Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

ROE to PG&E for Vegetation Maintenance (PN-011518)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Parks and Recreation has issued a Right of Entry agreement to Pacific Gas and Electric authorizing access to Sue-meg State Park for routine vegetation maintenance along the Trinidad 1102 12 kV distribution line that runs through park boundaries. The work includes trimming eight trees at eight separate locations and removing nine trees at nine distinct sites to ensure safe and reliable power delivery while minimizing encroachment on park resources. All activities must adhere to state and federal environmental regulations including CEQA, NEPA, the Endangered Species Act, and Section 5024 of the Public Resources Code, as well as any additional conditions mandated by permitting agencies. The agreement is formally recorded under the title ROE to PG&E for Vegetation Maintenance PN-011518 and was posted as a forecast on June 30, 2025, with Rosalind Litzky, District Planner, designated as the primary point of contact for coordination and inquiries.

General Info

PG&E granted access to trim eight and remove nine trees in Sue-meg State Park for power line maintenance under environmental regulations.

Agency

California Parks and Recreation, Department of

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for ROE to PG&E Vegetation Maintenance PN-011518

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Rosalind LitzkyDistrict Planner

Full Description

Show more
Issue a Right of Entry (ROE) to Pacific Gas and Electric (PG&E) for access to Sue-meg to allow for routine vegetation maintenance along the existing Trinidad 1102 12 kV distribution line located on land within the parks' boundaries. In total, the proposed work will trim eight (8) trees at eight (8) locations and remove nine (9) trees at nine (9) locations. All work conducted pursuant to this ROE will comply with all state and federal environmental laws, including but not limited to CEQA, NEPA, the Endangered Species Act, Section 5024 of the Public Resources Code, and conditions specified by this ROE and other permitting agencies.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Federal
Luke AFB AUX Airfield Modernization
Solicitation # FA488726R0011
The Department of the Air Force, through the 56 Contracting Squadron, is soliciting proposals under solicitation number FA488726R0011 for the modernization of the auxiliary airfield at Luke Air Force Base in Arizona, with the procurement strictly limited to SBA-certified Women-Owned Small Businesses (WOSB). The contract, classified under NAICS code 237130 for Heavy and Civil Engineering Construction, requires offerors to be actively registered in the System for Award Management (SAM) and certified as a WOSB prior to award. Proposals must be submitted electronically no later than 31 July 2026 at 0200 PM MST via email or the DoD Secure Access File Exchange (DoD SAFE) system, with all submissions structured into three distinct volumes: Technical, Past Performance, and Price, each adhering to strict formatting rules including 12-point font, 1-inch margins, 1-line spacing, and page limits of 15 pages for the Technical volume and 20 pages for Past Performance. The solicitation emphasizes compliance with Federal Acquisition Regulation (FAR) provisions, including clauses on anti-kickback procedures, contractor reporting obligations, cybersecurity safeguards, quality control, and suspension of work, with deviations in effect for multiple clauses related to SAM registration, reporting, and inspection standards. The scope of work involves the engineering, furnishing, installation, and testing of replacement channel banks and new fiber optic cable systems at the auxiliary airfield, with performance expected to span 180 calendar days after issuance of the Notice to Proceed. Contract administration is governed by the Wide Area WorkFlow (WAWF) system for invoicing and payment processing, with payment to be made to the designated DoDAAC F87700 at Luke AFB, Arizona. Evaluation will follow a trade-off approach between Technical (construction work plan), Past Performance, and Price, where superior technical and performance capabilities may justify higher pricing. Proposals rated Marginal or Unacceptable in Technical or Limited Confidence or lower in Past Performance are ineligible for award. Special requirements include the use of independent, third-party Special Inspectors and Quality Control Managers not affiliated with the contractor, compliance with OSHA and NFPA standards, submission of a Special Inspections Project Manual, validation of testing laboratories by the USACE Material Testing Center, and adherence to detailed packaging and marking standards under 49 CFR for any hazardous materials. Documentation deliverables include as
FA4887 56 Cons Cc

POSTED

1 day ago

DEADLINE

in 17 days
View Details
NAICS: 237130
New
Federal
Y--Stegall Substation Stage 07 Phase 01
Solicitation # 89503226BWA000075
The Stegall Substation Stage 07 Phase 01 Project involves the replacement of aging and obsolete equipment at the substation with modern, reliable alternatives to enhance system performance and safety. Key upgrades include removing the 1960s-era control building and installing a new one, replacing over 30 disconnect switches, eliminating problematic brown glass insulators, reconducting and uprating the main bus, replacing two 115kV oil circuit breakers, and swapping the outdated 1990s GE D20 RTU with three modern SEL RTACs for improved control and monitoring. Additionally, a transfer bus dead end structure will be added between the 230kV east and west interconnects to increase operational flexibility. All work is focused on extending the substation’s operational life and ensuring grid reliability. This solicitation, numbered 89503226BWA000075, is issued by the Department of Energy’s Western-Rocky Mountain Region office located in Loveland, Colorado, with a response deadline of August 10, 2026. The contract is a Total Small Business Set-Aside under FAR 19.5 and falls under NAICS code 237130 for Electric Power Construction. The point of contact for inquiries is John W. Pratt, reachable via email at jpratt@wapa.gov or phone at 720-962-7166. The project is intended for small business contractors, and all work must be performed in accordance with federal procurement guidelines for energy infrastructure modernization.
Western-Rocky Mountain Region

POSTED

1 day ago

DEADLINE

in 14 days
View Details