Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

S Wells PFAS Groundwater Treatment and Disinfection Facility Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santa Clarita Valley Water Agency is advancing the S Wells PFAS Groundwater Treatment and Disinfection Facility Project to remediate contaminated groundwater and restore the operational use of Wells S6, S7, and S8 by constructing a dedicated per- and polyfluoroalkyl substances treatment and disinfection facility. The project includes the installation of a new groundwater well, S9, along with approximately 2,100 linear feet of associated pipelines, an underground 12-inch drainage pipeline connection, and a chloramine disinfection building. Existing infrastructure at Wells S6, S7, and S8 will also be upgraded with submersible pump replacements and electrical panel improvements. All work is centered in Santa Clarita, California, with the place of performance designated as 91355. The project is being undertaken under state environmental compliance procedures, specifically the California Environmental Quality Act, which has been satisfied through the preparation of a Final Environmental Impact Report and a corresponding Notice of Determination confirming that mitigation measures will effectively reduce significant environmental impacts. The agency code f4e9f9b0 identifies the Santa Clarita Valley Water Agency as the funding and oversight entity, with Orlando Moreno listed as the Principal Engineer for project coordination and Michaela Grubb as an Environmental Scientist for regulatory liaison. While the project is publicly forecasted and environmental approvals are complete, no contract award has been made, and no formal solicitation, pricing, contract clauses, evaluation factors, or administrative details such as payment procedures, contracting officer assignments, or inspection criteria have been finalized or published. The absence of standardized FAR sections, delivery schedules, cost estimates, or procurement documentation indicates the project remains in the pre-award, planning stage with full operational implementation pending future competitive bidding and contract execution.

General Info

Santa Clarita Water Agency plans PFAS treatment facility for Wells S6-S8, adding well S9 and infrastructure upgrades in California.

Agency

California → Santa Clarita Valley Water Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Bayside Lane, Bridgeport Lane, Parkwood Lane, Newhall Ranch Road, Santa Clarita, CA

Set-Aside

NONE

Documents

(2)

NOD

PDF

Notice of Determination for S Wells PFAS Groundwater Treatment Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clarita Valley Water Agency
Contacts2 people available
OfficeN/A
Organization / Agency
California → Santa Clarita Valley Water Agency
Office AddressN/A
Contacts
Michaela GrubbEnvironmental Scientist
Orlando MorenoPrincipal Engineer

Full Description

Show more
The State Water Board is funding the Project referred to internally as S6, S7, and S8 Wells PFAS Treatment Facility Improvements Project (Incentive). The Project includes the following: construction of a per- and polyfluoroalkyl substances groundwater treatment and disinfection facility, an underground 12-inch drainage pipeline connection, approximately 2,100 linear feet of associated pipelines, new groundwater well (S9), and a chloramine disinfection building. The Project also includes related improvements at the existing Wells S6, S7, and S8, such as submersible pump replacement and electrical panel upgrades. PROJECT NUMBER: 1910240-002C

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle through its Aviation Project Management Group is preparing to restore the integrity of a 1947 water main located along the northbound Airport Expressway using cured-in-place pipe (CIPP) technology under a Design-Bid-Build procurement model. This project aims to rehabilitate the aging infrastructure without extensive excavation, employing modern lining methods to extend the service life of the water main while minimizing disruption to surrounding traffic and facilities. The work will focus on improving water system reliability and compliance with current standards, addressing potential leaks, corrosion, or structural weaknesses in the century-old管道. The solicitation is forecasted for release with a posting date of July 29, 2026, and is classified under NAICS code 237110 for Water and Sewer Line and Related Structures Construction. The primary point of contact for inquiries is Moraa Omwega, with Ray Moreno serving as Project Manager, both reachable through the Port of Seattle. All work is expected to be performed at the specified location along the Airport Expressway, and interested parties should monitor the official port portal for the formal solicitation release, bidding requirements, and submission deadlines. No set-aside provisions are indicated at this stage, and the project will likely be open to qualified contractors with demonstrated experience in CIPP installation and municipal water main rehabilitation.
Aviation Project Management Group

POSTED

about 18 hours ago

DEADLINE

N/A
View Details
NAICS: 237110
New
SLED
Corydon Well Replacement Project
Solicitation # 20260728051
The Corydon Well Replacement Project involves the decommissioning and replacement of the existing Corydon Well with new infrastructure to integrate it into the EVMWD Backbasin Groundwater Blending and Treatment Schematic. The project will connect to existing pipelines used for groundwater blending and will prepare for future upgrades, including dual-purpose flush-to-waste discharge and raw water supply lines, as well as the addition of PFAS treatment capabilities at the Backbasin Groundwater Treatment Plant. The integration is designed to enhance system reliability and water quality by linking the Corydon Well with other nearby wells including Cereal 1, 3, 4, Diamond, and Summerly, ensuring seamless operation within the broader regional water supply network. This effort is part of a planned design and construction phase scheduled between 2026 and 2028. The solicitation for this project, identified as 20260728051, was posted on July 29, 2026, with a response deadline of September 1, 2026. It falls under NAICS code 237110 for Water and Sewer Line and Related Structures Construction and is managed by the Eastern Municipal Water District in California. The work is to be performed in Lake Elsinore, with a zip code of 92530, and is classified under state, local, or educational government agency procurement. Bidders must respond through the official BidAmerica portal, and while no set-aside preferences are indicated, the project requires contractors with expertise in groundwater infrastructure, pipeline integration, and advanced water treatment system planning.
EVMWD

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
International
Elk Ridge Water Treatment Plant Upgrade Construction
Solicitation # 2026-RVER-003
The Resort Village of Elk Ridge is seeking qualified General Contractors to undergo a prequalification process for the construction of upgrades to its raw water well pumping system and the expansion of the existing water treatment plant. This initiative is part of a two-stage procurement process, with the first stage focusing solely on prequalifying contractors based on their demonstrated experience in constructing, commissioning, and starting up similar water treatment and raw water pumping infrastructure. Only those who meet all mandatory criteria and submit complete documentation via the online Bids and Tenders system by 2:00 p.m. CST on August 12, 2026, will be considered. Submissions received after the deadline or lacking required elements will be rejected. All inquiry submissions must be made in writing by email, with a cutoff date of 4:00 p.m. CST on August 5, 2026, and no inquiries received after this time will be addressed. The project’s documentation becomes available on July 21, 2026, through the Bids and Tenders website. This project is partially funded by the Government of Saskatchewan under the Investing in Canada Infrastructure Program, requiring full completion by March 31, 2028. Technical questions may be directed to Andrew Bueckert via phone or email, while general inquiries should be addressed to Michele Bonneau. The solicitation number is 2026-RVER-003, and the project is being managed by the Resort Village of Elk Ridge under the Saskatchewan Public Sector. Bidders must access all information and submit responses exclusively through the specified online portal, and no alternative submission methods will be accepted. Failure to comply with procedural requirements will result in disqualification regardless of experience or capability.
Resort Village of Elk Ridge

POSTED

about 21 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
SLED
Fire Hydrant & Water Meter Replacement
Solicitation # BD-18-1880-SMHA0-SHA01-131663
The project involves the installation of three fire hydrants, with the hydrants themselves being provided by the town, along with the main water meter for the site, all associated fittings within the vault, and temporary bypass piping to ensure uninterrupted service during construction. All work must be completed in accordance with technical specifications and local regulations, with the contractor responsible for coordination, labor, and equipment necessary to execute the scope. Bids for this solicitation must be submitted electronically through biddocs.com; hard copy submissions are not accepted, and interested parties must register as electronic bidders in accordance with the instructions provided in the bid documents. The bid window closes on August 14, 2026, at 4:00 PM, and late submissions will not be considered. This solicitation is managed by the Somerset Housing Authority under the state of Massachusetts, with the work to be performed at Kennedy Terrace in Somerset, MA 02726. The solicitation number is BD-18-1880-SMHA0-SHA01-131663 and was posted on July 29, 2026. Primary point of contact for inquiries is Danielle Reid, Purchaser, reachable at 978-657-9714. All communications, documentation, and bid submissions must adhere to the electronic bidding process outlined by the procurement system, and bidders must ensure they are fully registered and compliant before the deadline. No set-aside provisions are specified, and the project falls under a state, local, or education agency procurement structure.
SMHA01 - Somerset Housing Authority

POSTED

1 day ago

DEADLINE

in 15 days
View Details