Russian Gulch Water Systems Upgrades

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Russian Gulch Water Systems Upgrades project involves extensive infrastructure improvements across multiple locations in California, primarily focused on replacing and installing new water lines. Approximately 4,522 feet of trenches, 3 feet deep and 3 feet wide, will be excavated through existing paved roads to accommodate new water lines of varying diameters: 290 feet of 8-inch line, 3,750 feet of 3-inch line (with about 40 feet connected beneath an existing bridge structure), and 482 feet of 1-inch line. Installation of utility vaults is required for operational components, including a 3-foot by 3-foot by 3-foot vault for a wharf hydrant valve tied to the 8-inch line and six 3-foot by 3-foot by 2-foot vaults to house gate valves along the 3-inch line. Directional drilling will be performed across Highway 1, involving two 10-foot by 15-foot by 5-foot deep pits on either side of the highway to install a 10-inch conduit running 290 feet at a 4-foot depth to carry both electrical and water lines. A comprehensive spill plan and Best Management Practices will be implemented for drilling fluids, with strict adherence to DPR and Caltrans requirements, and all drill pits will be backfilled with native soil upon completion. Additionally, the project includes upgrading communications infrastructure for the water treatment plant by installing 2-inch signal conduit in two separate trench systems totaling over 8,000 feet, along with 25 vaults to support the system. At the existing redwood water storage tanks, all inlet and outlet piping will be replaced, new liners will be installed, and new tank ladders will be added for safety and access. At the beach location, a 50-square-foot area will be excavated one foot deep, compacted with six inches of drain rock, and covered with a six-inch concrete pad to support a beach rinse shower and associated sump system. All work will be performed in alignment with environmental and operational standards set forth by California state agencies, with coordination centered around the Department of Parks and Recreation and oversight provided by the statewide CEQA coordinator.

General Info

Replace water lines, install vaults, directional drilling under Highway 1, upgrade treatment plant communications, renovate tanks, and build beach shower pad.

Agency

California Parks and Recreation, Department of

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Russian Gulch SP Road at State Highway 1, CA, 95460

Set-Aside

NONE

Documents

(1)

Notice of Exemption - Russian Gulch Water Systems Upgrades

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Brad MichalkStatewide CEQA Coordinator

Full Description

Show more
For Water Line Replacement: Excavate a total of approx. 4,522 feet of 3-ft deep x 3-ft wide trenches within existing paved roads and install new 8-in. (290 ft.), 3-in. (3,750 ft. – with approx. 40 ft of the new attached to the under structure of the existing bridge) and 1-in. (482 ft.) water lines; For the 8-in. line install, excavate a 3-ft x 4-ft x 3-ft hole to install a utility vault for a new wharf hydrant valve; and For the 3-in. line installation, excavate to install six (6) 3-ft x 3-ft x 2-ft vaults to install six (6) gate valves. Excavate two (2) 10-ft x 15-ft by 5-ft deep pits (1 on each side of Highway 1), to directionally drill an approx. 4-ft deep by 290-ft long to install a 10-in conduit for both electrical and water lines. For the Water Treatment Plant Communications: Excavate a 3-ft x 1-ft x 3,589 ft long trench and install a 2-in. signal conduit in a shared waterline trench and excavate for nine (9) 2-ft x 3-ft x 1.5-ft vaults; and Excavate a 3-ft x 2-ft x 4,478 ft long trench and install only 2-in. signal conduit and excavate for 16, 2-ft x 3-ft x 1.5 ft vaults. At the Existing Water Storage Tanks Replace all existing inlet and outlet piping on the existing redwood water storage tanks; Install new liners in the existing redwood water storage tanks; and Install new tank ladders. At the Beach: Excavate a 50 sq. ft x 1-ft deep area and pour a 6-in. concrete pad over 6-in of drain rock to install a beach rinse shower and associated sump. For directional drilling, drilling fluid will require a safe handling and spill plan will be submitted to both DPR and Cal Trans and will require implementation of Best Management Practices. Once drilling is complete, the pits will be backfilled with native soil.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Federal
Z2NZ-- 658-23-108 Correct Stormwater Drainage
Solicitation # 36C24626B0031
Solicitation 36C24626B0031 is an Invitation for Bids (IFB) issued by the Department of Veterans Affairs Network Contracting Office 6 for Project 658-23-108, which involves correcting stormwater drainage at the Salem VA Medical Center in Salem, Virginia. The project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an estimated construction magnitude between $10,000,000 and $20,000,000. The scope of work includes providing all labor, materials, and equipment for general construction and utility work, specifically the installation of a dewatering system to control ground surface water during excavation. The performance period is 450 calendar days from the issuance of the Notice to Proceed. The contract will be awarded based on FAR Part 14 Sealed Bidding procedures, typically to the lowest responsive and responsible bidder. Eligible SDVOSB bidders must be registered in the System for Award Management (SAM) and are required to perform at least 25% of the construction work. Key requirements include a bid guarantee of at least 20% of the bid price (capped at $3,000,000), adherence to Davis-Bacon wage determinations, and the ability to demonstrate the completion of three similar projects within the last three years. The final bid submission deadline was extended to October 20, 2026, with a public bid opening on October 21, 2026.
246-NETWORK Contracting Office 6 (36C246)

POSTED

about 4 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS