Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Rebar Supply & Installation

Active

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

James W. Fowler Co.View Agency

NAICS

238120 - Structural Steel and Precast Concrete ContractorsView NAICS

Place of Performance

WA, USA

Set-Aside

SBA

Documents

This scope was carved out of ruby-creek-park-ride-construction.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Ruby Creek Park & Ride Construction

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyJames W. Fowler Co.
ContactsNo contacts available
OfficeN/A
Organization / Agency
James W. Fowler Co.
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs reinforcing steel (rebar) for prime contractors on Kitsap Transit projects, here at the Ruby Creek Park and Ride in Port Orchard, WA. Performs cutting, bending, and placing of steel reinforcement bars. Delivers installed rebar cages and mats.

Similar Contracts

Same NAICS industry code

NAICS: 238120
New
Federal
54--ASSATEAGE ISLAND - INSTALL COMFORT STATIONS
Solicitation # 140P4326R0038
The National Park Service is soliciting proposals for the installation of pre-cast concrete vault-style comfort stations at Assateague Island National Seashore in Berlin, Maryland. The scope of work includes the procurement and installation of two ADA-compliant double-vault units at the South Beach Parking Lot as the base bid, with an additional option for a single-vault unit at Old Ferry Landing. The project requires the contractor to provide all necessary labor, supervision, materials, equipment, and permits. The period of performance is scheduled from October 1, 2026, through April 30, 2027, and all work must include a minimum one-year warranty from the date of final inspection. This is a total small business set-aside project utilizing the Lowest Price Technically Acceptable source selection process. Award decisions will be based on technical capability, including the provision of detailed product specifications and past performance references for three to five similar projects completed within the last ten years, as well as fair and reasonable pricing. Contractors must comply with Davis-Bacon Act wage determinations for Worcester County, Maryland, and adhere to OSHA safety standards. Proposals must be submitted electronically to the contracting officer by September 11, 2026, and must include a Standard Form 24 bid bond. Payment will be processed through the Invoice Processing Platform following a review by the National Park Service Construction Management Representative.
Ner Services Mabo (43000)

POSTED

1 day ago

DEADLINE

in about 23 hours
View Details

More opportunities from James W. Fowler Co.

Same awarding agency

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins between 54 and 145.5 inches. Additional deliverables include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and various piping systems. Civil works involve the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids are due by September 29, 2026. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of equipment and materials. All negotiations must be finalized 24 hours prior to the bid opening. Technical plans and specifications are available through the James W. Fowler website.
Water and Sewer Line and Related Structures Construction

POSTED

about 11 hours ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS