certification data requirements specified in DI-MISC-81020, the following material certification requirements apply: 3.18.1 Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as applicable, of the material supplied. 3.18.2 Re-identification and re-certification of material is required when the material is subjected to a process which alters it's properties. If the starting material or raw stock is processed in a manner that will not affect its chemical composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The altered material must be uniquely re-identified with a new traceability number. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability marking used with the altered material and at a minimum contain the information below. 3.18.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.18.4 ELECTRONIC SIGNATURES. 3.18.5 Electronic signatures on Level I certification documents are consideredequivalent to handwritten signatures. 3.18.6 Suppliers that use electronic signatures to authenticate company certifications and reports must ensure that process is controlled and unique to the individual signing the document. The signer must take a distinct action to electronically sign the document 3.18.7 Suppliers must develop one method of authentication to be provided at the time of signature. The authentication method must be based on something known only to the signer (e.g., a password) or based on something only the signer possesses (e.g., a card or other device). 3.18.8 Electronic signature applications must not allow unauthorized users tochange electronically signed documents or records. All changes to electronically signed documents or records made by authorized users must be revision- or date-controlled, must identify the person making the change, and must clearly reflect that the document or record has been revised. 3.18.9 The prime contractor, as a minimum, must flow down the electronic signature requirements to their sub-tier suppliers and sub-contractors that provide electronically signed company certifications and reports to ensure that they have a procedure to control and identify unique processes for only allowing authorized individuals to sign documents. 3.18.10 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.18.11 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.18.12 Revisions of OQE must be provided by the originating organization and must include a description of the data modified along with the proper signature requirements herein. 3.18.13 In cases of foreign certification, conversion of foreign language unitsof measure and properties measured into U.S. units of measure must be annotated on the furnished foreign certifications, if space permits, or placed on an addendum in the same format as the foreign certification data. Such conversion must be identified as to origin with name, title, and signature of the authorized representative of the company making the conversion. 3.18.14 The certification data requirements contained in this appendix must beinvoked on the prime contractor who must delegate these requirements to all sub-tier contractors supplying Level I material. 3.19 Material Handling - The written material control process must include the following: 3.19.1 All raw materials must have traceability markings (except as specified below). 3.19.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.19.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.19.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors. 3.19.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.19.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.20 Receiving inspection - 3.20.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. 3.20.2 Receiving Inspection must include as a minimum - Verification that the traceability marking on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.21 Discrepancy reporting - 3.21.1 Nonconforming products from sub-tier suppliers must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records must be maintained and available for review by the government Quality Assurance Representative (QAR). 3.22 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.22.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.22.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government/Navy Receipt Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.22.3 All data concerning material verification (chemical, mechanical or physical properties), traceability (material certifications to material marking), and nondestructive test (NDT) certifications for material must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.22.4 All material requiring traceability must be 100% inspected for traceability marking and that the marking is legible. 3.23 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address and date. 2. The contract/purchase order number (for example: N00104-11-P-FA12) 3. The National Stock Number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (for example: 1H 4820 012345678 L1) ("N/A" when Not Applicable). 4. Lubricants, sealants, anti-seize, and/or thread locking compounds ("N/A" when Not Applicable). 5. Certification that O-rings, packing, gaskets, or other elastomeric products were installed in a compressed state within an assembly or sub-assembly, prior to expiration of the shelf life ("N/A" when Not Applicable). 6. Manufacturer's compound number ("N/A" when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 8. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements and list each contractually invoked conformance/compliance test performed by name and that it was performed satisfactorily. 9. Contractor's or authorized personnel's signature. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO. 4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders. 4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item. 6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD (Contract Support Document) Library within ECDS. 6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the ship, or unacceptable risk of personal injury or loss of life. 6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation). 6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements. 6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program. 6.1.6 Government Source Inspection (GSI) - GSI is independent oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to assure that those unique product quality and system elements, identified by the Contracting Agency as important, are observed and evaluated. 6.1.7 Quality Assurance Letter of Instruction (QALI) - A QALI is a formal document initiated by a contracting activity that provides essential requirements and instructions for contracted materials to be independently verified and accepted by a government representative prior to shipment. 6.1.8 Objective Quality Evidence (OQE) - The quantitative and qualitative data of all mechanical, chemical, and performance tests performed (as required by the applicable specification, drawing, or purchase document) to prove that the material supplied conforms to the specified requirements. 6.1.9 Surface Discontinuity - Any surface irregularity, marking, or localized change in physical character of the surface, other than dimensional, that exists infrequently at one or several places. (Examples: burrs, dents, nicks, scratches, gouges, pits, center-punches, scribes, and tool marks) Surface discontinuities less than 0.005-inch in depth are acceptable provided they do not violate any other design requirements specified in this Contract/Purchase Order. 6.1.10 Traceability Code - A code or number providing traceability to the actual chemical and mechanical properties of the specified heat, batch, or form from which the material originated. 6.1.11 Verification - An examination performed to determine compliance with a specific requirement. 6.1.12 Nonconformance - A nonconformance is defined as affecting or violating the following: - The requirements of this contract/purchase order. - Contractually invoked drawings (i.e. envelope dimensions, interface dimensions with mating parts/equipment, center of gravity, weights, piece part identification, material, etc.). - Contractually invoked federal, military, or commercial specifications and/or standards. - Form, fit, function, performance to contract requirements, reliability, maintainability, interchangeability, safety of personnel or equipment, or additional cost to the Government. 6.1.13 Waiver - A written authorization to accept an item, which during manufacture, or after having been submitted for Government inspection or acceptance, is found to depart from specified requirements, but nevertheless is considered suitable for use as is or after repair by an approved method. 6.1.14 Deviation - A specific written authorization (granted prior to the manufacture of an item) to depart from a particular requirement(s) of an item's current approved configuration documentation for a specific number of units or a specified period of time, and to accept an item which is found to depart from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method. 6.1.15 Critical Waiver/Deviation - This waiver/deviation consists of a departure involving safety. 6.1.16 Major Waiver/Deviation - This waiver/deviation consists of a departure involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, or Durability of the item or its repair parts - Health or Safety - Effective Use or Operation - Weight, Stability, or Structural Integrity - System design parameters as schematics, flows, pressures or temperatures - Compartment arrangements or assigned function 6.1.17 Minor Waiver/Deviation - This waiver/deviation consists of a departure which does not involve any of the factors listed as critical or major. 6.1.18 Engineering Change (EC) - A change to the current approved configuration documentation of a configuration item at any point in the life cycle of the item. 6.1.19 Engineering Change Proposal (ECP) - A proposed Engineering Change and the documentation by which the change is described, justified, and submitted to the Government for approval or disapproval. 6.1.20 Class I ECP - A class I ECP is approved by the Government's Configuration Control Board and authorized with a contract modification. 6.1.21 Class II ECP - A class II change is typically reviewed for concurrence in classification by the local government representative, unless otherwise specified elsewhere in the contract/purchase order. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. 6.2.1 There are 7 (seven) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.3 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.4 Recent Updates - A short description of recent updates to the technical requirements of this item are listed below, along with an implementation date for each issue. The notes below are only a generic quick reference and are provided for convenience only, detailed requirements will be defined elsewhere in the technical sections of this Contract/Purchase Order. ;10/20/2016 - Updated ECDS URL Feb 26 2009 - Clarified testing and certs only apply to pieces listed Oct 29 2010 - Added Sampling Std for LI In-Process testing Jun 28 2012 - Updated UT of QQ-N-286 Bar 4" and over Sep 30 2008 - Thread Inspection Requirements were clarified Dec 20 2022 - Removed requirement for vender to submit Waivers/Deviations in ECDS Jan 05 2012 - Added WAWF to forward Approved Waivers/Deviations with final OQE Dec 17 2011 - Moved Quality Assurance Text location for Readability Apr 15 2009 - Clarified the sample size for large and small lot sizes Jan 19 2011 - Added notification of DCMA upon contract award May 02 2009 - Added Lubricants and Sealants to the C of C Aug 27 2014 - Took out contractor's phone number requirement Dec 01 2011 - Moved "Notes to DCMA QAR" to QA Section Jan 5 2017 - ECDS/CSD info was added to Definitions in the Notes section.; DATE OF FIRST SUBMISSION=ASREQ Paragraph 10.4 of DI-QCIC-81110 does not apply. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply. Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance. DATE OF FIRST SUBMISSION=ASREQ Block 12 - Certification data must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Certification documentation must be submitted via WAWF (Wide Area Work Flow). Enter in WAWF as follows: "Ship to" N50286 "Inspect by" N39040 "Accept by" N39040 and eMail notification field: PORT_PTNH_WAWF_Notification@navy.mil No material is to be shipped prior to the receipt of Acceptance.

Similar Contracts

Same NAICS industry code

NAICS: 333613
New
DIBBS
GEAR, SPURThis contract pertains to the procurement of a spur gear identified by part number 6738408 and NSN 3020-00-320-2564, with a quantity of five units required. The gear is supplied by Precision Gear Industries LLC and Rolls-Royce Marine North America Inc., and is designated as a critical application item. Delivery is mandated within 16 days of contract award, with FOB origin terms and no variance allowed in quantity. Inspection and acceptance occur at the destination facility in Tracy, California, under the packaging standards of MIL-STD-2073-1E and marking requirements of MIL-STD-129, with no special marking codes applied. Packaging must comply with DLA’s official packaging directives, including specific preservation methods, container types, and palletization standards. Mercury and mercury-containing compounds are strictly prohibited unless explicitly exempted for functional components such as batteries, fluorescent lamps, sensors, or weapon systems, and even then, portable devices must feature shockproof design and secondary containment as per NAVSEA 5100-003D. The contract is issued under solicitation SPE7L5-26-T-4540, classified as a Total Small Business Set-Aside under NAICS code 333613, and is administered by the Department of Defense’s Land Supplier Operations Engines. The required delivery date was originally October 7, 2025, with a need ship date of January 13, 2026. Technical and quality requirements referenced in this contract are governed by the DLA Master List of Technical and Quality Requirements, accessible via the DLA eProcurement portal, with the applicable revision determined by the solicitation or award date depending on acquisition size. All units of issue align with DoD standards, and transportation logistics follow DLAD procedural notes C19 and C20. The primary point of contact is Shane Harrington, with shipping and receiving directed to the specified warehouse address in Tracy, CA. The contract explicitly excludes government identification from non-accepted supplies and enforces strict adherence to all referenced military and procurement directives.
LAND SUPPLIER OPNS ENGINES

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 333613
New
DIBBS
PLATE, RETAINING, SHAThe contract pertains to the procurement of two retaining plates, part number AH0932 with NSN 3040-01-477-7768, under solicitation SPE7L1-26-T-861U, issued by the Department of Defense’s Land Supply Chain. Delivery is required within 20 days of contract award to the USS Dwight D Eisenhower CVN 69 at FPO AE 09532, with goods to be shipped FOB origin using the fastest traceable means—parcel post is prohibited. The unit price is $2.00 per unit, totaling $4.00, with no tolerance for quantity variance. Packaging must comply with MIL-STD-2073-1E and MIL-STD-129, utilizing specific methods including dry preservation, corrosion-inhibiting wrap, and E5 unit containers, with no special marking required. The contractor, Eastern Industrial Products, Inc., must ensure no intentional introduction of mercury or mercury compounds into the product, except for approved functional uses such as batteries, fluorescent lamps, or instrumentation specified by NAVSEA, with additional containment requirements for portable devices. All technical and quality requirements are governed by the DLA Master List of Technical and Quality Requirements, with revisions controlled by the solicitation issue date. The contract specifies destination inspection and acceptance, and all shipments must adhere to DLA procedural notes regarding transportation. The original required delivery date is July 20, 2026, with an official posting date of July 22, 2026, and a response deadline of August 3, 2026.
LAND SUPPLY CHAIN

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 333613
New
Federal
SHAFT, SHOULDEREDThe solicitation seeks the procurement of 15 shouldered shafts, designated by NSN 1HM 3040 014088956 L1, for use in critical shipboard systems under a fixed-price contract managed by the Navy Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania. The requirement carries the highest level of quality assurance due to the potential consequences of failure, including risk to life, vessel, or mission, necessitating strict compliance with military standards including MIL-STD-2073-1 for packaging and preservation, MIL-STD-129 for marking, and MIL-STD-130 for Unique Item Identification using Data Matrix symbology and Concatenated Unique Item Identifiers. Delivery must occur within 365 days of award under FOB Destination terms, with all shipments subjected to inspection and acceptance at the destination, and zero-defect acceptance criteria apply—any single nonconformance results in rejection of the entire lot. Contractors must provide full traceability, certified material reports, and pass First Article Testing and Government Source Inspection, while adhering to ISO 9001, ISO 10012, and ISO/IEC 17025 quality systems. The contract mandates strict cybersecurity compliance under NIST SP 800-171 for safeguarding covered defense information, with mandatory reporting of cyber incidents to the DoD within specified timeframes, and requires flow-down of DFARS 252.204-7012 to all subcontractors handling sensitive data. Contractors must also comply with federal regulations including the Buy American Act, with multiple alternates active, and maintain Small Business subcontracting plans, with the set-aside fully reserved for small businesses under FAR 52.219-6 and 252.219-7996. All invoices must be submitted electronically through Wide Area Workflow, and payment is routed via DoDAACs with no physical remittance address provided. Past performance is the primary evaluation factor, assessed through the DoD Supplier Performance Risk System using adjectival ratings, with award made on a trade-off basis prioritizing performance reliability over price. The offeror must possess an active UEI and SAM registration, certify compliance with all applicable FAR and DFARS clauses, and ensure packaging, preservation, labeling, and marking meet all referenced military specifications with strict control over ESD/EM protection and hazardous material handling per MIL-STD-
Navsup Weapon Systems Support Mech

POSTED

about 11 hours ago

DEADLINE

in 30 days
View Details
NAICS: 333613
New
DIBBS
CONNECTING LINK, RIGThe contract is for the procurement of two rigid connecting links for the main landing gear of military equipment, identified by NSN 3040-00-001-3669, with a delivery requirement of 427 days after award. The technical specifications require adherence to SAE AMS-A-225 instead of QQ-A-225, surface roughness compliant with ASME B46.1, geometric tolerancing per ASME Y14.5, and marking in accordance with MIL-STD-130 in place of IM-8. Ozone-depleting chemicals are strictly prohibited, and any substitutions must be approved unless explicitly permitted by the specifications. The item is subject to export control under ITAR or EAR, restricting technical data disclosure to foreign persons and requiring compliance with DFARS 252.225-7048; only contractors with approved JCP certification, completed DLA training, and authorized access may receive the controlled data. Cybersecurity maturity is mandated at CMMC Level 2, and the contractor must comply with DLA’s packaging standards, tailored quality requirements, and configuration change management through formal engineering change proposals. Inspection and acceptance must occur at the manufacturer’s origin, and government identification must be removed from non-accepted items. Full and open competition applies, with no set-aside, and all technical and quality requirements referenced are governed by the DLA Master List of Technical and Quality Requirements in effect at the RFP issue date. The contracting activity is the Department of Defense, Land Supplier Operations Vehicle Support, with the point of contact listed as Karen McCarley, and performance is designated to Jacksonville, Florida.
LAND SUPPLIER OPNS VEHICLE SPT

POSTED

1 day ago

DEADLINE

in 12 days
View Details
NAICS: 333613
New
DIBBS
SHAFT, STRAIGHTThe contract pertains to the procurement of a straight shaft identified by part number 392184-7 and NSN 3040-01-544-1203, with a quantity of 14 units to be delivered FOB origin in accordance with MIL-STD-2073-1E packaging standards and MIL-STD-129 marking requirements. The item is classified as a critical application item under Lockheed Martin Corp and must comply with all technical and quality requirements referenced in the DLA Master List of Technical and Quality Requirements, indicated by R or I numbers. Sampling procedures must follow MIL-STD-1916 or ASQ H1331 Table 1, with zero non-conformances required unless otherwise stipulated, and attributes are to be classified with corresponding verification levels or AQLs. Packaging must adhere to DLA-specific guidelines including palletization and the use of specified preservation methods and materials, with no special marking required. Delivery is required within 171 days of order placement, with an original required delivery date of May 13, 2027, and a need ship date of January 17, 2027. The destination for delivery is the DLA Distribution San Joaquin facility in Tracy, California, with inspection and acceptance occurring at the destination. No quantity variance is permitted, and the unit price is $14.00 per unit for a total contract value of $196.00. The contract is issued under solicitation number SPE4A5-26-T-303C, with a response deadline of July 29, 2026, and is categorized under NAICS code 333613. Transportation instructions are governed by DLA procedural notes C19 and C20, and the unit of issue is EA as defined by DLA standards. The point of contact for the contract is Hope Scott of the Department of Defense’s ASC Supplier Operations OEM Division.
ASC SUPPLIER OPER OEM DIVISION

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 333613
New
DIBBS
BALL JOINTThe contract is for the procurement of a ball joint with NSN 3040-01-600-1867 and part number 2998K321 from McMaster-Carr Supply Co, under solicitation SPE7LX-26-U-8915, with a total quantity of 16 units at a unit price of $16.00, resulting in a total price of $256.00. The requirement is designated as a Total Small Business Set-Aside under NAICS code 333613, and delivery must be made within 49 days FOB origin with no tolerance for quantity variance. All items must be packaged and marked in strict compliance with MIL-STD-129 and ASTM D3951, but DLA’s Master List of Technical and Quality Requirements takes precedence over any material standard. Inspection and acceptance occur at the destination point, and packaging must follow DLA’s Packaging Requirements for Procurement (RP001), including palletization standards. The U/I is EA and the QUP is specified as 001, meaning each unit pack contains one item. The solicitation was posted on July 21, 2026, with responses due by August 5, 2026, and is managed by the Department of Defense’s Strategic Acquisition Program Directorate. Primary point of contact is Theodore Misiolek, reachable via phone or email. All technical and quality specifications referenced by R or I numbers are governed by the DLA Master List of Technical and Quality Requirements, with the applicable version determined by the solicitation issue date for simplified acquisitions. The item is covered under DLA Direct, CONUS, and the contract explicitly states that the estimated quantity may not be fully purchased by the IDC. All documentation and labeling must conform to the referenced standards and DLA directives without exception.
STRATEGIC ACQ PROGRAM DIRECTORATE

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 333613
New
DIBBS
BRAKE, BASEThis contract is for the procurement of 21 units of BRAKE, BASE with NSN 3040-01-165-4444 under solicitation SPE7LX-26-U-8900, a total small business set-aside classified under NAICS code 333613. The delivery is due within 99 days after contract award, with responses due by August 5, 2026. The specification incorporates technical and quality requirements from the DLA Master List of Technical and Quality Requirements, referenced by R or I numbers, with applicable revisions controlled by the solicitation issue date for simplified acquisitions. Packaging must comply with DLA standards, and government identification must be removed from non-accepted supplies. The product must not contain any Class I ozone-depleting chemicals, and any substitutions require prior approval unless explicitly authorized by the specification. Inspection and acceptance are to occur at origin, and configuration changes must be managed through an Engineering Change Proposal with formal request for variance if deviations are necessary. Technical data associated with this item is subject to export controls under ITAR or EAR, with restrictions on disclosure to foreign persons both domestically and abroad, requiring compliance with DFARS 252.225-7048. Access to this controlled data is limited to contractors with approved US/Canada Joint Certification Program status, who have completed required DLA training and questionnaires. The contracting office is the Strategic Acquisition Program Directorate within the Department of Defense, with Theodore Misiolek as the primary point of contact.
STRATEGIC ACQ PROGRAM DIRECTORATE

POSTED

1 day ago

DEADLINE

in 14 days
View Details

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 332919
New
Federal
TEE ASSEMBLYThis contract pertains to the procurement of a specialized 0.25 IPS SW x 0.438-20UNF-2B x 0.438-20UNF-2B Tee Assembly, designated as Special Emphasis Level I material due to its critical role in shipboard systems where failure could result in catastrophic consequences including loss of life or vessel. The item must strictly conform to Naval Sea Systems Command Drawing 845-2445109, with mandatory compliance to specific material specifications including MIL-C-24679 Alloy C71500 for the Tee and QQ-N-281 Class A for the Plug. All components require full traceability from raw material through final assembly, with unique heat-lot markings permanently applied and verified against certified test reports. The Contractor must maintain a quality system compliant with ISO-9001, ISO-10012, and ISO/IEC 17025, or an acceptable alternative under MIL-I-45208 and MIL-STD-45662, subject to government audit at any time during production. All inspections, tests, and certifications, including hydrostatic testing at 1050 PSI for three minutes without leakage or deformation, visual inspection per T9074-AS-GIB-010/271, and non-destructive testing, must be thoroughly documented with electronic signatures permitted under controlled procedures. Material certification data must be submitted via Wide Area Work Flow (WAWF) to Portsmouth Naval Shipyard prior to shipment, with specific routing to N50286 for shipping and N39040 for inspection and acceptance, and notification sent to PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL. No material may be shipped until formal acceptance is received. Requirements for welding and brazing are tightly controlled, mandating prior submission and Navy approval of welding procedure qualifications under S9074-AQ-GIB-010/248 and S9074-AR-GIB-010A/278, including consumable filler metal certification and 72-hour notification to DCMA prior to test welding. Thread lubricants containing molybdenum disulfide are prohibited; only anti-galling compound A-A-59004 is permitted. All traceable materials must undergo 100% inspection for marking leg
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 11 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 811210
New
Federal
59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OFThe U.S. government, through NAVSUP Weapon Systems Support in Mechanicsburg, Pennsylvania, plans to award a sole-source contract to L3HARRIS MARITIME SERVICES INC. for the repair of a specific circuit card assembly identified by NIIN 7H-5998-015389217 and part number 10-4725-C1, used in sub propulsion systems. This item is critical to military operations, and the government has determined that L3HARRIS is the original equipment manufacturer and the only viable source capable of performing the repair, with no available technical data or rights held by the government to permit procurement from alternate suppliers. The contract will cover seven units to be delivered to DLA distribution centers in New Cumberland, Pennsylvania, and Tracy, California. The procurement is authorized under 10 U.S.C. 2304(c)(1) and FAR 6.302, and no competitive bidding is anticipated unless another qualified source submits a valid Source Approval Request, which will not delay the process. The contract is set for a one-year duration with UID requirements and Buy American Clause compliance, and will be executed under FAR Part 15 procedures, excluding commercial item acquisition policies. The solicitation, numbered N0010426QYABZ, is anticipated to be released on August 5, 2026, with responses due by September 3, 2026, and an award expected by September 18, 2026. All submissions must be made electronically via NECO, with no hard copies or phone inquiries accepted. Although the notice initially indicates a Total Small Business Set-Aside, the contract terms clarify it is not a Small Business Set-Aside. Interested parties may submit capability statements to Taylor Weidman by email within 45 days of the notice’s publication to be considered, although the government has affirmed its intent to proceed solely with the identified contractor.
Electronic and Precision Equipment Repair and Maintenance

POSTED

about 11 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 332919
New
Federal
PARTS KIT,BALL VALVThis contract pertains to the repair and refurbishment of a ball valve parts kit designated as SPECIAL EMPHASIS material due to its critical role in shipboard systems, where failure could result in catastrophic outcomes including loss of life or vessel. All components must be restored to “like new” or “A” condition under a firm fixed-price model, with mandatory submission of repair, teardown, and beyond-economic-repair pricing. The work is governed by stringent quality assurance protocols requiring ISO-9001 certification, compliance with MIL-STD and SAE standards, and full traceability from raw material through final assembly. Metallic parts, particularly the ball and seats, must meet exacting chemical and mechanical specifications, including SAE AMS-6931 and Torlon 4503/4203/4203L, with certifications that are unqualified, positively stated, and fully traceable to heat or lot numbers. All materials must bear permanent, legible markings that link directly to test reports, and any deviation, waiver, or engineering change requires prior government approval through formal processes. Certification documentation must be submitted via the Wide Area Work Flow system to Portsmouth Naval Shipyard, with inspection and acceptance authority vested in N39040 and shipped material strictly prohibited until formal acceptance is granted. The contractor must maintain complete control over subcontractors, ensure zero-defect lot acceptance, perform 100% inspection on critical documentation and traceability, and comply with Navy-wide procedures for weld qualification, material handling, and configuration control. The contract is a total small business set-aside, utilizes Commercial Asset Visibility, and is designated as a DO-rated order under the Defense Priorities and Allocations System, reflecting its priority status for national defense use. All deliverables must meet the requirements of Naval Sea Systems Command drawing 801-6404739 and incorporate the latest revisions referenced in the ECDS system, with final delivery required within 365 days of contract effective date.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 11 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 333998
New
Federal
SHRINK TUBE, CLEARThis contract requires the manufacture and delivery of SHRINK TUBE, CLEAR, compliant with MILSPEC P/N M23053/5-210-C and CAGE Code 96906, under a fixed-price arrangement with a 90-day delivery timeline. The product must adhere to strict military standards for marking, including MIL-STD-130, MIL-STD-1285, MIL-STD-454, and MIL-P-15024/5, and must be subject to government inspection under FAR 52.246-2. Configuration control is governed by MIL-STD-973, requiring all engineering change proposals, deviations, and waivers to be formally submitted to NAVICP-MECH in Mechanicsburg, PA, with original and two copies. The contractor is fully responsible for quality assurance, including maintaining inspection records for at least 365 days after final delivery, and must ensure compliance even in the absence of explicit inspection requirements. Packaging must conform to MIL-STD-2073 as specified in the schedule, and the item is designated as a commercial brand name description, meaning alternative proposals require full technical documentation for government evaluation. The contract is issued under solicitation N0010426QAC97, posted on July 22, 2026, with a response deadline of August 21, 2026, and falls under the NAICS code 333998. It is a total small business set-aside, subject to cybersecurity maturity model certification requirements and security prohibitions outlined in recent deviations issued in February 2026. Payment is processed through Wide Area Workflow using the Invoice and Receiving Report (Combo) method, with coordination via navsupwawf.wss.ftc@us.navy.mil. All contractual documents are deemed issued upon electronic transmission, and official access to controlled documents such as NOFORN or Official Use Only materials must be requested through designated government channels. The point of contact is Jennifer Henry, reachable at jennifer.l.henry73.civ@us.navy.mil or via phone at +1 771-229-0462, under the Naval Supply Systems Command Weapon Systems Support, Mechanicsburg, PA.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 11 hours ago

DEADLINE

in 30 days
View Details
NAICS: 332919
New
Federal
48--DIAPHRAGM,VALVE,FLAThe contract pertains to the procurement of a diaphragm, valve, flange component identified by part number N5431795 from Leslie Controls, Inc., under solicitation N0010426QBZ76, issued by the Naval Supply Systems Command Weapon Systems Support (NAVSUP WSS) Mech. The requirement is strictly defined by the specified part number and catalog information, with no accompanying technical drawings or data; compliance must align exactly with the manufacturer’s design, material, and dimensional specifications as outlined in the ordering data. The contract mandates adherence to NAVSUP WSS-MECH Code N94 technical documentation with a defined order of precedence, requiring full use of cited document revisions unless explicit written approval is obtained from the Contracting Officer for deviations. Any non-conformance, including delivery delays or material substitutions, must be formally justified with technical data demonstrating no adverse impact on the part’s quality, form, fit, or function, and must be submitted to the Government Quality Assurance Representative for review. Mercury or mercury-containing compounds are strictly prohibited from contact with the supplied item. The contractor must implement and maintain a government-acceptable inspection system, keeping complete records available for review throughout performance and beyond. Packaging must comply with MIL-PRF-23199 and MIL-DTL-24466 specifications for heat-sealed envelopes if cleanliness controls apply, and fire-retardant materials are no longer required. All packaging must be clearly marked with the item name “CUP, DIAPHRAGM DISK” and accompanied by a Certificate of Compliance per DI-MISC-81356 at the time of delivery, issued separately for each unique contract line item. The offeror must submit pricing valid for 60 days after the closing date, and contractual documents are deemed issued upon electronic or physical transmission. The solicitation includes mandatory compliance with cybersecurity certification, veteran and disability equal opportunity clauses, security prohibitions, small business representations, and the mandatory use of Workflow Pro. Delivery is governed by FOB destination, and all contractual obligations are subject to DoD distribution controls, with information labeled according to six defined distribution statement codes. The first submission of required documentation is due at the end of contract performance, and responses must be submitted by August 21, 2026.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 11 hours ago

DEADLINE

in 30 days
View Details
NAICS: 332912
New
Federal
48--VALVE,CHECKThe Government is seeking to procure a single unit of a check valve, NSN 3H-4820-011081854-L1, under a sole-source contract authority as outlined in FAR 6.302-1, due to the inability to acquire the necessary technical data or rights for repair from alternative sources. It has been determined that obtaining the data or rights is uneconomical and that reverse engineering the part is also not feasible, leaving only the current source capable of fulfilling the requirement. The delivery terms are FOB origin, and the contract action is not a competitive solicitation, though responsible parties are invited to submit capability statements within 45 days of the notice, or 30 days if awarded under an existing Basic Ordering Agreement. Any submissions will be considered solely to evaluate the potential for competition, but the Government retains full discretion to proceed as a sole-source award. The requirement is managed by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania, under solicitation number N0010426QZA58, with responses due by August 24, 2026. The contracting officer, Madison Gray, can be contacted for inquiries. Although the acquisition does not utilize FAR Part 12 commercial item procedures, interested parties may still indicate within 15 days whether they can satisfy the requirement using a commercial item, which may influence future procurement strategy. The Government is not committing to any course of action at this stage and is gathering information only to assess potential alternatives.
Fluid Power Valve and Hose Fitting Manufacturing

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335312
New
Federal
MOTOR,ALTERNATING CThis contract pertains to the repair of the MOTOR, ALTERNATING C with part number 87248000-3, issued under solicitation N0010426QTB82 by the Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania. The Government requires a strict Repair Turnaround Time (RTAT) of 141 days, measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility (CAV) system, to final Government acceptance. All repairs must comply with manufacturer specifications and technical documentation, including adherence to MIL-STD-130 Rev N for marking and strict controls on design or part substitutions governed by coded change procedures. The contract mandates Government Source Inspection and enforces FOB Origin shipping terms, with freight managed by the Navy under the CAV Statement of Work. Pricing is fixed and must include all associated costs for handling, restoring incomplete or damaged assets, and must be submitted alongside the proposed RTAT and comparison to the cost and lead time of purchasing a new unit. The contract is a total small business set-aside, requiring the awardee to comply with Buy American Act provisions and submit certifications under applicable federal programs. It includes an option for increased quantity exercisable within specified FAR timelines, with delivery continuing at the original unit rate unless otherwise agreed. Failure to meet the RTAT triggers a per-unit, per-month price reduction, capped at a specified maximum, without limiting the Government’s right to terminate for default. Records of all inspections and testing must be maintained for 365 days after final delivery. Contractors must prove they are authorized distributors of the original manufacturer and submit required certifications and representations, including those related to small business subcontracting, security exclusions, and annual compliance. All documentation provided by the Government is subject to distribution statements under OPNAVINST 5510.1, restricting unauthorized dissemination. The response deadline is July 29, 2026, and award will require bilateral acceptance after quote submission.
Motor and Generator Manufacturing

POSTED

about 11 hours ago

DEADLINE

in 7 days
View Details
NAICS: 335311
New
Federal
CABLE ASSY,MAIThis contract solicitation, identified by N0010426QXB46, seeks a Firm-Fixed Price quotation for the procurement of a CABLE ASSY,MAI under strict military specifications. The contractor must be an authorized source or distributor of the original equipment manufacturer, with proof of authorization required via official documentation submitted with the bid. All items must comply with MIL-STD-130 Rev N for item unique identification and DFARS 252.211-7003 for IUID requirements, including proper marking and traceability. The contract mandates adherence to MIL-STD-2073 for packaging, requires government source inspection, and specifies FOB Origin terms for delivery. Submission must include detailed pricing, delivery lead time, CAGE codes, cost breakdowns including profit rate, and a minimum 90-day quote expiration date, all sent electronically to the designated point of contact. The award will be bilateral, requiring written contractor acceptance prior to execution, and no substitutions or design changes are permitted without prior written approval from the NAVICP-MECH Contracting Officer, with six defined code categories governing allowable modifications. Quality assurance responsibilities rest entirely with the contractor, who must maintain complete inspection records for 365 days after final delivery. The solicitation explicitly excludes unauthorized distributors and emphasizes that any non-manufacturer offeror must provide documented proof of authorization from the OEM. All documents referenced are to be obtained through official DoD sources, with special handling required for NOFORN and classified materials. The response deadline is August 14, 2026, and performance is tied to the Mechanicsburg, PA location of the contracting office, with payments administered via Wide Area Workflow under HQ0339 and N00104 identifiers.
Power, Distribution, and Specialty Transformer Manufacturing

POSTED

about 11 hours ago

DEADLINE

in 23 days
View Details
NAICS: 332919
New
Federal
STEM,FLUID VALVEThis contract involves the supply of a critical stem component for a fluid valve, designated as Special Emphasis Level I material due to its essential role in a shipboard system where failure could result in catastrophic consequences including loss of life or vessel. The material must comply with NAVSEA Drawing 801-6404584 and be manufactured from QQ-N-286, Form 2, cold drawn, annealed and age hardened, with strict prohibitions against welding or weld repair. Quantitative chemical and mechanical analysis is mandatory, and certification data must be traceable to unique heat-lot markers permanently applied per MIL-STD-792, with exceptions for small surfaces requiring durable tags. Ultrasonic inspection of starting material and slow strain rate tensile testing are required, with testing limited to approved laboratories only. All certifications must be submitted electronically via WAWF to Portsmouth Naval Shipyard with ship-to, inspect-by, and accept-by codes N50286 and N39040, and no material may be shipped without prior acceptance. The contract mandates 100% inspection of traceability marks, documentation legibility, and compliance with specifications, with zero defect acceptance criteria for lot sampling. The contractor must operate under an ISO-9001 quality system with ISO-10012 and ISO/IEC 17025 calibration standards, and be subject to Government Quality Assurance at source. Electronic signatures on certification documents are accepted under controlled protocols and must be unique to the individual. All subcontracts must flow down these rigorous requirements, and any deviation or waiver requires explicit written approval from the Contracting Officer. The contract is issued under a total small business set-aside, is a DO-rated order under DPAS for national defense, and requires first article testing prior to production. Delivery is limited to 365 days post-contract effective date, with early or incremental delivery permitted at no additional cost. The material must be mercury-free, and marking or use of material designators is prohibited except for fasteners. All documentation, including chemical and mechanical test reports, must be positive, unqualified, and free from disclaimers.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 11 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 334417
New
Federal
LPI CHASSIS ASSY,2UThis contract pertains to the repair of the LPI CHASSIS ASSY, 2U under solicitation N0010426QYAD1, with a response deadline of August 21, 2026. The repair must adhere strictly to the contractor’s approved technical standards, manufacturer’s drawings, and government directives, with all work subject to Government Source Inspection. The item must be marked per MIL-STD-129 and delivered FOB Origin, with delivery timelines measured from physical receipt at the contractor’s facility as recorded in the Commercial Asset Visibility system. The contractor is required to submit a quote including unit and total price, repair turnaround time (RTAT), and an informal cost breakdown if applicable. RTAT is defined as the period from asset return to government acceptance, and final inspection and approval must be completed within this timeframe. The contract prohibits mercury contamination in any form, requiring strict controls and written approval for any mercury-containing components, with mandatory notification and warning labels if approved. The contract includes mandatory clauses covering Buy American requirements, cybersecurity maturity model certification, small business subcontracting, and contractor purchasing system administration, all effective as of early 2026. It enforces the use of Workflow Pro and mandates compliance with Navy-specific payment instructions, cybersecurity protocols, and security exclusions. Only authorized distributors of the original manufacturer are eligible to respond, requiring proof of authorization on company letterhead. Packaging must follow MIL-STD-2073, and all inspection records must be retained for 365 days after final delivery. The contracting officer retains full authority to approve or reject design or part substitutions, requiring formal change orders except for Code 1 changes. All documents referenced must be obtained through official DoD sources, and distribution of Navy-provided technical data is restricted per designated distribution statements. The awardee must provide CAGE codes for their facility, inspection location, and subcontractors, if applicable. Any deviation from technical or procedural requirements may lead to rejection or contract termination.
Electronic Connector Manufacturing

POSTED

about 11 hours ago

DEADLINE

in 30 days
View Details
NAICS: 333998
New
Federal
BOWL ASSEMBLYThis contract pertains to the repair of the BOWL ASSEMBLY under solicitation N0010426QJB83, with a required Repair Turnaround Time (RTAT) of 275 days measured from the physical receipt of the asset at the contractor’s facility as recorded in the Commercial Asset Visibility (CAV) system. The contract is firm-fixed-price, with delivery terms FOB Origin, and the Government will handle all freight through the CAV program. All repairs must comply with the contractor’s approved technical procedures, drawings, and MIL-STD-130 marking requirements, and any changes to design, material, or part number require prior written approval from the NAVICP-MECH Contracting Officer. The contractor is responsible for all inspection and testing per the original manufacturer’s specifications and must maintain complete records for 365 days after final delivery. Failure to meet the RTAT without excusable cause will result in a per-unit, per-month price reduction, capped at a specified amount, and may lead to termination for default. The contract mandates compliance with cybersecurity maturity certification, the mandatory use of Workflow Pro’s Assist Module, and adherence to Navy-specific security prohibitions and small business subcontracting requirements. A contract option is available to increase quantities within 365 days of award at the established unit price. Contractors must provide current CAGE codes for the awardee, inspection, and performance locations, along with pricing justification if the item has not been previously purchased by NAVSUP WSS or if pricing exceeds historical levels. If an asset is determined beyond repair, a negotiated testing and evaluation fee not to exceed a specified amount may apply. Only authorized distributors of the original manufacturer’s item are eligible to respond, and proof of authorization must accompany the quote. All documentation furnished by the Navy carries distribution statements that dictate data handling restrictions, and responses must include the quoted unit and total price, RTAT, and any capacity constraints that prevent meeting the Government’s required timeline.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 11 hours ago

DEADLINE

in 7 days
View Details
NAICS: 332919
New
Federal
VALVE,SAFETY RELIEFThis contract pertains to the procurement of a safety relief valve designated as SPECIAL EMPHASIS material (Level I), critical to the safe operation of a shipboard system where failure could result in catastrophic consequences including loss of life or vessel. The valve must conform precisely to Emerson drawing SW134 Revision H Interim Change 1, Type 2571T, with specific component exclusions and strict material requirements, including ASTM-A351 grade CF8 for the body. All components require full traceability from raw material through final assembly, with unique markings and certification linked to chemical and mechanical test reports. Mandatory testing includes proof pressure, set pressure, blowdown, and seat tightness tests in accordance with MIL-V-22549, with defined tolerances for pressure and duration. Welding and brazing must comply with S9074-AQ-GIB-010/248 or 0900-LP-001-7000, requiring prior approval of procedures and qualification data, and all filler metals must be certified with LOT numbers and verified prior to use. Non-destructive testing and quality documentation must be submitted and approved through the Wide Area Work Flow (WAWF) system with specific routing to N39040 and N50286 for inspection and acceptance, and no material may be shipped without government acceptance. The contractor must maintain a certified quality system in accordance with ISO-9001 and either ISO-10012 with ISO/IEC 17025 or MIL-I-45208 with MIL-STD-45662, subject to government inspection at source. Traceability and certification are non-negotiable; all material must be accompanied by signed, unqualified certificates of compliance verifying conformance to all specifications, including those for O-rings, thread inspection per FED-STD-H28, and mercury-free compliance. Configuration control is strictly enforced, requiring any proposed changes to be submitted as Engineering Change Proposals with full impact analyses. The contract mandates zero-defect acceptance criteria for final inspection using ANSI/ASQ Z1.4 or military standards, with 100% verification of traceability, test reports, and certification documentation. Subcontractors must be vetted and their work controlled to the same standards, and all quality records must be maintained and made available for government audit. The contract is issued under Emergency Acquisition Flexibilities and is a rated order
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 11 hours ago

DEADLINE

in 30 days
View Details