Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on November 24, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

S--Advance Contracting Initiative (ACI) Multiple Award Task Order Contract (MATOC) Hubzone and 8a pools for Debris Management Services in Eleven (11) Coastal States within the Continental United States. SOUTHERN POOL

Awarded
W912P8-07-R-0100Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562119
New
Federal
P100--Facility Scrap and Recycling Services — VA Northeast Ohio Healthcare System – Louis Stokes VA Medical Center
Solicitation # 36C25027Q0075
The Department of Veterans Affairs, Network Contracting Office 10, is soliciting quotes for facility scrap and recycling services for the Louis Stokes VA Medical Center and its associated offsite facilities in Cleveland, Ohio. This small business set-aside under NAICS 562119 involves the on-call removal, recycling, and disposal of scrap materials, including metals, wood, plastics, and ceramics. The contractor must pick up materials within 48 hours of notification, with emergent needs addressed within 24 hours. The contract is structured with five ordering periods and a performance end date of October 14, 2031, with a possible six-month extension. Award will be based on a comparative evaluation of administrative compliance, technical approach, price, and past performance. Technical evaluations focus on the methodology for pickup and disposal, communication and ordering plans, quality control, and the ability to remit recycling proceeds to the Agent Cashier within a strict 14-day deadline. Submissions must include specific administrative documents, such as a Certificate of Insurance and a Limitations on Subcontracting Compliance Worksheet, with pricing submitted exclusively in Microsoft Excel format. The contractor must also adhere to VHA Directives for waste-stream reporting and comply with VA cybersecurity and HIPAA privacy regulations.
250-NETWORK Contract Office 10 (36C250)

POSTED

about 13 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers is establishing three Multiple Award Task Order Contract pools to support the Advance Contracting Initiative program for debris management services across eleven coastal states. The Western Pool is a HUBZone set-aside for California and Texas, the Southern Pool is an 8(a) set-aside for Louisiana, Mississippi, and Alabama, and the Eastern Pool is a HUBZone set-aside covering Maryland, Virginia, North Carolina, South Carolina, Georgia, and Florida. Selected contractors will provide equipment, operators, and laborers for the segregation, removal, hauling, disposal, and structural demolition of man-made and natural debris, including hazardous, toxic, and radiological wastes. Each pool will consist of four to eight companies holding Indefinite Delivery/Indefinite Quantity contracts with a ceiling of 200 million dollars per pool and a minimum guarantee of 10,000 dollars per firm. The contracts feature a one-year base period with four one-year option periods, with task orders competed among pool members as needs arise. Awards are based on a best value source selection process where non-price evaluation factors are significantly more important than cost. This procurement falls under NAICS code 562119 for Other Waste Collection, with a small business size standard of 11.5 million dollars.

General Info

Contract Value

$10,000

NAICS

562119 - Other Waste Collection

Place of Performance

LA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Jun 19, 2007 to Jul 23, 2007. The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist New Orleans
ContactsNo contacts available
OfficeNEW ORLEANS, LA, 70118-3651, USA
Office AddressNEW ORLEANS, LA, 70118-3651, USA
ContactsNo contact information available

Full Description

Show more
The U.S. Army Corps of Engineers (USACE) seeks to establish three MATOC pools of 8(a) and HUBZone firms on each coast of the United States. The three pools will be as follows: (1) Western Pool  HUBZone Set Aside  Responds to requirements in the s tates of California and Texas. (2) Southern Pool  8(a) Set Aside  Responds to requirements in the states of Louisiana, Mississippi, and Alabama. (3) Eastern Pool  HUBZone Set Aside  Responds to requirements in the states of Maryland, Virginia, North Carolina, South Carolina, Georgia, and Florida. All qualified business concerns may submit offers. These pools will support the USACE ACI program. The ACI program enables USACE to respond quickly to Incidents of National Significance as defined by the N ational Response Plan (NRP). See the following website for information about the NRP: http://www.dhs.gov/xprepresp/committees/editorial_0566.shtm The ACI MATOC Contractors shall provide equipment, operators, and laborers for debris management services which includes, but is not limited to, segregation, removal, hauling, disposal, and structural demolition on public, commercial, and private property as specified by the Government. Debris is defined as materials originating from the effects of any natural or man-made catastrophe or major disaster. Materials included are of both man-made and natural origins, and may include hazardous/toxic/radiological wastes (HTRW). Man-made debris, construction/ demolition (C&D) materials include, but are not limited to: lumber, concrete, asphalt, masonry, metals, and plastics. Debris of natural origins, includes, but are not limited to: all vegetative debris (grass , shrubs, stumps, and trees - including trees on houses when specified by task order) and slide materials (clay, sand, gravel, rock, residual solids) and earth collected with the debris while loading trucks. Screening of debris may be required to remove ea rthen material prior to reduction. Each MATOC pool will include contracts with 4 to 8 companies. The Government encourages teaming and joint-ventures. A joint venture may be considered a small business if all the requirements detailed in the Federal Acquisition Regulation (FAR) Part 19 ar e met. The FAR can be found on the Internet at http://farsite.hill.af.mil/vffara.htm. Task Orders will be competed amongst the members of the pool as requirements are identified. Each firm will receive an Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The ceiling for each pool will be $200M. The minimum guarantee for each firm will by $10K. These IDIQ contracts will be issued with a one-year base period and four one-year option periods. Best value source selection procedures using the trade-off process will be used in this procurement. This means that the evaluation factors, other than cost or price, when combined, are SIGNIFICANTLY MORE IMPORTANT than cost or price. The NAICS Code for this acquisition is 562119, Other Waste Collection. The small business size standard is $11.5M. The solicitation documents for this procurement will be posted on Army Single Face to Industry (ASFI). You can access these files from a link located on FedBizOps (www.fbo.gov). You will need the adobe acrobat reader for .pdf files (www.adobe.com) in ord er to open most files posted by the New Orleans District. Please register as an Interested Vendor in FedBizOps. This can be done by clicking on the solicitation title and clicking on the button that says Register as an Interested Vendor and entering your business information. Offerors are also encouraged to post notices of prospective subcontracting opportunities on the Small Business Administrations Subnet, at http://web.sba.gov/subnet. Offerors must be registered with the Central Contractor Registration (CCR), in order to receive a Government contract award. To register, the CCR Internet address is: http://www.ccr.gov. Issue date of the solicitation is TBD. The Government intends to host a pre-proposal conference on Jun 28, 2007. The conference will be virtual and include a telephone call and web based presentation. Additional information about our pre-proposal conference will be posted at a later date. The Contracting POCs for this action are Tim Black, +1 (555) 000-0000, contact@example.gov or Dianne Allen, +1 (555) 000-0000, contact@example.gov.

More opportunities from Department Of Defense → W07V Endist New Orleans

Same awarding agency

NAICS: 326199
Federal
Sources Sought for Calcaiseu River Saltwater Barrier FRP Tainter Gate
Solicitation # W912P827SS0001
The US Army Corps of Engineers, New Orleans District, is conducting market research via a sources sought notice for the design, fabrication, and delivery of fiber reinforced polymer FRP Tainter Gates for the Calcasieu River Saltwater Barrier. The requirement consists of a base bid for two gates and an option for three additional gates, totaling five units. These gates must be fully integrated into the existing structure, maintaining interchangeable installation and operation with existing steel gates, including specific bolted connections, seal locations, and machinery lifting connections. The completed gates will be delivered by barge and offloaded at the Calcasieu River Saltwater Barrier and Sector Gate facility, though the USACE will handle the actual installation. The anticipated contract will be a firm-fixed-price, Two-Phase Design Build project under NAICS code 326199, with a small business size standard of 750 employees. The government is seeking capabilities statements of no more than twenty pages to evaluate market capacity, specifically focusing on technical resources, bonding capabilities, and the ability to meet tight program schedules. Interested parties must submit their responses via email to Taylor Brandon and Karen Hargrave by 1:00 PM local time on November 4, 2026. This notice is for informational purposes only and does not constitute a formal solicitation or request for proposal.
All Other Plastics Product Manufacturing

POSTED

14 days ago

DEADLINE

in 6 days
View Details
NAICS: 237990
Federal
Barataria Bay Waterway, Maintenance Dredging, Bar Channel
Solicitation # W912P826BA062
The US Army Corps of Engineers, New Orleans District, is soliciting bids for a firm fixed price contract for maintenance dredging of the Barataria Bay Bar Channel in Jefferson Parish, Louisiana. The scope of work involves the removal of shoal material and its disposal at the Grand Terre Island disposal site, with no dike work required. The project includes the dredging of an estimated 375,000 cubic yards for the primary requirement and an additional 100,000 cubic yards as an optional quantity, along with mobilization, demobilization, and bird nesting avoidance measures. The estimated time for completion is 90 calendar days after the receipt of the notice to proceed. Award will be made to a single bidder based on total price, with a 10 percent evaluation preference applied to HUBZone small business concerns and other successful small businesses. The contractor must adhere to EM 385-1-1 safety standards, the Seagoing Barge Act, and prevailing wage rates specified in General Decision LA20260007. Key deliverables include a preliminary project schedule within 15 days and an initial project schedule within 42 days of the notice to proceed. Final acceptance is contingent upon a formal inspection by the Contracting Officer, requiring 14 days advance notification from the contractor. Payments will be processed electronically through the Wide Area WorkFlow system.
Other Heavy and Civil Engineering Construction

POSTED

about 2 months ago

DEADLINE

in almost 2 years
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS