This Solicitation opportunity from Department Of Health And Human Services was posted on April 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cancelled Rosebud Lift Station Construction

Closed
75H70126R00018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 9 hours ago

DEADLINE

in 4 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 9 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract involves the complete removal and replacement of the existing lift station located at 1319 Soldier Creek Road, Rosebud, South Dakota, serving the local hospital, tribal program buildings, and quarters units. Due to significant growth and repeated failures of the current pumps, the project aims to upgrade the system to accommodate increased capacity and future expansion, including replacing standard submersible pumps with chopper pumps to better handle debris. The new lift station will feature a wet well, dry well, upgraded pumps, a force main connection, and a modern control system to monitor flow and equipment status. The existing lift station’s components will be demolished following installation of the new facility. This firm-fixed-price contract, estimated between $500,000 and $1,000,000 with a performance period of 120 calendar days, is a presolicitation set aside for Indian Small Business Economic Enterprise (ISBEE). The project addresses the urgent need for reliable wastewater infrastructure due to ongoing hospital and tribal expansion and recent pump failures requiring emergency sewage disposal. The solicitation is managed by the Department of Health and Human Services’ Division of Engineering Services in Seattle, with points of contact available for further information. Compliance with Tribal Employment Rights Ordinance (TERO) requirements is also mandated.

General Info

Remove and replace lift station at Soldier Creek Rd with upgraded pumps, controls, ISBEE set aside.

Agency

Department Of Health And Human Services → Division Of Engineering Svcs - SeattleView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Rosebud, SD, 57570, USA

Set-Aside

ISBEE

Documents

(31)

MB01-A04+QA+and+Offer+Due+Date.pdf

PDF

Final Release of Claims Document

DOCXrelease-of-claims

Self-Performed Calculation Sheet for Limitations on Subcontracting

DOCX3 pagesself-performed-calculation-sheet

J01+Plans+RLSC+13Feb2026.pdf

PDF

Optional+Past+Performance+Questionnaire.docx

DOCX

MB01-A06+Update+Specs+and+Offers+Due+Date.pdf

PDF

MB01-A03+Update+Attachments+QAs+RLSC+75H70126R00018.pdf

PDF

Optional+Company+Specialized+Experience+Form.pdf

PDF

MB01-A05+Pump-Offers+Due+Date.pdf

PDF

Davis-Bacon Weekly Certified Payroll Form WH-347

PDF2 pageswage-determination

South Dakota Lift Station Design Plans GP24RB401H02

PDF12 pagesspecifications

MB01-A02+Bid+Bond+RLSC+75H70126R00018.pdf

PDF

MB01-A01+Replace+Attachment.pdf

PDF

SOW Rosebud New Hospital Lift Station Construction Jan 2026

DOCX5 pagessow

J06+WH-347+Payrolls+Exp+31Jan2028.pdf

PDF

J03 Tech Specs Rosebud Lift Station Project

PDF133 pagesspecifications

Q&A for Rosebud Lift Station Construction Solicitation 75H70126R00018

PDF3 pagesq-and-a

J03+Wage+Det+SD20260018+2Jan2026.pdf

PDF

J05+IHS+IEE+Representation+Form.pdf

PDF

J02a+RB+Geotech+Report+from+300+feet+away.pdf

PDF

IHS Buy Indian Act Indian Economic Enterprise Representation Form 75H70126R00018

PDF1 pagerepresentation-form

RFP 75H70126R00018 Rosebud Lift Station Construction

PDF58 pagesrfp

J01+Plans+RLSC.pdf

PDF

Final Release of Claims Document

DOCX1 pagerelease-of-claims

South Dakota Lift Station Design Plans GP24RB401H02

PDF12 pagesspecifications

J04+Self+Performed+Calculation+Sheet.docx

DOCX

J02b+Consolidated+QA+RLSC+12Mar2026.pdf

PDF

Wage Determination SD20260018 for Todd County, SD

PDF5 pageswage-determination

J02+Tech+Specs+RLSC.pdf

PDF

B01-A03+Conformed+RFP+RLSC+75H70126R00018.pdf

PDF

Consolidated Q&A for Rosebud Lift Station Construction RFP 75H70126R00018

PDF6 pagesq-and-a

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

8 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Amendment 6

Contract was updated

Amendment 7

Contract was updated

Response Deadline

Deadline has passed

Amendment 8

Contract was updated

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Health And Human Services → Division Of Engineering Svcs - Seattle
Contacts2 people available
OfficeSEATTLE, WA, 98121, USA
Organization / Agency
Department Of Health And Human Services → Division Of Engineering Svcs - Seattle
View Agency Profile
Office AddressSEATTLE, WA, 98121, USA

Full Description

Show more

Amendment 8: Cancellation Notice


The Government hereby cancels Solicitation No. 75H70126R00018 for Rosebud Lift Station Construction in its entirety.


After evaluation of proposals received, the Government has determined that cancellation of the solicitation is in the best interest of the Government.


The Government intends to review the requirement and may reissue a revised solicitation at a later date.



Amendment 7:


1. The purpose of this solicitation amendment A07 is to:
- Update attachment J02b Consolidated QA RLSC.


2. Attachment J02b Consolidated QA RLSC is updated to the 12Mar2026 version, adding the questions and answers from 25 to 34.


3. Remember to acknowledge all amendments. Block 11 of the SF-30 provides instructions for acknowledging amendments; it is acceptable to acknowledge on block 19 of the SF-1442.


4. All other terms and conditions remain unchanged.
 



Amendment 6:


1. The purpose of this solicitation amendment A06 is to:
a. Extend the offers due date.
b. Update specifications.


2. The offers due date is extended to 03/23/2026.


3. The following questions and answers affect the specifications:
a. I was looking to bid this job and just had a question on sheet 10 it says to bring a conduit
to the onsite generator. Is this pipe just stubbed out as a spare or is there a generator
onsite?
- Answer : The documents indicate a conduit connection to a generator; however,
the existing power configuration for the lift station is not currently confirmed. At
the start of construction, the contractor shall verify the existing power source
serving the lift station and provide the necessary means and methods to
establish electrical service to the new lift station.


b. D.5 - Calls out an alternating relay J.9. Called out alternation on SCADA system - do
they want a physical alternator or a PLC alternator - can't have both.
- Answer : PLC Alternator


c. K. Level Transmitter - calls out a level transmitter to the PLC, but I. says level control
based on floats. Do they want level control based on floats or a transducer? Usually, we
do a level transducer as the main control with floats as backup. They would be wired to
the same PLC
- Answer : Transducer Main and Float back-up.


d. J. - SCADA System. The SCADA system called out is a Sensaphone SCADA 3000. I
would change this to an Allen Bradley CompactLogix 5069 series PLC. More systems
use this platform and brand of PLC. This will give them more options for support. Also
would use Cloud 9 SCADA as the application for the SCADA system. This will allow
Dakota Pump remote access for help troubleshooting the system remotely as well as
give the operators access and alarm call-outs. This cloud 9 system would be supplied
with a Cellular modem, which would include SCADA access, alarm call-outs and cellular
data for the system. If we go this route, we could get rid of section L. Telephone
communication.
- Answer : The Allen‑Bradley CompactLogix 5069 Series PLC would be a suitable
modification for this application, offering a more widely supported control platform that
improves long-term serviceability, integration capability, and technical support options for
the Service Unit.


e. K. Would like to use a Dwyer 4-20 PBLT2 transducer. 0-15 PSI with 60' of cable.
- Answer : This is fine.


f. D. & F. - Pilot devices. Would use Siemens 22MM devices. Oil-tight NEMA 4 rated on the
inside of the panel on the dead front door. All pilot devices and lights would be 22MM
and Siemens brand.
- Answer : This is fine.


g. My controls and Scada team is going through the specifications and they are not finding
page 13 in the plans that is referenced in the picture attached. Was this page not
published? It appears there are only 12 pages of plans.
- Answer : Actually should refer to sheet 10.


4. Remember to acknowledge all amendments. Block 11 of the SF-30 provides instructions for
acknowledging amendments; it is acceptable to acknowledge on block 19 of the SF-1442.


5. All other terms and conditions remain unchanged.



Amendment 5:


1. The purpose of this solicitation amendment A05 is to:
- Extend the offers due date.
- Change the pump description.


2. The offers due date is extended by one week to 03/16/2026.


3. The solicitation identified the Vaughan V3V pump as a submersible pump. A bidder notified the Government that this designation is incorrect. The Vaughan V3V is a vertical pump, not a submersible model. The solicitation is hereby amended as follows:
- DELETE: Reference to the “Vaughan V3V” pump as a submersible pump.
- REPLACE WITH: “Vaughan S3P” as the brand name or equal submersible pump model for this requirement.
This correction aligns the specification with the Government’s intended pump type for the project. Offerors shall base their proposals on the corrected pump specification provided in this amendment.


4. Remember to acknowledge all amendments. Block 11 of the SF-30 provides instructions for acknowledging amendments; it is acceptable to acknowledge on block 19 of the SF-1442.


5. All other terms and conditions remain unchanged.
 


Amendment 4:


1. The purpose of this solicitation amendment A04 is to:
a. Extend the offers due date.
b. Update attachment “J02b Consolidated QA RLSC” with the answers to questions
received after Amendment 3 up to the deadline of 02/23/2026.
c. Add the SF-30 for Amendment 1 which was not included at that time.
d. Remove the licensing requirement from Volume 1 -Technical Proposal, Factor 1 -
Technical.


2. The offers due date is extended by one week to 03/09/2026.


3. Attachment “J02b Consolidated QA RLSC” is updated with the answers to questions received
after Amendment 3 up to the deadline of 02/23/2026. Added Q&A 16 to 24.


4. Added the SF-30 for Amendment 1 which was not included at that time. Added “MB01-A01
Replace Attachment”.


5. The licensing requirement is removed from Volume 1 -Technical Proposal
Factor 1. The following text is removed "License. Demonstrate that is licensed by providing a copy of the Sewer and Water
Contractor/Installer license."


6. Remember to acknowledge all amendments. Block 11 of the SF-30 provides instructions for
acknowledging amendments; it is acceptable to acknowledge on block 19 of the SF-1442.


7. All other terms and conditions remain unchanged.



Amendment 3


1. The purpose of this solicitation amendment A03 is to:
a. Post the conformed version of the RFP changing the following:
- Replace the original “B01 RFP RLSC 75H70126R00018” with “B01-A03 Conformed RFP RLSC 75H70126R00018”. Changes are highlighted.
- Amend block 11 of the SF-1442 changing the POP to 240 days.
- Amend Section C, paragraph C to read 240 days.
- Amend Section C to add paragraph I Notes on the Vaughan Model V3V/V3VR brand name or equal requirement.
- Amend paragraph F.2(a) to read 240 calendar days.


b. Add attachment J02a RB Geotech Report from 300 feet away.


c. Replace attachment “J01 Plans RLSC 30Jan2026” with “J01 Plans RLSC 13Feb2026” fixing the coversheet.
d. Add attachment “J02b Consolidated Q&A RLSC” posting the questions and answers (Q&As) received as of this date.
- Refer to question # 13 for an update on the Base Course Thickness: 12-inches of base course underneath the concrete pad is sufficient.


2. Remember to acknowledge all amendments with your offer.


3. All other terms and conditions remain unchanged.



Amendment 2: Adds the provision 52.228-1 in full text.


Added MB01-A02 Bid Bond RLSC 75H70126R00018 to the attachments.


Remember to acknowledge this and all future amendments with your proposal.



Amendment 1: Replace an attachment.


Attachment J01 Plans RLSC was corrupted and is replaced by attachment J01 Plans RLSC 30Jan2026. All questions or
concerns shall be routed through daniel.cotto@ihs.gov; do not attempt to contact people mentioned in the attachment.


Remember to acknowledge this and all future amendments with your proposal.



Solicitation: Rosebud LiftStation Construction


Location: 1319 Soldier Creek Road,Rosebud, SD 57570
County: Todd
POP: 120 calendar days
Construction Magnitude: Between$500,000 and $1,000,000
Contract Type: firm-fixed-priced
TERO: TERO is applicable. See SectionH.50.


Goal: The existing lift station has been inplace since the early 1990s. Since its cre-ation the hospital anticipates increased ex-pansion in the emergency department,added on Tribal programs (dialysis, detox,Tribal Health Administration Building),added on 19 more quarters units, and is an-ticipating adding an additional 23 quartersunits. The existing pumps are facing re-placement every 1-2 years due to the unan-ticipated growth, but due to the growth weneed to consider increasing the capacity ofthe wet well. In addition to switching fromstandard submersible pumps to chopperpumps to accommodate the random ob-jects that get flushed into the system. InJuly both pumps ended up failing and theyhad to not only replace the pumps but payfor sewage disposal to circumvent overflow.


A separate project is in the works to beginremediating/replacing damaged sewermains due to inflow and infiltration.


This construction solicitation will requirethe full removal and replacement of the liftstation for the Rosebud complex. The exist-ing lift station provides wastewater serviceto the hospital quarters units, and severaltribal program buildings. Once installationis complete the new lift station will take thefull sanitary load for the area currently be-ing serviced by the existing lift station andbe sized to handle expansion in the future.Then the existing lift station consisting of the wet well, dry well, pumps and pipingwill be demolished. The new lift station willconsist of a wet well, a dry well, installationof chopper pumps, and force main connec-tion. This project will also include a newcontrol system to allow the facility to moni-tor flow into the lift station and the status ofthe equipment.

More opportunities from Department Of Health And Human Services → Division Of Engineering Svcs - Seattle

Same awarding agency

NAICS: 237110
Federal
Teresa Thurston Replacement OSS
Solicitation # 75J70126Q00033
The Department of Health and Human Services, Division of Engineering Services in Seattle, is soliciting quotes for the Teresa Thurston Replacement On-Site Septic System (OSS) project located in Lake Tapps, Washington. This firm-fixed-price construction contract is a 100% small business set-aside under NAICS 237110, with an estimated project magnitude between $25,000 and $100,000. The scope of work involves the installation of a replacement septic system, including the settling tank, pump tank, effluent pump and controls, transport line, and drainfield, as well as potential optional items for abandoning existing tanks. The project requires the contractor to be certified by Pierce County as a septic installer. The performance period requires work to commence within 10 calendar days of the notice to proceed, with full completion, including cleanup and approvals, within 30 calendar days. A project superintendent must be on-site at all times to oversee labor and safety compliance. Award will be based on the lowest total firm-fixed price and compliance with all terms and conditions. Payment will be processed electronically via the Department of Treasury Invoice Processing Platform, with final payment issued within 30 calendar days of receiving a proper invoice and a release of claims form. All work must adhere to Davis-Bacon wage determinations for residential construction in Pierce County and comply with Buy American requirements.
Water and Sewer Line and Related Structures Construction

POSTED

11 days ago

DEADLINE

in 5 days
View Details
NAICS: 237110
Federal
J. Jenkins OSS (COW)
Solicitation # 75H70126Q00034
Solicitation 75H70126Q00034 is a firm fixed-price construction contract issued by the Department of Health and Human Services, Indian Health Service Division of Engineering Services, for the installation of a replacement individual on-site septic system in Castle Rock, Washington. The project is a total small business set-aside under NAICS 237110, with an estimated construction magnitude between 25,000 and 100,000 dollars. The scope of work includes the installation of a 1,050-gallon two-compartment concrete septic tank, 4-inch solid sewer pipe, underground cleanouts, a distribution box, and a gravity trench chamber drainfield, as well as the pumping and abandonment of the existing septic tank. The contractor is responsible for obtaining all necessary permits, including the Department of Ecology Notice of Intent, and must adhere to a 45-day period of performance following the notice to proceed. Award will be based on price and compliance with the terms and conditions of the request for quotes, with price serving as the discriminating factor. Eligible offerors must be registered in the System for Award Management and provide a completed SF1442 and price schedule by the September 21, 2026, deadline. Special preference is given to Indian Economic Enterprises under the Buy Indian Act, requiring specific self-certification and supporting documentation. The contract mandates compliance with Davis-Bacon wage determinations, OSHA trench safety regulations, and the use of domestic construction materials. Payment will be processed electronically via the Department of Treasury Invoice Processing Platform, with progress payments authorized and final payment issued within 30 calendar days of a properly executed final invoice and release of claims.
Water and Sewer Line and Related Structures Construction

POSTED

18 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS