Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

James W. Fowler Co.View Agency

NAICS

238130 - Framing ContractorsView NAICS

Place of Performance

WA, USA

Set-Aside

SBA

Documents

This scope was carved out of ruby-creek-park-ride-construction.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Ruby Creek Park & Ride Construction

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyJames W. Fowler Co.
ContactsNo contacts available
OfficeN/A
Organization / Agency
James W. Fowler Co.
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs rough carpentry and framing work for prime contractors on Kitsap Transit projects, here at the Ruby Creek Park and Ride in Port Orchard, WA. Frames walls, floors, and structural wood components. Delivers completed rough framing.

Similar Contracts

Same NAICS industry code

NAICS: 238130
New
Federal
Z--PECO - REPLACE SIDING AND FOUR HVAC UNIT
Solicitation # 140P6326Q0034
Solicitation 140P6326Q0034 is a firm-fixed-price request for quotation for construction services at the Park Duration Building within Pecos National Historic Park in Pecos, New Mexico. The project, estimated between 250,000 and 500,000 dollars, is 100 percent set aside for small businesses under NAICS code 238130. The scope of work is divided into three primary contract line items: replacing existing windows with 20 minute fire rated windows and a new storm door, removing and replacing the roof and installing new metal siding over existing T-111 siding, and replacing four Marvair package HVAC units with two new Above Air split system units. Performance must begin within 10 calendar days of the notice to proceed and be completed within a mandatory 90 calendar day period. The government will evaluate quotations based on technical capability, past performance, and price reasonableness, utilizing FAR Part 13 simplified acquisition procedures. Bidders must submit a completed SF 1442, a project approach, an experience questionnaire, and a bid bond equal to 20 percent of the bid amount to avoid rejection. The contract requires strict adherence to Davis-Bacon Act wage determinations, NIOSH and OSHA safety standards, and the Archaeological Resources Project Act of 1979. Additionally, the contractor must provide a written Quality Control plan, maintain a Quality Control Supervisor on site, and ensure all work complies with the Architectural Barriers Act Accessibility Standards and Wildland-Urban Interface wildfire standards. Payment will be processed through the IPP system following the submission of detailed PDF invoices.
Mwr NEKOTA(63000)

POSTED

1 day ago

DEADLINE

in 5 days
View Details

More opportunities from James W. Fowler Co.

Same awarding agency

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins between 54 and 145.5 inches. Additional deliverables include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and various piping systems. Civil works involve the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids are due by September 29, 2026. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of equipment and materials. All negotiations must be finalized 24 hours prior to the bid opening. Technical plans and specifications are available through the James W. Fowler website.
Water and Sewer Line and Related Structures Construction

POSTED

about 11 hours ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS