Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Massachusetts was posted on June 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Roofing Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Federal
Building 20 Atrium Leak Mitigation
Solicitation # 127EAX26Q0107
Solicitation 127EAX26Q0107 is a combined synopsis and request for quotation issued by the USDA for the Building 20 Atrium Leak Mitigation project located at the National Centers for Animal Health in Ames, Iowa. This firm fixed price acquisition is a total small business set-aside under NAICS code 238160 for roofing contractors. The primary objective is to perform comprehensive inspection and testing of the Building 20 atrium system to identify the sources of water leaks. The contractor must deliver a prioritized report in zipped PDF format that includes photographic documentation of the system's condition, recommended repairs, and associated cost estimates to assist the government in budgeting and planning. The project requires a qualified contractor whose personnel possess at least five years of experience investigating leaks in commercial building atrium systems. Key personnel requirements include an OSHA-certified competent person with 30 hours of training serving as the on-site superintendent, while all other employees must have at least 10 hours of OSHA training. Work must commence within 10 calendar days of the notice to proceed and be completed within 90 calendar days. Award will be granted to the highest technically rated offeror, provided the price is fair and reasonable and past performance is acceptable or neutral. Proposals must be submitted as three separate PDF documents, including a signed SF1442, a price proposal for the base period, and a technical proposal covering the work plan, key personnel, and performance schedule.
Csa Southwest 7 Usda-Fs

POSTED

about 21 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The contract calls for the installation of an asphalt shingle roof system on the field house structure located in Lord Square, Ipswich, Massachusetts, with a ZIP code of 01938. This is a subcontract under NAICS code 238160, which specifically pertains to roofing contractors, and is managed by the IPS09 - Central Office under the Massachusetts agency. The solicitation was posted on June 30, 2026, with a mandatory response deadline of July 28, 2026, at 3:15 PM. The work will require full compliance with industry standards for roof installation, including proper underlayment, flashing, ventilation, and shingle application to ensure long-term durability and weather resistance. All materials and labor must be performed by qualified subcontractors capable of delivering a code-compliant, structurally sound roof system tailored to the field house’s architectural specifications. The location of performance is clearly defined, and bidders are expected to coordinate logistics and scheduling to meet the stated deadline without delay.

General Info

Install asphalt shingle roof on field house in Ipswich, MA, by July 28, 2026, per code standards.

Agency

Massachusetts → IPS09 - Central OfficeView Agency

NAICS

238160 - Roofing ContractorsView NAICS

Place of Performance

Lord Square Ipswich, MA, 01938, USA

Set-Aside

NONE

Documents

This scope was carved out of IPS Project 2702.062926.

The full solicitation package (13 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Athletic Field House

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → IPS09 - Central Office
ContactsNo contacts available
OfficeN/A
Organization / Agency
Massachusetts → IPS09 - Central Office
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of asphalt shingle roof system on the field house structure.

More opportunities from Massachusetts → IPS09 - Central Office

Same awarding agency

NAICS: 541611
SLED
OPM RFS - Elementary School Project
Solicitation # 27.100.4
The Ipswich Public School District is seeking a qualified Owner's Project Manager (OPM) to provide comprehensive project management services for the design, construction, addition to, and/or renovation of the Paul F. Doyon Memorial Elementary School in Ipswich, Massachusetts. The project has an estimated total cost between 125 million and 175 million dollars. The OPM will initially represent the owner during the feasibility study and schematic design phases, with the potential for the contract to extend through design development, construction documents, bidding, construction, and final closeout. Key responsibilities include analyzing prior design materials, evaluating five potential site locations, managing community engagement, and identifying construction management alternatives such as CM-at-Risk. The solicitation process includes a pre-bid conference on September 4, 2026, with a final bid opening on September 30, 2026, at 1:15 PM. The anticipated contract execution date is December 21, 2026. Evaluation of respondents is based on weighted criteria including documented performance, working relationships, and thorough knowledge of the Massachusetts State Building Code, ADA regulations, and Commonwealth procurement laws. The contract utilizes an hourly invoicing structure for basic services, with reimbursable expenses billed at actual cost plus 10 percent. Performance is divided into three primary phases: the feasibility and schematic design phase (20 to 24 months), the design development and bidding phase (18 to 24 months), and the construction phase (24 to 36 months).
Administrative Management and General Management Consulting Services

POSTED

29 days ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS