Royalton Town Garage Energy Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The project at the Royalton Town Garage in Royalton, Vermont, entails comprehensive energy upgrades including the replacement of all interior lighting with high-efficiency LED fixtures totaling 32 units, installation of a battery energy storage system with a minimum capacity of 13.5 kWh and 87% round-trip efficiency, and the addition of a Level 2 EV charger with an 80-amp output. All work must comply with NFPA 855, NEC 2023, IEEE 1547, UL 1741, and local codes, with lighting meeting DLC Qualified Product List v5.1+ standards, a minimum of 120 lumens per watt, CRI of 80 or higher, and a five-year warranty. The BESS must carry a ten-year warranty and provide critical load support during outages, while the EV charger must use a J1772 connector and adhere to grounding and labeling requirements. The scope includes site verification, permitting, system commissioning, staff training, and debris removal, with all work to be completed by November 15, 2026, and performed between 7:00 a.m. and 5:00 p.m. Monday through Friday. The project is funded by the SOV MERP Implementation Grant administered by Vermont’s Department of Building and General Services, and state funding means Davis Bacon and BABA requirements do not apply. Bids must be submitted electronically as a single PDF by 5:00 p.m. EST on August 5, 2026, to hfalconer@trorc.org and must include a completed bid form with total price in both figures and words, a bid bond of 10% of the proposal cost, proof of Vermont Secretary of State registration, insurance certificates naming the State of Vermont and Town of Royalton as additional insured, a statement of technical understanding, a list of key staff with roles and rates, a detailed schedule, and a Schedule of Values and Statement of Subcontracting. Subcontractor approval is required prior to engagement, and bidders must certify independent proposal development with no coordination with competitors. Evaluation will follow a Lowest Price Technically Acceptable model, where only technically compliant bids are considered, and award goes to the lowest responsible bid. Final payment is contingent on acceptance by the Town and is submitted monthly via EJCDC C-620 forms. The Town reserves the right to reject all bids and issue change
General Info
Agency
NAICS
Place of Performance
VT, USSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description