Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Texas was posted on December 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Roof Replacement for West, Polk, Fallbrook and Northwest BOF'S

Closed
RFTP Doc1797074478State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
SLED
Pier 69 Third Floor Terrace RepairThe contract involves the complete demolition of the existing roof system on the third floor east terrace at Pier 69, including removal of pavers, drainage mat, and waterproof membrane. It requires the installation of a new roof system featuring a pedestal-mounted layout with thinner pavers, designed to improve drainage performance and long-term durability. A critical component of the project is the construction and installation of a barrier wall to protect the underlying structural steel beams from future corrosion. Additional work includes the use of a crane to safely remove and reintegrate planters and other materials, ensuring minimal disruption and proper handling of heavy equipment and components. The work is scoped specifically to the east terrace area and is being managed by the Port of Seattle through its Waterfront Project Management division. The project is forecasted with a NAICS code of 238160, indicating it falls under roofing contractor services, and is scheduled for posting on July 15, 2026. Primary point of contact is Todd Rehm, reachable via phone or email, with Samuel Hansen listed as the project manager. The place of performance is at Pier 69 in Seattle, though specific city and state details are not listed in the data. There is no solicitation number assigned yet, and the type of set aside or contracting mechanism has not been specified. All work must align with the Port’s requirements for structural integrity, water management, and corrosion protection, with careful coordination expected around crane operations and material logistics.
Waterfront Project Management

POSTED

about 4 hours ago

DEADLINE

N/A

General Info

Agency

Texas → Metro HoustonView Agency

NAICS

238160 - Roofing ContractorsView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

(1)

Amend 004-RFTP-Doc1797074478-Q-A.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Metro Houston
Contacts1 person available
OfficeTX, USA
Organization / Agency
Texas → Metro Houston
View Agency Profile
Office AddressTX, USA
Contacts
Michael Diettel

Full Description

Show more
The Scope of Work for this project includes providing all necessary materials, labor, equipment, tools, supervision, support services and construction activities required to prepare the site and complete a full roof replacement. This includes the removal of existing roofing and installation of new roof system and associated components as specified in the construction documents NA SB goal.