Russian Gulch Water Systems Upgrades

Forecast
CA-026E68FA-2026-RGWUState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Russian Gulch Water Systems Upgrades project involves extensive infrastructure improvements across multiple locations in California, primarily focused on replacing and installing new water lines. Approximately 4,522 feet of trenches, 3 feet deep and 3 feet wide, will be excavated through existing paved roads to accommodate new water lines of varying diameters: 290 feet of 8-inch line, 3,750 feet of 3-inch line (with about 40 feet connected beneath an existing bridge structure), and 482 feet of 1-inch line. Installation of utility vaults is required for operational components, including a 3-foot by 3-foot by 3-foot vault for a wharf hydrant valve tied to the 8-inch line and six 3-foot by 3-foot by 2-foot vaults to house gate valves along the 3-inch line. Directional drilling will be performed across Highway 1, involving two 10-foot by 15-foot by 5-foot deep pits on either side of the highway to install a 10-inch conduit running 290 feet at a 4-foot depth to carry both electrical and water lines. A comprehensive spill plan and Best Management Practices will be implemented for drilling fluids, with strict adherence to DPR and Caltrans requirements, and all drill pits will be backfilled with native soil upon completion. Additionally, the project includes upgrading communications infrastructure for the water treatment plant by installing 2-inch signal conduit in two separate trench systems totaling over 8,000 feet, along with 25 vaults to support the system. At the existing redwood water storage tanks, all inlet and outlet piping will be replaced, new liners will be installed, and new tank ladders will be added for safety and access. At the beach location, a 50-square-foot area will be excavated one foot deep, compacted with six inches of drain rock, and covered with a six-inch concrete pad to support a beach rinse shower and associated sump system. All work will be performed in alignment with environmental and operational standards set forth by California state agencies, with coordination centered around the Department of Parks and Recreation and oversight provided by the statewide CEQA coordinator.

General Info

Replace water lines, install vaults, directional drilling under Highway 1, upgrade treatment plant communications, renovate tanks, and build beach shower pad.

Agency

California Parks and Recreation, Department of

Place of Performance

Russian Gulch SP Road at State Highway 1, CA, 95460

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Brad MichalkStatewide CEQA Coordinator

Full Description

Show more
For Water Line Replacement: Excavate a total of approx. 4,522 feet of 3-ft deep x 3-ft wide trenches within existing paved roads and install new 8-in. (290 ft.), 3-in. (3,750 ft. – with approx. 40 ft of the new attached to the under structure of the existing bridge) and 1-in. (482 ft.) water lines; For the 8-in. line install, excavate a 3-ft x 4-ft x 3-ft hole to install a utility vault for a new wharf hydrant valve; and For the 3-in. line installation, excavate to install six (6) 3-ft x 3-ft x 2-ft vaults to install six (6) gate valves. Excavate two (2) 10-ft x 15-ft by 5-ft deep pits (1 on each side of Highway 1), to directionally drill an approx. 4-ft deep by 290-ft long to install a 10-in conduit for both electrical and water lines. For the Water Treatment Plant Communications: Excavate a 3-ft x 1-ft x 3,589 ft long trench and install a 2-in. signal conduit in a shared waterline trench and excavate for nine (9) 2-ft x 3-ft x 1.5-ft vaults; and Excavate a 3-ft x 2-ft x 4,478 ft long trench and install only 2-in. signal conduit and excavate for 16, 2-ft x 3-ft x 1.5 ft vaults. At the Existing Water Storage Tanks Replace all existing inlet and outlet piping on the existing redwood water storage tanks; Install new liners in the existing redwood water storage tanks; and Install new tank ladders. At the Beach: Excavate a 50 sq. ft x 1-ft deep area and pour a 6-in. concrete pad over 6-in of drain rock to install a beach rinse shower and associated sump. For directional drilling, drilling fluid will require a safe handling and spill plan will be submitted to both DPR and Cal Trans and will require implementation of Best Management Practices. Once drilling is complete, the pits will be backfilled with native soil.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, pumps, generator, and odor control equipment, as well as the demolition of existing pumps and piping. The project requires by-pass pumping, testing, and commissioning to ensure full operational readiness. The estimated project value is 16,690,000 dollars, with a bid schedule featuring 44 line items and a 200,000 dollar contingency allowance. The contract will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a signed bid form, bid bond, evidence of authority to sign, and MWBE compliance documentation, including a Good Faith Efforts Form claiming at least 50 points. Performance and payment bonds are required, and insurance providers must maintain an A.M. Best rating of A-VII or better. The project is subject to liquidated damages of 1,000 dollars per day for failure to meet substantial completion deadlines. Payments are processed monthly via applications for payment submitted to the engineer, with payment due 30 days after presentation to the City of Belmont.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in about 7 hours
View Details
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. has issued an Invitation to Bid for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project is located in California and seeks quotes from subcontractors and suppliers for various scopes of work, including aggregate supply, paving, electrical work, and pipe supply. The solicitation is set aside for SBA certified Women-Owned Small Businesses and encourages Disadvantaged Business Enterprise participation. Qualified bidders must possess a valid California contractor license and be registered with the California Department of Industrial Relations in accordance with Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance requirements. Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with reimbursement for bond premiums up to 3 percent. Bids must be submitted via email or fax, and while some documents list an October 28 deadline, the solicitation metadata indicates a final response deadline of December 3, 2026. All bids must remain valid for 120 days from the due date.
Flatiron Dragados Constructors, Inc.

POSTED

about 3 hours ago

DEADLINE

in 23 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS