This Solicitation opportunity from Pennsylvania was posted on January 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Route 54 Sanitary Sewer Extension Project, Contract No. WB-1, is a construction solicitation issued by the West Branch Regional Authority for work in Clinton Township, Lycoming County, Pennsylvania. The project scope involves the installation of approximately 1,520 linear feet of gravity sanitary sewer, 11 manholes, 13 lateral connections, one duplex sewage pumping station, and 404 linear feet of force main. Additional requirements include one stream crossing, surface restoration, and the implementation of comprehensive erosion and sediment control measures. All work must comply with PennDOT Publication 408 and other applicable state and federal standards, including the National Electrical Code and OSHA regulations.
Sealed bids are due by 1:00 PM local time on February 16, 2026, and must be submitted online via PennBid. Bidders are required to provide a bid security of ten percent of the total bid amount in the form of a certified check, bank check, or bid bond. The successful contractor must furnish performance and payment bonds each equal to one hundred percent of the contract price and provide evidence of required insurance. Labor must be paid according to the Pennsylvania Department of Labor and Industry prevailing wage rates, and all steel products must be produced in the United States per the Pennsylvania Steel Products Procurement Act of 1978. Bids must remain open for sixty days following the opening date.
HighAI Summary for 00100 Invitation to Bid - Permit Index: An index of required permits for a construction project, including electrical, highway occupancy, water quality management, and road occupancy permits involving PennDOT, DEP, and local townships.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 00200 Instructions to Bidders - Cleaning and Maintenance: Technical specifications section 00200 detailing the requirements for progress and final cleaning during and after construction. It outlines standards for site cleanliness, debris removal, and the responsibility of the contractor to maintain a neat work environment and provide final cleaning prior to project acceptance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 00300 Bid Form - Field Engineering Services: Technical specifications for field engineering and survey services, including requirements for licensed professional engineers/surveyors in Pennsylvania, control point management, project survey requirements, and necessary submittals for certification of construction conformance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 00320 NonColl Aff Bidd - General Requirements and Standards: This document is a technical specifications section (Part 1 - General and Part 2 - Products) detailing general requirements for a construction project. It defines key contractual terms (e.g., 'Approved', 'Furnish', 'Install'), establishes the applicability of industry standards, and provides a comprehensive list of abbreviations and acronyms for organizations such as GSA, ACI, and ASTM. It serves as a foundational reference for quality assurance and compliance with industry standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 00600 Bonding Forms - Photography and Video Requirements: Technical specifications section 00600 detailing the requirements for preconstruction and construction record photography and video. It outlines the necessity of employing a competent photographer, the required views and quality standards, and the delivery of digital files and hardcopy prints to the Engineer.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 00620 Workers' Conduct and Site Safety Specifications: Technical specifications section 00620 detailing requirements for workers' personal conduct on the job site, schedule change review processes, Material Safety Data Sheets (MSDS) maintenance, and safety protocols for hot work (welding/burning).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 00650 General Requirements for Products and Workmanship: This document outlines the general requirements for products, workmanship, and material handling for a construction project. It defines standards for manufacturer's instructions, storage, protection, and the process for requesting substitutions or 'or equal' items. It also specifies the requirements for subcontractor and material source approvals.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for 00660 Form Change Order No 1 - Closeout Procedures: This document outlines the administrative procedures for project closeout, including requirements for substantial completion, final inspection, contractor closeout submittals, and the final adjustment of accounts. It specifies the process for obtaining the Certificate of Substantial Completion and the requirements for the final application for payment.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 00660 Paving and Surfacing Specifications: Technical specifications for paving and surfacing work, including bituminous and cement concrete pavements. The document outlines scope, quality assurance standards based on PennDOT Publication 408, material requirements for aggregates and concrete, and execution guidelines for grade adjustment and paving installation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 00670 Continuation Sheet - Cleaning Specifications: Technical specifications document detailing the requirements for progress and final cleaning during and after construction. It outlines standards for site maintenance, the use of compatible cleaning materials, and the contractor's responsibility for removing debris and waste to ensure the project is delivered in a clean condition.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 00670 Site Improvements - Chain-Link Fence and Gates Specifications: Technical specifications for the furnishing and installation of site improvements, specifically focusing on 8-foot chain-link fencing and gates. The document details material requirements (aluminum coated Class II chain-link, galvanized pipe), dimensions, tensile strength, and execution instructions for post installation and barbed wire outriggers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 00700 General Conditions - Topsoil, Seeding, and Mulching: Technical specifications for the provision and installation of topsoil, seeding, and mulching. The document outlines quality assurance, submittal requirements, and execution procedures for site stabilization, including erosion control matting and maintenance of seeded areas, referencing the approved Erosion and Sediment Control Plan.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 00700 General Conditions - Warranties and Bonds: This technical specification section (00700) outlines the administrative and procedural requirements for warranties and bonds. It details the submission process for written warranties, requirements for the final warranty binder, and the contractor's obligations regarding the replacement of failed warranted work and the reinstatement of warranties.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 00950 Clearing and Grubbing Specifications: Technical specifications for Clearing and Grubbing work, including scope of work, protection of existing facilities, regulatory requirements for disposal, submittal requirements for tree wound paint, and detailed execution instructions for clearing, pruning, grubbing, and material disposal.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 00950 Concrete Formwork Specifications: Technical specifications for the furnishing and installation of concrete formwork. The document details quality assurance standards (ACI 301, ACI 347), material requirements for sheathing and ties, and execution guidelines for construction and removal of forms.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 01050 Field Engineering - Conduit and Fittings Specifications: Technical specifications for the procurement and installation of electrical conduit and fittings. The document details materials (Rigid Metal, IMC, EMT, Flexible, and Non-metallic PVC), reference standards (NFPA-70, UL, ANSI/NEMA), and detailed execution requirements for installation, including support spacing, routing, and fire-rated wall penetrations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 01090 Reference Standards - Electrical Wiring: Technical specifications for electrical building wire and cable, including material requirements (copper conductivity, THWN/XHHW insulation), installation methods, color-coding schemes, and termination standards. It references NEMA, EPCEA, and NFPA 70 (NEC) standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 01200 Proj Mtgs - Outlet, Pull and Junction Boxes Specifications: Technical specifications for the selection and installation of electrical outlet, pull, and junction boxes. The document details material requirements (galvanized steel, aluminum, stainless steel), NEMA ratings (12, 4, 3R), and installation standards including coordination of box locations, mounting requirements, and spacing constraints.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 01380 Construct Photos - Branch Circuit Panelboards Specifications: Technical specifications for the procurement and installation of branch circuit panelboards. The document outlines requirements for UL 67 and NFPA 70 compliance, acceptable manufacturers (Square D, Eaton, GE), circuit breaker ratings, and installation standards including mounting heights and labeling.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 01500 Temp Fac and Cntrols - Power System Grounding: Technical specifications for power system grounding, detailing work requirements, reference standards (NFPA 70/NEC), testing protocols for ground grid resistance, product requirements for grounding rods and connectors, and execution instructions for grounding equipment and raceways.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 01560 Public Safety - Underground Electrical Installations: Technical specifications for the construction and installation of underground raceway systems, including conduit, service conductors, and handholes. The document outlines regulatory requirements (NFPA 70, ACI 318), reference standards (UL, NEMA, ASTM), material requirements, and execution procedures for trenching and duct line installation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 01570 Traffic Reg. - Exterior LED Luminaires Specifications: Technical specifications for exterior solid-state LED luminaires, including requirements for luminaire supports, photoelectric relays, and materials. The document details product standards (UL, NFPA 70), performance criteria (CRI 70, CCT 3500), installation requirements, and a two-year warranty period.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 01600 Materials and Equipment: Technical specifications document section 01600 regarding Materials and Equipment. It outlines the requirements for the procurement, delivery, storage, and handling of materials and equipment for a construction project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 01710 Cleaning - Electrical Service Plan and Pump Station Details: Technical electrical service plan and equipment schedule for a pump station. Includes utility riser pole details, a pump equipment service schedule (Grinder Pump 1), and keyed notes regarding underground electrical service, concrete pads, and coordination with pipe work order #473186.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Contract No. WB-1: Route 54 Sanitary Sewer Extension Project ITB: Invitation to Bid (ITB) issued by the West Branch Regional Authority for the Route 54 Sanitary Sewer Extension Project (Contract No. WB-1) in Clinton Township, Lycoming County, PA. The project involves installing 1,520 linear feet of gravity sanitary sewer, 11 manholes, 13 lateral connections, a duplex pumping station, and 404 linear feet of force main. Bids are due by 1:00 PM on February 16, 2026, via PennBid. Requirements include a 10% bid security, compliance with the Pennsylvania Steel Products Procurement Act, and prevailing wage rates.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Division 16 - Electrical System Specifications (RT 54 Pump Station): Technical specifications for the electrical system installation at the RT 54 pump station. The scope includes underground 120/240V service laterals, feeders, panelboards, and power/lighting equipment. It defines compliance standards (NEC, NFPA, OSHA), submittal requirements for shop drawings and source of supply schedules, and coordination between drawings and specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Division 2 - Site Work Specifications: Technical specifications for Division 2 (Site Work) regarding a sanitary sewer extension project. The document outlines the scope of work, including clearing, grubbing, earthwork, electric service installation, and erosion control. It specifies compliance with PennDOT Publication 408, outlines contractor responsibilities for utility interferences, property restoration, and the critical requirement to maintain and bypass existing sewage flows without interruption.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Division 2: Site Work Specifications: Technical specifications for Division 2 (Site Work) for a sanitary sewer extension project. The document outlines the scope of work, including clearing, grubbing, earthwork, electric service installation, and sewage pump station construction. It specifies compliance with PennDOT Publication 408, environmental regulations for erosion and sediment control, and requirements for maintaining existing sewage flow during construction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Earthwork Specifications - Route 54 Sanitary Sewer Extension Project: Technical specifications for earthwork for the Route 54 Sanitary Sewer Extension Project. The document outlines the scope of work, quality assurance requirements referencing PennDOT Publication 408, subsurface condition responsibilities, and project considerations regarding excavation, utility verification, and site maintenance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Erosion and Sediment Control Specifications: Technical specifications for erosion and sediment control, detailing the scope of work, materials, and execution requirements. The document references compliance with PADEP and PennDOT standards and emphasizes adherence to the approved Erosion and Sediment Control Plan to avoid government-issued stop work orders.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HDPE Piping Systems Specifications: Technical specifications for the procurement and installation of High Density Polyethylene (HDPE) piping systems. The document details the scope of work, reference standards (AWWA, ASTM, PPI, NSF), quality assurance requirements, submittal processes, a 10-year manufacturer warranty, and specific material standards for PE3408 materials.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Measurement and Payment Specifications: This document outlines the general requirements for the measurement and payment of work performed under a unit price payment method. It defines measurement devices, methods for calculating weight, volume, area, and linear dimensions, and establishes rules for defect assessment and non-payment for rejected products. Additionally, it provides specific payment terms for Mobilization and General Conditions, Erosion and Sediment Control, and Maintenance and Protection of Traffic.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Route 54 Sanitary Sewer Extension - Pipe Jacking/Boring Specifications: Technical specifications for Pipe Jacking and Pipe Boring for the Route 54 Sanitary Sewer Extension Project. The document details the scope of work, safety considerations, quality assurance, submittal requirements, steel casing pipe materials (ASTM A 252), and detailed installation methods, including compliance with PennDOT regulations and boring pit requirements.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Route 54 Sanitary Sewer Extension Project (Contract No. WB-1) - Instructions to Bidders: This document outlines the scope of work for the Route 54 Sanitary Sewer Extension Project (Contract No. WB-1) in Clinton Township, Lycoming County, Pennsylvania. The project includes the installation of approximately 1,520 linear feet of gravity sanitary sewer, 11 manholes, 13 lateral connections, a duplex sewage pumping station, and 404 linear feet of force main. It details the contractor's responsibilities regarding labor, materials, site work, excavation, and coordination with the Owner's operations.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Route 54 Sanitary Sewer Extension Project - Wage Determination: This document outlines the duties of the contractor under the Pennsylvania Prevailing Wage Act for the Route 54 Sanitary Sewer Extension Project (Serial Number 26-00467) in Lycoming County. It includes legal requirements for wage payments, record-keeping, and posting notices, as well as a specific project rate table from the Bureau of Labor Law Compliance with a determination date of 1/20/2026.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Route 54 Sanitary Sewer Extension Project - Wage Determination (26-00467): This document outlines the duties of the contractor under the Pennsylvania Prevailing Wage Act and provides the specific prevailing wage rates for the Route 54 Sanitary Sewer Extension Project in Lycoming County. It includes project details (Serial Number 26-00467), the determination date of 1/20/2026, and a schedule of hourly rates and fringe benefits for various labor classifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RT 54 Sanitary Sewer Extension Project (Contract No. WB-1): Technical design and specification document for the RT 54 Sanitary Sewer Extension Project in Clinton Township, Lycoming County, PA. Prepared by Levine Engineering, LLC, the document includes a sheet index, a parcel owner/tax ID table, and detailed vegetative stabilization and erosion control specifications. Revised date: January 15, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 00250 - Experience Equipment and Financial Statement (Record Documents): This document outlines the general requirements for the maintenance and submission of project record documents. It specifies the types of records to be maintained on-site (drawings, contract documents, change orders, etc.), storage requirements, marking procedures for 'PROJECT RECORD' labels, and the final submittal process at contract close-out.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 00300 - Warranties and Bonds: This document specifies the general administrative and procedural requirements for warranties and bonds. It outlines submittal processes, the organization of warranty binders, requirements for correcting failed warranted work, and definitions for Standard Product and Special Warranties.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 00350 - Clearing and Grubbing Specifications: Technical specifications for clearing and grubbing activities, including scope of work, protection of existing facilities, regulatory compliance for disposal, submittal requirements for tree wound paint, and detailed execution instructions for clearing, pruning, grubbing, and material disposal.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 00350 - Meeting Requirements: This document outlines the requirements for scheduling and administering preconstruction, progress, and special meetings. It defines the responsibilities of the Engineer in managing agendas and minutes, specifies required attendees, and provides detailed suggested agendas for project coordination, scheduling, and administrative procedures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 00500 - Demolition Specifications: Technical specifications for demolition work, including scope of work, utility coordination, property restoration, safety requirements, and waste disposal guidelines in accordance with Pennsylvania Department of Environmental Protection (PADEP) regulations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 00500 - Submittals Agreement: This document outlines the general requirements for the submission of shop drawings, product data, and samples. It details contractor responsibilities for verification, submission formats (PDF), engineer review duties, and the distribution process for approved submittals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 00610 - Temporary Services and Facilities: This document outlines the technical specifications for temporary services and facilities required during construction. It covers the installation and maintenance of temporary utilities (water, power, telephone), construction support facilities (field offices, roads, sanitary facilities), and security/protection measures (fencing, fire protection). It includes detailed material and equipment requirements and mandates compliance with OSHA and other regulatory standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 00630 - Public Verification Form / Horizontal Directional Drilling Specifications: Technical specifications for the installation of sanitary sewer and water mains using Horizontal Directional Drilling (HDD). The document outlines the scope of work, safety considerations, quality assurance requirements (including a 3-year experience minimum for contractors), detailed submittal requirements for installation plans, and material handling for HDPE pipe.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 00630 Public Verification Form - Traffic Control: Technical specifications for construction parking control, flagmen, haul routes, and traffic signs/signals. The document outlines requirements for compliance with PennDOT publications and coordination with local jurisdictions and school bus operations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 00670 - Manholes Specifications: Technical specifications for the construction and installation of manholes, including precast reinforced concrete sections, grade adjustment rings, and sealing compounds. The document details material standards (ASTM), approved manufacturers, and coating requirements for the Bald Eagle Sewer project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 00670 Payment Application - General Requirements: This document outlines the general requirements for maintaining and submitting project record documents. It specifies the types of records to be kept on-site (drawings, contract documents, change orders, etc.), storage requirements, marking procedures for as-built information, and the final submittal process at contract close-out.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 00800 - Supplemental Conditions: Planting and Seeding: Technical specifications for the restoration of fences, guide rails, plantings, and seeding. The document outlines requirements for materials, seed mixtures, installation methods, and maintenance standards, referencing PennDOT publications and erosion control plans.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Section 01000 - Summary of Work (Demolition): This document provides the technical specifications and scope of work for demolition activities. It outlines requirements for the removal of structures, utility coordination, property restoration, safety compliance, and waste disposal in accordance with Pennsylvania Department of Environmental Protection (PADEP) regulations. It includes detailed instructions on backfilling, salvaged materials, and site examination procedures.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseAwarded
Posted
Solicitation
Notice updated
Solicitation number changed from West Branch Regional Authority, Lycoming County to 218912. The notice description changed.
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Ref. #: West Branch Regional Authority, Lycoming County Sealed bids for the Route 54 Sanitary Sewer Extension Project, Contract No. WB-1, (hereinafter “Project”), will be received online at http://pennbid.net/ on behalf of the West Branch Regional Authority (hereinafter “Owner”) until 1:00 PM local prevailing time on Monday, February 16, 2026 at which time such Bids will be opened and tabulated. The Project consists of the construction of approximately 1520 linear feet of gravity sanitary sewer, 11 manholes, 13 lateral connections, one duplex sewage pumping station, 404 linear feet of force main, one stream crossing all located within easements obtained by the Owner over private property and Snaurytown Road right-of-way including all required surface restoration and appurtenances. The Project is in Clinton Township, Lycoming County, Pennsylvania. Obtaining Project information including the Bid Documents, will only be found at http://pennbid.net/. Bid Documents may be downloaded from this website. Prospective Bidders are urged to register with the PennBid as a plan holder since PennBid will be updated periodically with addenda, lists of plan holders, reports and other information relevant to the bidding of this Project. Neither the Owner nor the Engineer will be responsible for Bid Documents, including addenda, if any, obtained from sources other than PennBid. Work performed on this Contract will be subject to the prevailing minimum project wage rates as established by the Pennsylvania Department of Labor and Industry which are described within this Document. Each bid must be accompanied by a Certified or Bank Check or Bid Bond naming as payee or obligee, as applicable, Owner, in the amount of ten percent (10%) of the total amount of the bid as security for proper execution of the Agreement and submitting other documents as required by the Bidding Document. The Contractor is subject to the provisions of the Pennsylvania Steel Products Procurement Act of 1978, P.L. 6, as amended. The Act and amendments require that the Contractor use or furnish only steel products (as defined in the Act and amendments) which have been produced in the United States. The Successful Bidder will be required to execute the Agreement and to furnish Performance and Payment bonds, each of said bonds to be in the amount of one hundred percent (100%) of the Contract Price, all in the respective forms provided in the Bidding Documents. The Contractor also will be required to furnish evidence of insurance coverage as required by the Bidding Documents. All bonds shall be executed by sureties named in the current list, "Companies Holding Certificates of Authority as Acceptable Sureties in Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (as amended) by the Audit Staff, Bureau of Government Financial Operations, U.S. Treasury Department and shall be acceptable to the Owner.
No bids may be withdrawn, except when the Bidder(s) comply with the withdrawal requirements of Act No. 4 of the General Assembly of Pennsylvania, Senate Bill 793, Printers No. 1655, as amended. The Owner reserves the right to reject any or all bids or parts thereof or items therein, to waive any defects or irregularities in the Bids, and to accept any Bid which, in its judgement, is for its best interest. Bids shall remain open for a period of sixty (60) days from the date of Bid opening. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
More opportunities from Pennsylvania → Lycoming County