Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rosewood – 139th Street, Et Al., Phase II

Closed
20260903053State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 19 days
NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)
Solicitation # CIP 20083
The Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083) is a public works solicitation by the City of Tustin, California, for the construction of park infrastructure. The scope of work includes site excavation, plumbing, electrical, instrumentation, street improvements, and the installation of a 12-foot multi-modal path and a 6-foot walking trail. The project has an engineer's estimate of 11,100,000 dollars and a project schedule of 190 contract days. Bidders must hold a Class A contractor's license and submit their proposals via the OpenGov portal by December 10, 2026, at 2:00pm. A critical requirement for responsiveness is the submission of the bid bond both as an electronic upload and as a hard copy delivered to the City Clerk. The contract will be awarded to the low bidder based on the total sum of correctly calculated unit prices. The successful contractor must provide a project baseline schedule within 15 calendar days of execution and adhere to strict safety and quality standards, including Cal-OSHA requirements for qualified persons working near utilities and 2008 ADA Standards for Accessibility. Payment is structured as monthly progress payments at 95 percent of the work value, with the final 5 percent retained until 60 days after the recordation of the Notice of Completion. Liquidated damages are set at 8,800 dollars per calendar day for delays. Required post-award documentation includes payment, faithful performance, and guaranty bonds, as well as a compensation insurance certificate.
Public Works

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
CITB 2026C045
Solicitation # 2026C045
Invitation to Bid No. 2026C045 is issued by the Municipality of Anchorage for the Old Seward Highway Surface Rehabilitation project, Phase 2, spanning from International Airport Road to Tudor Road. With an estimated construction cost between 3 million and 5 million dollars, the scope of work includes asphalt pavement rehabilitation, sidewalk and curb replacement, storm drain improvements, and the treatment of contaminated soils. The project requires the contractor to provide all labor, equipment, and materials, adhering to the 2024 Municipality of Anchorage Standard Specifications and various state and national traffic and electrical codes. Key deliverables include the installation of inlaid traffic markings, flexible delineators, and the coordination of access for adjacent businesses and school bus routes. The bidding process requires the submission of sealed paper bids to the MOA Purchasing Department by 2 PM local time on November 5, 2026, as electronic submissions are not accepted. Bidders must provide a bid bond, valid state and municipal contractor licenses, and a SAM report. The contract will be awarded to the responsible bidder who submits the lowest responsive bid, with preferences available for local and veteran bidders. Awardees must comply with a Community Workforce Agreement and prevailing wage requirements. Environmental compliance is critical, as work in Campbell Creek requires a Fish Habitat Permit and is subject to inspection by the U.S. Army Corps of Engineers, while soil testing must follow specific EPA and ADEC protocols for lead contamination.
Municipality of Anchorage

POSTED

about 13 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Parking Lot E8 Repairs
Solicitation # CSULBSOQ80
The Parking Lot E8 Repairs project (Project Number PE825PK023) at California State University, Long Beach, involves the complete removal of existing four-inch asphalt pavement and the upper 18 inches of soil, including cement-treated soil. The scope of work requires the installation of new asphalt over non-expansive fill compacted to at least 95 percent relative compaction, as well as the installation of one new EV charging station and the conversion of nine EV-ready stalls to full charging capability. The owner's construction estimate for this public works project is 3,700,000 dollars, with anticipated construction occurring between April 1 and July 30, 2027. Bidders must hold a valid California contractor's license in either the C-12 or B classification and must be prequalified through the PlanetBids portal. A mandatory site walk was scheduled for November 16, 2026, and sealed bid proposals are due by 2:00 p.m. on December 16, 2026. The project is subject to prevailing wage rate laws, requiring all contractors and subcontractors to be registered with the Department of Industrial Relations. Additionally, the project will be enrolled in the CSU Builders Risk Insurance Program and potentially the Owner-Controlled Insurance Program. Award will be based on the lowest responsive and responsible bid, with specific incentives provided for Disabled Veteran Business Enterprise (DVBE) participation. While a minimum of 3 percent DVBE participation is required, incentives ranging from 1 to 3 percent are available for participation levels between 4 percent and 6 percent or more, subject to a 50,000 dollar cap when combined with Small Business Preferences and a total cumulative adjustment limit of 100,000 dollars.
Purchasing Office Department of California State University, Long Beach

POSTED

about 15 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

Los Angeles County Public Works is soliciting bids for Project ID RMD3208002, titled Rosewood 139th Street, et al., Phase II. This civil improvement project involves the resurfacing and reconstruction of roadway pavement, curb ramp upgrades, and appurtenant work across 4.15 miles in the City of Compton and the unincorporated community of Rosewood. The scope of work is divided into phased construction covering roadway and parkway improvements, requiring the contractor to manage utility coordination, obtain City encroachment permits, and maintain site safety and graffiti removal. Bids must be submitted electronically via Bid Express by September 29, 2026, following a mandatory prebid meeting held on September 10, 2026. Qualified contractors must adhere to strict construction schedules, prevailing wage laws, and DIR registration requirements, while complying with local and targeted worker hire policies and CBE participation goals. The selection process includes a review of contractor licensing, surety bonds, and specific county preference programs to ensure compliance with Los Angeles County Board of Supervisors standards.

General Info

LA County Public Works solicitation for roadway and curb upgrades in Compton and Rosewood.

Place of Performance

Garfield Heights, CA, 44105, USA

Set-Aside

NONE

Documents

5

ITB 08002 Rosewood - Instructions to Bidders

PDF, High priority: read this firstitb
High

Los Angeles County Public Works Rosewood-139th Street Phase II Plans

PDF, High priority: read this firstspecifications
High

RMD3208002 - Bid Proposal for Rosewood 139th Street Phase II

PDF, High priority: read this firstifb
High

RMD3208002 Rosewood – 139th Street, Phase II Bid Notice

PDF, High priority: read this firstifb
High

RMD3208002 Rosewood–139th Street Phase II Notice Inviting Bids

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Public Works
Contacts3 people available
OfficeN/A

Full Description

Show more
Bid #RMD3208002: This project involves the resurfacing and reconstruction of roadway pavement, curb ramp upgrades, and other appurtenant work in the City of Compton and the unincorporated community of Rosewood. Key activities include phased construction, with Phase 1 and Phase 2 covering roadway and parkway improvements. The contractor is responsible for obtaining a City encroachment permit, adhering to a strict construction schedule, and complying with local and targeted worker hire policies. The project also requires continuous site safety, graffiti removal, and adherence to specific utility coordination procedures.

More opportunities from California → Los Angeles County Public Works

Same awarding agency

NAICS: 237310
New
SLED
Hacienda Heights - Hacienda Boulevard Phase I
Solicitation # RMD1402001
Solicitation RMD1402001 is a project for the Los Angeles County Public Works agency involving roadway reconstruction and infrastructure improvements on Hacienda Boulevard in the unincorporated community of Hacienda Heights. The scope of work includes resurfacing, the installation of new bulb-outs, curb and gutter improvements, curb ramp installation, and sidewalk and driveway repairs. Additional requirements include tree removals, new median landscaping, signing and striping, continental crosswalks, and traffic loop restoration. The project is estimated to cost between 3.6 million and 5.3 million dollars and must be completed within 140 working days. The contract will be awarded to the responsible bidder with the lowest responsive bid. Bidders must submit proposals electronically via Bid Express and provide a bid bond equivalent to at least 10 percent of the contract price. Key requirements include a 25 percent goal for Certified Business Enterprise participation and adherence to prevailing wage determinations. Technical standards for the work are governed by the 2000 Los Angeles County Public Works Standard Plans, the 2021 Standard Plans for Public Works Construction, the 2024 Greenbook, and the 2025 Caltrans Standard Plans and Specifications. Specific material standards are mandated for signage, including the use of 6061-T6 or 5052-H38 aluminum alloy and hot-dipped galvanized steel for posts. Acceptance of detection systems requires a continuous quality of 98 percent or better over a seven-day period.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS