Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on September 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Route 80 Control Valve Improvements – Phase 2

Closed
39085State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well and valve vault with associated appurtenances, as well as the demolition of existing pumps and piping. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days following the issuance of a Notice to Proceed. The contract is administered using EJCDC standard forms and will be awarded to the responsible bidder submitting the lowest responsive bid. Key requirements for bidders include the submission of bid security, evidence of authority to sign, and specific M/WBE compliance documentation, including a Good Faith Efforts Form and Table A. Participation goals are set at 10.9 percent for MBE and 10.4 percent for WBE per EPA guidelines, with a combined state goal of 10 percent. The contractor must provide performance and payment bonds, maintain insurance from providers with an A.M. Best rating of A-VII or better, and adhere to OSHA fall protection and various technical standards, including AWS D1.2 for welding and NEMA MG1 for motors. Payment will be processed in equal monthly amounts via EJCDC C-620 applications, with a 200,000 dollar contingency allowance available for authorized additional work.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in about 22 hours
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project in Virginia under solicitation ITB-2026141. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with adherence to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. Requirements include a 5 percent bid guarantee, performance and payment bonds equal to 100 percent of the contract amount, and compliance with Davis-Bacon wage determinations and OSHA safety standards. Bidders must provide a minimum of three similar project references and confirm they are not on any government debarment lists.
WG Construction Co., Inc.

POSTED

about 3 hours ago

DEADLINE

in about 22 hours

AI Contract Overview

Show more

The Route 80 Control Valve Improvements – Phase 2 is a fixed-price infrastructure project for the South Central Connecticut Regional Water Authority located in New Haven, Connecticut. The scope of work involves the construction of a below-grade valve vault and associated appurtenances, including the installation of ductile iron, copper, and plastic piping, valves, meters, and plumbing pumps. Additional site improvements include a new access driveway, drainage and stormwater management systems, fencing, site lighting, and electrical work featuring Programmable Logic Controllers and cellular telemetry systems. The project requires comprehensive site clearing and the implementation of dewatering systems designed by a Connecticut-licensed Civil Engineer. The contract will be awarded to the low, responsive, and responsible bidder, with bids due by October 28, 2026. Performance and payment bonds are required, along with bid security equal to at least 5 percent of the bid amount. The project must reach substantial completion within 602 calendar days and final completion within 665 calendar days. Strict compliance is required for Connecticut Prevailing Wage laws, the Americans with Disabilities Act, and Build America, Buy America (BABA) domestic production requirements for iron, steel, and construction materials. Contractors must maintain a Workers Compensation Experience Modification Rating of 1.0 or less and adhere to rigorous material storage and inspection standards, including ASTM E329 qualifications for testing laboratories.

General Info

Fixed-price valve vault construction in New Haven, CT, due October 28, 2026.

Documents

2
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
Contacts1 person available
OfficeCT, USA
Organization / AgencyConnecticut → DAS Procurement
Office AddressCT, USA
Contacts
Brent DomkowskiPrimary Contact

Full Description

Show more
For more information, please visit our website: www.rwater.com & sign up on our Procureware portal - https://rwa.procureware.com/home The project includes construction of a below grade valve vault and associated appurtenances, piping, a new access driveway, new drainage and stormwater management systems, new fencing and site lighting; and new electrical and other communications work to support the new valve vault equipment. Additional information can be found on our ProcureWare bid portal - https://rwa.procureware.com/home

More opportunities from Connecticut → DAS Procurement

Same awarding agency

NAICS: 562910
New
SLED
Hazardous Building Materials Abatement, Hazard Cleanup, and Building Demolition
Solicitation # HBM-001
The Town of Redding is soliciting proposals for hazardous building materials abatement, hazard cleanup, and demolition at the former Gilbert & Bennett Wire Mill located at 20 and 30 North Main Street in Georgetown, CT. Funded by a U.S. Environmental Protection Agency Brownfields Cleanup Grant, the project scope includes the removal of asbestos-containing materials, lead-based paint, PCB-containing materials, biohazard materials, and petroleum-impacted soil, as well as the demolition of interior elements and the overall structure. Prospective bidders must attend a mandatory site visit on November 13, 2026, and submit their proposals by December 7, 2026. The contract is subject to stringent federal and state regulations, including the Davis-Bacon Act, the Clean Air Act, and the Federal Water Pollution Control Act. Contractors must adhere to OSHA construction standards and specific EPA regulations regarding PCB and asbestos handling, including strict packaging and labeling requirements. Award evaluation is based primarily on the competitiveness of the price proposal and the proposer's past performance and regulatory compliance history. For contracts exceeding $100,000, both 100% performance and payment bonds are required. Final payment is contingent upon the First Selectwoman's acceptance of the work and the submission of all required documentation, such as Waste Shipment Records and air monitoring results.
Remediation Services

POSTED

about 13 hours ago

DEADLINE

in 29 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS