REMOVE AND REPLACE CONCRETE DRAINAGE PAD FOR BUILDING #11 WITH OPTOINS

Active
1240LT26Q0182Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract, issued by the Department of Agriculture's Csa Intermountain 8 Usda-Fs, requires a contractor to provide professional services for concrete removal and installation. The primary project involves demolishing old concrete and pouring a new drainage pad approximately 6ft by 48ft by 6 inches for Building 11, including all necessary site preparation, landscaping, and the use of minimum 1/2 inch rebar. The contractor is responsible for all labor, materials, equipment, and transportation, ensuring the drainage runs toward the north elevation with grooves approved by the onsite COR. The solicitation includes two optional projects. Option 1 involves the demolition and installation of a new concrete pad approximately 25ft by 30ft on the south side of Building 28, including drainpipe reinstallation. Option 2 requires the removal of old concrete and the installation of a new ramp approximately 28ft by 90ft on the east side of Building 12, which includes installing new railings and cutting heavy grooves. Bidders must provide a technical proposal and separate cost estimates for the base project and both options. This is a total small business set-aside opportunity with a response deadline of September 23, 2026.

General Info

USDA contract for concrete removal and installation at three buildings with optional projects.

Agency

Department Of Agriculture → Csa Intermountain 8 Usda-FsView Agency

NAICS

238120 - Structural Steel and Precast Concrete ContractorsView NAICS

Place of Performance

ND, USA

Set-Aside

SBA

Documents

(5)

C04+SOI+1240LT26Q0182.xlsx

XLSX

C04+SOW+1240LT26Q0182.docx

DOCX

1240LT26Q0182.pdf

PDF

C04+1240LT26Q0182.docx

DOCX

C04+WD+Morton+County+ND+1240LT26Q0182.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseCombined Synopsis
Posted

Combined Synopsis

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Intermountain 8 Usda-Fs
Contacts1 person available
OfficeOgden, UT, 844012310, USA
Organization / Agency
Department Of Agriculture → Csa Intermountain 8 Usda-Fs
View Agency Profile
Office AddressOgden, UT, 844012310, USA
Contacts
Derrick A Dodson

Full Description

Show more

The Contractor shall provide all professional services necessary for the accomplishment of each project and such required services shall be in accordance with requirements as described herein.



    1. The Contractor shall provide services for the following tasks marked by an “X”:

[X]   Provide a quote and a technical proposal to complete the project as per project requirements. Provide separate estimates for Base and both options.


[X]   The contractor shall furnish all the skilled labor, materials, equipment, tools, transportation, and supervision necessary to remove/demo old concrete and pour new concrete drainage that is approximately 6ft x 48ft x 6” inches in depth for building #11. The contractor shall furnish, prepare, and install all required landscaping/site work required to prepare the area for concrete.  Minimum ½” rebar must be used as to proper code for slabs and any materials necessary.  The Contractor shall be responsible for transporting any fill to the jobsite and all compacting and prep work. The Contactor shall pour the drainage to run off towards the north elevation. Contractor to cut in grooves that are to the satisfaction of the COR onsite.



 [X] Option 1: Bldg#28 south side: Demo old Concrete pad approximately 25ft. wide by 30ft. in length by 6 inches in depth with all associated landscaping, fill, re-bar and materials and install new concrete pad.  Cut groves into the concrete on slopes like currently exists. Reinstall drainpipe and work around pea rock roof




 [X] Option 2: Bldg#12 east side: The contractor shall furnish all the skilled labor, materials, equipment, tools, transportation, and supervision necessary to remove/demo old concrete sections and pour new concrete ramp that is approximately 28ft. x 90ft x 6” inches in depth. The contractor shall furnish, prepare, and install all required landscaping/site work required to prepare the area for concrete.  Minimum ½” rebar must be used as to proper code for slabs and any materials necessary.  The Contractor shall be responsible for transporting any fill to the jobsite and all compacting and prep work. The Contactor shall pour the upper ramp elevation area and cut in heavy grooves as presently exist that are to the satisfaction of the COR onsite.  Existing railings shall be removed and a new one installed and cemented in with the concrete.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Agriculture → Csa Intermountain 8 Usda-Fs

Same awarding agency

NAICS: 237110
New
Federal
GAOA Palisades Lagoon Liner & Sprinkler System Replacement, Coronado National Forest
Solicitation # 1240LT26Q0094
Solicitation 1240LT26Q0094 is a combined synopsis and request for quotation for the Palisades Lagoon Liner and Effluent Sprinkler System Replacement project at the Palisades Administrative Complex within the Coronado National Forest, Pima County, Arizona. This total small business set-aside under NAICS 237110 has an estimated value between $500,000 and $1,000,000. The project involves replacing the existing double lagoon liner system with a new primary geomembrane liner and non-woven geotextiles, installing a new effluent sprinkler system including pumps and plumbing, and reconstructing approximately 660 linear feet of access road. To ensure uninterrupted wastewater services during construction, the contractor must provide and manage a temporary above-ground wastewater conveyance system. The period of performance is scheduled from October 1, 2026, to December 1, 2026. Award will be based on best value, evaluating technical approach, project management, performance scheduling, specialized experience, and past performance. A bid guarantee of 20% is required for quotes exceeding $150,000. The contract is subject to the Davis-Bacon Act for wage determinations and requires a written quality control plan approved by the Contracting Officer's Representative before work begins. All invoices must be submitted electronically via the Department of Treasury's Invoice Processing Platform.
Water and Sewer Line and Related Structures Construction

POSTED

about 10 hours ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS