Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Route 80 Control Valve Improvements – Phase 2

Active
39085State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Route 80 Control Valve Improvements Phase 2 project, managed by DAS Procurement for the state of Connecticut, involves the construction of a below grade valve vault and its associated appurtenances and piping. The scope of work extends to the installation of a new access driveway, drainage and stormwater management systems, site lighting, and fencing, as well as the necessary electrical and communications infrastructure to support the valve vault equipment. This solicitation, identified by number 39085, was posted on September 23, 2026, with a response deadline of October 28, 2026. Interested parties can find additional details and submit bids through the ProcureWare portal or the CTSource Bid Board, with Brent Domkowski serving as the primary point of contact for the project.

General Info

Connecticut project 39085 for Route 80 valve vault construction and infrastructure improvements.

Agency

Connecticut → DAS ProcurementView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CT, USA

Set-Aside

NONE

Documents

(2)

Route 80 Control Valve Improvements – Phase 2 Project Manual

PDFrfb

RT 80 Control Valve Improvements - Phase 2 Project Drawings

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
Contacts1 person available
OfficeCT, USA
Organization / Agency
Connecticut → DAS Procurement
View Agency Profile
Office AddressCT, USA
Contacts
Brent DomkowskiPrimary Contact

Full Description

Show more
For more information, please visit our website: www.rwater.com & sign up on our Procureware portal - https://rwa.procureware.com/home The project includes construction of a below grade valve vault and associated appurtenances, piping, a new access driveway, new drainage and stormwater management systems, new fencing and site lighting; and new electrical and other communications work to support the new valve vault equipment. Additional information can be found on our ProcureWare bid portal - https://rwa.procureware.com/home

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements project in Kerman, California. This comprehensive redesign project involves the demolition of existing infrastructure, the draining of multiple lagoons and ponds, and the construction of a new headworks facility featuring a mechanical chain and rack bar screen system. Key technical requirements include the installation of a new influent eccentric manhole, flow meter vault, and updated influent pump systems, along with the replacement of various surface aerators. The scope of work further encompasses the construction of a sludge dewatering pipeline and two soil cement lined dewatering ponds, a new CMU operations and electrical building equipped with HVAC and plumbing, and a reinforced concrete pad for an emergency generator. Additionally, the project requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing and earthwork. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned enterprises across a wide range of construction-related NAICS codes, with a response deadline of October 21, 2026.
GSE Construction Co., Inc.

POSTED

about 4 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins between 54 and 145.5 inches. Additional deliverables include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and various piping systems. Civil works involve the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned, minority, and woman-owned enterprises. Bids are due by September 29, 2026, and all negotiations must be finalized 24 hours prior to the bid opening. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of equipment and materials. Quality control testing is a required component of the subcontract pricing.
James W. Fowler Co.

POSTED

about 4 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies, along with the abandonment of existing mains on Walnut Street, Ebony Street, and 247th Place. W.A. Rasic Construction Company, Inc. is soliciting subcontractor quotations for various trades, including waterworks, hot taps, trucking, soil and material testing, and a range of paving services such as ready-mix concrete, PCC and AC paving, AC grind and cap, and striping. The project also requires traffic control services. Subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. The prime contractor is specifically seeking quotes from DBE, MBE, SBE, and WBE firms and may require payment and performance bonds totaling 100 percent of the subcontractor's bid, with bond premiums reimbursed up to 1.5 percent. All quotations and written verifications of intent to bid must be submitted to Matt Metoyer by the deadline of October 19, 2026, at 1:00 PM. Selected subcontractors will be required to execute the standard subcontract agreement and insurance requirements of W.A. Rasic Construction Company, Inc.
W.A. Rasic Construction Company

POSTED

about 4 hours ago

DEADLINE

in 25 days
View Details

More opportunities from Connecticut → DAS Procurement

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS