Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

S Wells PFAS Groundwater Treatment and Disinfection Facility Project

Forecast
2022110376State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The S Wells PFAS Groundwater Treatment and Disinfection Facility Project, identified by project number 1910240-002C and solicitation number 2022110376, is being implemented by the Santa Clarita Valley Water Agency in Los Angeles County. Funded by the State Water Board, the project aims to restore the use of Wells S6, S7, and S8 to reduce dependency on imported water. The scope of work includes the construction of a per- and polyfluoroalkyl substances groundwater treatment and disinfection facility, a chloramine disinfection building, a new groundwater well (S9), and an underground 12-inch drainage pipeline connection with approximately 2,100 linear feet of associated pipelines. Additionally, the project involves critical upgrades to existing Wells S6, S7, and S8, specifically the replacement of submersible pumps and electrical panel upgrades. The project is governed by the California Environmental Quality Act, with a Mitigated Negative Declaration adopted to ensure no significant environmental effects. Administrative oversight is led by Principal Engineer Orlando Moreno. The project is located across multiple parcels in Santa Clarita, including Assessor's Parcel Number 2811-066-902. Financing for the project was approved by the State Water Board on July 23, 2026, following an initial Notice of Determination filed on August 20, 2025.

General Info

Santa Clarita Valley Water Agency project constructing PFAS groundwater treatment and disinfection facilities.

Place of Performance

Bayside Lane, Bridgeport Lane, Parkwood Lane, Newhall Ranch Road, Santa Clarita, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clarita Valley Water Agency
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Michaela GrubbEnvironmental Scientist
Orlando MorenoPrincipal Engineer

Full Description

Show more
The State Water Board is funding the Project referred to internally as S6, S7, and S8 Wells PFAS Treatment Facility Improvements Project (Incentive). The Project includes the following: construction of a per- and polyfluoroalkyl substances groundwater treatment and disinfection facility, an underground 12-inch drainage pipeline connection, approximately 2,100 linear feet of associated pipelines, new groundwater well (S9), and a chloramine disinfection building. The Project also includes related improvements at the existing Wells S6, S7, and S8, such as submersible pump replacement and electrical panel upgrades. PROJECT NUMBER: 1910240-002C

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC piping ranging from 6 to 30 inches and Ductile Iron Pipe (DIP) in 18 and 24-inch diameters. Key deliverables include the construction of standard manholes up to 72 inches, doghouse manholes up to 84 inches, and 24-inch DIP sewer trenchless crossings with associated launch and receiving shafts. Additional requirements encompass a CSO regulator fit out, outfall work, and the abandonment of existing pipes and manholes. Supporting site activities include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), clearing and grubbing of 5,130 square yards of wooded areas, and subsequent seeding and fine grading. The project also requires geotechnical instrumentation and monitoring, maintenance of flows and bypass, and specific railroad insurance. Point of contact for this opportunity is John Connelly at [email hidden].
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on socioeconomic compliance through required Minority and Women-Owned Business Enterprise documentation. Bidders must provide a Good Faith Efforts Form and Table A to be considered responsive. The project is governed by EJCDC standard general and supplementary conditions, requiring both performance and payment bonds from sureties with an A.M. Best rating of A-VII or better. Performance begins upon a written Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. Final acceptance is contingent upon the Engineer's determination of substantial completion and the resolution of a final punch list.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 2 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS