This Solicitation opportunity from Department Of Defense was posted on February 22, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Roof Replacement Project

Closed
W91238-17-R-0014Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project covers approximately 800 gross square feet and requires the design and installation of a framing system, a 60 mil EPDM single-ply roofing system with a 3% slope, and three LED strip light fixtures, including one emergency backup. All work must comply with OSHA 29 CFR Part 1926, the Architectural Barriers Act Accessibility Standard of 2007, and Job Corps sustainability guidelines. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be awarded based on overall best value. Interested bidders must conduct a physical site visit and submit a signed attendance roster to be considered. Required submission documents include the MTC Bid for Lump Sum Contract form, a detailed cost breakout, and a bid bond equal to 20% of the base bid for any quote equal to or exceeding $25,000. Awarded contractors must provide performance and payment bonds for projects over $25,000, maintain specific insurance minimums, and adhere to California prevailing wage rates with weekly certified payroll reporting. Additionally, contracts valued at $40,000 or more are subject to FFATA reporting requirements.
Inland Empire Job Corps

POSTED

about 7 hours ago

DEADLINE

in 13 days
NAICS: 238160
New
SLED
26-11166 IFB Parapet Flashing Installation
Solicitation # 26-11166
Greene County, Missouri, is soliciting bids under solicitation number 26-11166 for the installation of new roof flashing on the parapet wall of the Historic Courthouse located at 940 N Boonville Ave., Springfield, MO. The scope of work includes the removal of existing metal flashing, seals, and damaged underlayment, followed by the inspection and repair of the roof deck and insulation. The contractor is required to install 3/4 inch exterior grade plywood fastened to the masonry cap, a 60mil TPO roof membrane, and weldable metal flashing using high-performance elastomeric or polyurethane adhesives to ensure a permanent watertight seal. The contract will be awarded to the lowest responsive responsible bidder, with evaluation factors including prior work experience and the proposed time of completion. Bidders must submit their proposals via the Greene County Electronic Bidding Portal by the specified deadline. Required submission documents include a manually signed title page, an Experience Statement demonstrating completion of comparable projects, an E-Verify Signature Page, and a Federal Tax ID. For contracts exceeding 5,000 dollars, a notarized affidavit is required. The successful contractor must provide performance and payment bonds at 110 percent of the contract value and comply with the Missouri Domestic Product Procurement Act, Clean Air and Clean Water Acts, and prevailing wage statutes if the project exceeds 75,000 dollars. Final acceptance of the work will be conducted at the destination by an authorized representative of the County.
Greene County

POSTED

about 9 hours ago

DEADLINE

in 23 days
NAICS: 238160
New
Federal
26Z1AY6_Replace Roofing_FCC Butner
Solicitation # 15B10627PR000102
The Federal Bureau of Prisons is conducting market research through a Sources Sought Notice for a firm-fixed-price construction contract to replace the roofing system at the Federal Correctional Complex (FCC) Butner in North Carolina. The project involves the complete removal and disposal of approximately 35,000 square feet of flat EPDM roofing and 27,000 square feet of pitched shingle roofing. The contractor will install a new 80-mil TPO flat roof system with tapered EPS insulation and a 30-year Class A asphalt shingle system on pitched areas, ensuring all penetrations, drains, and flashing are watertight and manufacturer-approved. The estimated project magnitude is between 1,000,000 and 5,000,000 dollars, with an estimated performance period of 637 calendar days. This opportunity is specifically seeking 8(a) contractors under NAICS code 238160, with a small business size standard of 19.0 million dollars in average annual receipts. The awarded prime contractor must provide all labor, materials, and equipment, maintain a 20-year non-prorated watertight warranty, and adhere to NRCA standards and FAR 28.102 for performance and payment bonds. Due to the secure nature of the facility, all personnel must undergo criminal background checks and security clearance investigations, which may take up to 35 days. Interested 8(a) firms must be registered in SAM and respond by adding their names to the Interested Vendors List and submitting a Market Research Questionnaire by October 26, 2026.
Fao

POSTED

about 11 hours ago

DEADLINE

in 6 days

General Info

NAICS

238160 - Roofing Contractors

Place of Performance

Hill AFB, UT, USA

Set-Aside

SBA

Documents

23

A01.07 Amendment #2 - DDHU Building 845 Roof Replacement

PDF, High priority: read this first1 page · amendment
High

A01.07 Atch 7 - Instructions to Offerors

PDF, High priority: read this first11 pages · rfp
High

Attachment 2 - Supplemental Contract Requirements: Bldg 845 Roof Replacement

PDF, High priority: read this first1 page · specifications
High

B845 Roof Replacement Site Walk Instructions

PDF, High priority: read this first2 pages · special-notice
High

Bldg 845 Roof Replacement SOW - Hill AFB

PDF, High priority: read this first7 pages · sow
High

Building 845 Roof Replacement - Project Manual & Asbestos Report

PDF, High priority: read this first391 pages · specifications
High

Building 845 Roof Replacement - Project Manual & Specifications

PDF, High priority: read this first416 pages · specifications
High

DDHU Bldg. 845 Replace Roof - Acknowledgement Statement

PDF, High priority: read this first3 pages · rfp
High

DDHU Bldg. 845 Replace Roof - Attachment 4 Acknowledgement Statement

PDF, High priority: read this first4 pages · rfp
High

DDHU Replace Roof Bldg. 845, Hill AFB SOW

PDF, High priority: read this first7 pages · sow
High

DDUH Bldg. 845 Replace Roof - Wage Determination

PDF, High priority: read this firstwage-determination
High

Hill AFB Asbestos/LBP Abatement Contractor Requirements

PDF, High priority: read this first4 pages · specifications
High

Hill AFB FY16 Building 845 Roof Replacement - Bid Inquiry Responses

PDF, High priority: read this first31 pages · q-and-a
High

Hill Air Force Base Base Facility Design Standard (2017)

PDF, High priority: read this first86 pages · specifications
High

W91238-17-R-0016 Amendment 0002

PDF, High priority: read this first10 pages · amendment
High

W91238-17-R-0016 Amendment 0003

PDF, High priority: read this first2 pages · amendment
High

Hill AFB Building 845 Roof Replacement - ProjectNet Inquiries

PDF, Low priority23 pages · q-and-a
Low

NAVFAC/USACE Past Performance Questionnaire (Form PPQ-0)

DOC, Low priority4 pages · past-performance
Low

A01.07_Atch_17_M-101_102_601.pdf

PDF

A01.07_Atch_18_Badging_Requirements.pdf

PDF

A01.07_Atch_5_Solicitation_Appendix_1_DDHU_B845_Roof_RTA_Drawings_Corrected.pdf

PDF

A01.07_Solicitation_%28FINAL%29.pdf

PDF36 pages

A01.12_Atch_24_G-003_Corrected.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jan 17, 2017 to Feb 21, 2017. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Feb 21, 2017 to Feb 25, 2017. The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Sacramento
Contacts2 people available
OfficeSACRAMENTO, CA, 95814-2922, USA
Office AddressSACRAMENTO, CA, 95814-2922, USA
Contacts
Ismail MAJ KhanContracting
Ray GreenheckContracting Officer

Full Description

Show more
DLA B845 Roof Replacement Project The Government anticipates issuing a Request for Proposals (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the DLA B845 Roof Replacement Project. This acquisition is proceeding as Small Business Set Aside request for proposals. Project Description: This project replaces the existing roof system on a 480,000 square foot (sf) warehouse located on Hill Air Force Base UT. Please note that Bays G and H are currently occupied by the Air Force which will also be part of this project. The existing roof system will be removed in its entirety and a new premium two ply modified bitumen system with granulated cap sheet over a cover board and multi layered (3") polyisocyanurate insulation over a base ply will be installed. In order for the roof insulation to meet the current building envelope requirement of ASHRAE 189.1, the R-value will be determined by life cycle cost analysis (LCCA) with R-25 minimum. R-value range for LCCA is R-25 to R-60. LCCA will consider solar integrated roof and cool roof features. Building 845 is a concrete structure building with concrete exterior walls and deck. Drainage is provided by roof drains located at the outside perimeter of the roof. Slope noted in the roof appears to be provided by the structure with support of tapered insulation crickets at the roof drains. The roof is 560,000 sq. ft., which is divided in to Seven (7) bays, (80,000 SF Bay) that are separated by expansion joints. Bays A through E and Bay H, approximately 480,000 SF are occupied by DLA. One of the bays is split in to two section (F & G) Approximately 80,000 SF and is occupied by the Air Force. The existing roofing system is gravel coated, 4 ply built-up asphalt roofing plies over insulation with a 2 ply asphalt applied to the concrete topping slab. The insulation on the roof consists of 2 layers of " perlite with a " base layer of polyisocyanurate. It is assumed that the insulation thickness is uniform with the exception of the crickets provided at the drain locations. Thus the presumption was made that the structure provides the slope in the roof and not the insulation. The thermal resistivity is estimated to be less that R-9 with today's insulation values. The flashings at the curb areas (equipment and expansion joint curbs) have a modified bitumen granulated sheet for a base ply. The existing roof system was likely installed in the late 1980s and is nearing the end of its useful life. There is a possibility of asbestos in the existing roof system that will need to be abated in the project. The penetrations through the roof system consist of air ventilators, "capped" roof curbs, exhaust vents, plumbing vents, roof drains, pitch pans, equipment curbs, and piping penetrations. Water mitigation for these roof sections is provided by roof drains located at the outside perimeter edge with crickets located between drains. Access to the roof areas is provided by a ladder. While the roof areas presently continue to perform and it appears that some previous repairs have been made, the warrantable condition and the expected life of the existing roofing system has been exceeded in all areas. The Government estimates issuing the Notice to Proceed (NTP) on or about 29 March 2017. The period of performance for construction is estimated to be 365 calendar days from NTP. This time frame is critical component of this project and is non-negotiable. In accordance with the DFAR 236.204, the magnitude disclosure of this construction project is between $10,000,000 and $25,000,000. This proposed contract action will be conducted using FSC Code: Y1GZ and North American Industry Classification System Code (NAICS): 238160 and the small business size standard is $15 million. The RFP is estimated to be issued on or about 17 January 2017. The RFP will be issued on the Government Point of Entry known as FedBizOpps (www.fbo.gov). All plans and technical documents will be uploaded onto FedBizOpps as part of the RFP, available for inspection without charge. The estimated due date for proposals will be on or about 16 February 2017. Once issued, the RFP will identify a firm due date/time for receipt of proposals. The site visit/pre-proposal conference date, time and location will be identified in the solicitation. BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS. The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the 'ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: XYZ Construction (Prime/Sub). IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY CHANGES TO THIS NOTICE.

More opportunities from Department Of Defense → W075 Endist Sacramento

Same awarding agency

NAICS: 237990
Federal
USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA
Solicitation # W9123826BA013
The USACE SPK is soliciting design-bid-build construction services for the renovation of three critical irrigation pumping stations—Elkhorn, Riverside, and Pritchard—located along the Garden Highway Levee in Sacramento, California. The project scope involves removing existing discharge piping that penetrates the levees and installing new piping that traverses over the levees to connect with landside irrigation canals. Additional requirements include levee excavation, backfilling, pavement restoration, and utility relocation. The estimated target price range for this effort is between $10,000,000 and $15,000,000, with a total period of performance of 1,095 calendar days from the date of the Notice to Proceed. This requirement is pursued through full and open competition without a set-aside, falling under NAICS code 237110. Eligible offerors must be registered in SAM and PIEE and provide a surety letter confirming bonding capability for a single action of at least $10,000,000. The contract is subject to the Davis-Bacon Act and EM 385-1-1 safety standards. Key administrative requirements include the use of the Resident Management System (RMS) for payment requests and the maintenance of a rigorous Quality Control program. Proposals must be submitted by November 3, 2026, and must include a completed SF 1442, bid guarantee, and a pre-award survey.
Other Heavy and Civil Engineering Construction

POSTED

12 days ago

DEADLINE

in 14 days
View Details
NAICS: 237990
Federal
USACE SPK DBB Construction - Sacramento River East Levee Contract 5 (SREL C5), Sacramento, California
Solicitation # W9123827X1CQR
The United States Army Corps of Engineers Sacramento District is conducting market research via Sources Sought Notice W9123827X1CQR for a potential levee repair and remediation project known as the Sacramento River East Levee Contract 5 (SREL C5). Located in Sacramento, California, the project involves remediating approximately 0.4 miles of levee segments south of downtown. The scope of work includes the construction of seepage and stability berms and buried curb walls, utility relocation and protection, soil management, and site restoration. The government estimates the construction value between $6,000,000 and $9,000,000, with an anticipated performance period of 411 calendar days from the Notice to Proceed. The government anticipates issuing a firm-fixed-price solicitation in mid-November 2026, with an intended award date in mid-February 2027. The requirement falls under NAICS code 237990 for Other Heavy and Civil Engineering Construction and Product Service Code Y1LC. Depending on the response from small business concerns, the acquisition may be set aside for small businesses under FAR 52.219-14 or competed full and open, in which case FAR 52.236-1 regarding self-performance would apply. Interested parties must submit a capability statement by 11:00 a.m. PT on October 23, 2026, detailing their experience with similar projects over the last six years and providing a surety letter to prove bonding capability.
Other Heavy and Civil Engineering Construction

POSTED

12 days ago

DEADLINE

in 3 days
View Details
NAICS: 541620
Federal
USACE Sacramento District (SPK) $47.2M Planning, Environmental, and Cultural Services (PECS) MATOC
Solicitation # W9123826RA024
The USACE Sacramento District is soliciting for a 47.2 million dollar Multiple Award Task Order Contract (MATOC) under solicitation W9123826RA024 for Planning, Environmental, and Cultural Services (PECS). This contract, categorized under NAICS code 541620, provides comprehensive support for civil works and military actions throughout the feasibility, design, construction, and operations and maintenance phases. The scope of work encompasses environmental planning and compliance, including NEPA and CEQA tasks, species and habitat surveys, air and noise assessments, and construction monitoring. Additionally, the contract covers cultural resources services, focusing on Section 106 compliance, NHPA, NAGPRA, and ARPA support, tribal consultations, the development of Memoranda of Agreement and Programmatic Agreements, and specific archival and curation requirements. Interested vendors are encouraged to attend a virtual industry meeting on September 15, 2026, at 11:00 AM Pacific Daylight Time via Microsoft Teams. To participate, vendors must submit a capability statement not exceeding four pages to the designated contracting email address prior to the meeting. The primary point of contact for this opportunity is Sean Summer, and the contract is managed by the Department of Defense through the USACE Sacramento District office located in Sacramento, California.
Environmental Consulting Services

POSTED

28 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS