Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on March 8, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Roof coatings

Closed
AG9164S11AA001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project covers approximately 800 gross square feet and requires the design and installation of a framing system, a 60 mil EPDM single-ply roofing system with a 3% slope, and three LED strip light fixtures, including one emergency backup. All work must comply with OSHA 29 CFR Part 1926, the Architectural Barriers Act Accessibility Standard of 2007, and Job Corps sustainability guidelines. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be awarded based on overall best value. Interested bidders must conduct a physical site visit and submit a signed attendance roster to be considered. Required submission documents include the MTC Bid for Lump Sum Contract form, a detailed cost breakout, and a bid bond equal to 20% of the base bid for any quote equal to or exceeding $25,000. Awarded contractors must provide performance and payment bonds for projects over $25,000, maintain specific insurance minimums, and adhere to California prevailing wage rates with weekly certified payroll reporting. Additionally, contracts valued at $40,000 or more are subject to FFATA reporting requirements.
Inland Empire Job Corps

POSTED

about 16 hours ago

DEADLINE

in 13 days
NAICS: 238160
New
SLED
26-11166 IFB Parapet Flashing Installation
Solicitation # 26-11166
Greene County, Missouri, is soliciting bids under solicitation number 26-11166 for the installation of new roof flashing on the parapet wall of the Historic Courthouse located at 940 N Boonville Ave., Springfield, MO. The scope of work includes the removal of existing metal flashing, seals, and damaged underlayment, followed by the inspection and repair of the roof deck and insulation. The contractor is required to install 3/4 inch exterior grade plywood fastened to the masonry cap, a 60mil TPO roof membrane, and weldable metal flashing using high-performance elastomeric or polyurethane adhesives to ensure a permanent watertight seal. The contract will be awarded to the lowest responsive responsible bidder, with evaluation factors including prior work experience and the proposed time of completion. Bidders must submit their proposals via the Greene County Electronic Bidding Portal by the specified deadline. Required submission documents include a manually signed title page, an Experience Statement demonstrating completion of comparable projects, an E-Verify Signature Page, and a Federal Tax ID. For contracts exceeding 5,000 dollars, a notarized affidavit is required. The successful contractor must provide performance and payment bonds at 110 percent of the contract value and comply with the Missouri Domestic Product Procurement Act, Clean Air and Clean Water Acts, and prevailing wage statutes if the project exceeds 75,000 dollars. Final acceptance of the work will be conducted at the destination by an authorized representative of the County.
Greene County

POSTED

about 18 hours ago

DEADLINE

in 23 days
NAICS: 238160
New
Federal
26Z1AY6_Replace Roofing_FCC Butner
Solicitation # 15B10627PR000102
The Federal Bureau of Prisons is conducting market research through a Sources Sought Notice for a firm-fixed-price construction contract to replace the roofing system at the Federal Correctional Complex (FCC) Butner in North Carolina. The project involves the complete removal and disposal of approximately 35,000 square feet of flat EPDM roofing and 27,000 square feet of pitched shingle roofing. The contractor will install a new 80-mil TPO flat roof system with tapered EPS insulation and a 30-year Class A asphalt shingle system on pitched areas, ensuring all penetrations, drains, and flashing are watertight and manufacturer-approved. The estimated project magnitude is between 1,000,000 and 5,000,000 dollars, with an estimated performance period of 637 calendar days. This opportunity is specifically seeking 8(a) contractors under NAICS code 238160, with a small business size standard of 19.0 million dollars in average annual receipts. The awarded prime contractor must provide all labor, materials, and equipment, maintain a 20-year non-prorated watertight warranty, and adhere to NRCA standards and FAR 28.102 for performance and payment bonds. Due to the secure nature of the facility, all personnel must undergo criminal background checks and security clearance investigations, which may take up to 35 days. Interested 8(a) firms must be registered in SAM and respond by adding their names to the Interested Vendors List and submitting a Market Research Questionnaire by October 26, 2026.
Fao

POSTED

about 20 hours ago

DEADLINE

in 5 days

General Info

NAICS

238160 - Roofing Contractors

Place of Performance

17053 N. Shafter Ave., SHAFTER, CA, 93263, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Ars Pwa Aao Acq/per Prop
Contacts1 person available
OfficeALBANY, CA, 94710, USA
Office AddressALBANY, CA, 94710, USA

Full Description

Show more
STATEMENT OF WORK 1.0 CONTRACT PROJECT: 1.1 Project Number: H814-11 1.2 Project Title: Install insulated and reflective roof, bldg #125, Shafter, CA 2.0 PROJECT CONTACT PERSONS: 2.1 CONTRACTING OFFICER (CO): Saul Garcia, Purchasing Agent USDA, ARS, PWA, SJVASC 9611 S. Riverbend Ave Parlier, CA 93648 Phone: (559) 596-2956 Email: saul.garcia@ars.usda.gov 2.2 ENGINEERING PROJECT MANAGER (EPM): Adam Salvadalena (EPM) USDA, ARS, PWA 800 Buchanan Street Albany, California 94710 Phone: (510) 559 6002 FAX: (510) 559-6495 Email: Adam.Salvadalena@ars.usda.gov 2.3 CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE (COTR) Vic Penner, Engineering Technician USDA, ARS, PWA, WICSRU 17053 Shafter Ave Shafter, CA 93263 Phone: (661) 746-8006 Email: vic.penner@ars.usda.gov 2.3 RESEARCH PROGRAM REPRESENTATIVES (RPR): Dr. Dale Spurgeon, RL USDA, ARS, PWA, WICSRU 17053 Shafter Ave Shafter, CA 93263 Phone: (661) 746-8001 Email: dale.spurgeon@ars.usda.gov 2.4 AREA SAFETY AND HEALTH MANAGER (ASHM): TBD, ASHM USDA, ARS, PWA 800 Buchanan Street Albany, California 94710 Phone: (510) 559 6024 FAX: (510) 559-5666 Email: Alvin.Humphrey@ars.usda.gov 3.0 SCOPE OF SERVICES: The Contractor shall provide all professional services necessary and such required services shall be in accordance with the requirements as described herein and on attached contract documents. Background: Building #125 is a Butler building, approximately 73' 6" by 35' 6" (about 2600 ft), having a low-slope (<5% pitch) formed metal roof. Formed, flat-topped roof ridges (1 " height, 2" width) are spaced at 12" intervals. The building has one HVAC unit mounted above the roof surface, which is penetrated by 10 assorted vents or exhausts. Metal rain gutters extend beyond the eave drip line on both sides of the building length. Scope: Turnkey supply and installation of a monolithic roof membrane and insulation. Applicators shall have a minimum of 3 years experience in the application of waterproofing materials of the type specified. Applicator shall posses a current "Qualified Applicator" certificate from the specified waterproofing manufacturer. 3.1 New sprayed polyurethane foam insulation over the existing metal roof. 3.1.1 Foam shall be bio-based and a USDA Bio-preferred product, as quantified through ASTM D6866 Biobased Content Testing. 3.1.2 Neatly terminate the sprayed-in-place polyurethane foam on all vertical surfaces (pipe penetrations, vents, mechanical equipment, parapet walls, etc.) a minimum of 3" 3.1.3 Foam surface shall be between smooth to orange peel in surface texture. Popcorn texture is not acceptable. 3.1.4 Foam thickness shall provide a minimum R-value of R-19, with a maximum variance of +/- ". 3.1.4.1 Slope shall be confirmed (or adjusted as necessary) to have a minimum " each foot slope for drainage 3.1.5 Substrate preparation of existing metal deck 3.1.5.1 Surface shall be free from loose dirt, stone, debris, moisture, and shall be in stable condition. Any work on the area to receive this application shall be completed prior to installation. 3.1.5.2 Added mechanical fastening and minor rust removal on existing metal roof shall be performed to the satisfaction of the roofing system manufacturer's approval. 3.1.5.3 Cleaned and primed with foam insulation manufacturer's approved products 3.2 New 100% Acrylic Elastomeric Latex Coating applied over the new polyurethane foam insulation. 3.2.1 Coating shall meet the minimum criteria set forth in ASTM D6038 3.2.2 The coating shall carry an edge-to-edge 15-Year Renewable System Warranty, covering coating replacement and labor in the event of a leak due to deterioration, where the deterioration is the result of ordinary weather conditions. 3.2.3 Coating shall be extended to coat the existing Facia and soffit. 3.2.4 CRRC rated Solar Reflectance of 0.82 minimum (initial), 0.72 minimum (3 year) 3.2.5 CRRC rated Thermal Emittance of 0.87 minimum (initial), 0.87 minimum (3 year) 3.2.6 CRRC rated SRI of 103 minimum (initial), 89 minimum (3 year) 4.0 PROJECT REQUIREMENTS: The Contractor shall be responsible for verifying site conditions, making quantity take offs, obtaining accurate measurement of existing conditions, and performing any act or operation which may be necessary to properly troubleshoot the system, including the automated gate. 4.1 The Contractor shall coordinate the site investigations with the COR. 4.2 All finished work shall be strong and rigid, neat in appearance, square, true and free of defects, warp or buckle. 5.0 GENERAL REQUIREMENTS: 5.1 Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor. 5.2 Installation: It shall be the responsibility of the Contractor to complete work in accordance with the manufacturer's recommendations and Industry Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with applicable codes and recommendations, the Contractor shall bring it to the attention of the Contracting Officer for immediate resolution. 5.3 Submittals: Manufacturer's descriptive literature/shop drawings for all materials shall be submitted to the CO for review. The descriptive literature/catalogue cuts shall be annotated/highlighted with sufficient clarity so as to identify the products proposed for this project and show its conformance with contract requirements. Submittals shall include: (a) Contractor's schedule (b) List of subcontractors (c) Shop Drawings: Include complete details of fence and gate construction, fence height, post spacing, dimensions and unit weights of framework and concrete footing details. (d) Product Data: Provide manufacturer's catalog cuts with printed specifications. Manufacturer shall provide certification of compliance with material specifications. 5.4 Quality Control: The work performed under this contract shall be subject to continuous audit by the COR. Quality control is the exclusive responsibility of the Contractor. 5.5 Protection of Work and Property/Safety Requirements: (a) The Contractor shall protect the work, the site, and all existing property and structures within the limit of construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor's expense, to pre-damaged condition to the satisfaction of the COR. (b) Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities for protection and security. (c) The Contractor shall implement, and provide to the Contracting Officer (CO) for review, a site specific, SITE SAFETY AND HEALTH PLAN in accordance with all local, state and federal regulations. The plan shall address, at a minimum all responsible parties by name, all safety/health hazards, personal protective equipment and other hazard controls, all required training, emergency procedures, and other required information to perform the work. The plan shall be implemented by contractor supervisor signature. Two copies shall be provided to the Contracting Officer and one copy will be maintained at the site. In the event of changing site conditions or hazards, the plan shall be appended in writing and a copy of the change provided to the CO and COR. If a Job Safety Analysis form is also required, submit prior to beginning work. 5.6 Temporary Facilities: (a) Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if available and, if requested. Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through his own negligence. (b) Should the Contractor require any power or utility shutdown during construction, he shall receive approval for such shutdown from the COR three working days prior to this need. 5.7 Materials and Equipment: (a) The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer's latest standard design. (b) All materials and equipment to be incorporated in the work shall be handled and stored by the manufacturer, fabricator, supplier and Contractor before, during and after shipment in a manner to prevent warping, twisting, breaking, chipping, rusting and any injury, theft or damage of any kind whatsoever to the materials and equipment. All materials and equipment furnished by Contractor shall be subject to inspection and approval by the CO/COR. 5.8 Cleanup: The construction site shall be kept clean and free of debris at all times. Upon completion of project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the COR. 5.9 Warranty: Submit data concerning the standard one year warranty for workmanship, including the warranty period (dates), and warranty contacts with names, addresses and telephone numbers. (a) Extended Equipment/Product Warranties: Obtain and furnish to the Contracting Officer all written warranties for equipment/products that have extended warranties (warranty periods exceeding the standard one-year warranty) furnished under the contract. The warranty period shall begin on the same date as project acceptance and shall continue for the full/product warranty period. The warranties shall be fully executed and delivered to the Contracting Officer prior to final acceptance of the facility. 5.10 Final Payment/Contract Closeout: The following submittals are required: (1) General and Subcontractors one (1) year warranty on work. (2) All warrantees from manufacturers covering equipment. (3) Documentation of all set points and control strategies implemented in the automatic gate. 6.0 PROJECT SCHEDULE: 6.1 Project duration is 60 Calendar days from Notice to Proceed. 6.2 This project has the potential of impacting research, therefore coordination of electrical outages (if any), and work within the laboratory or offices spaces is essential.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS