This Solicitation opportunity from Hawaii was posted on May 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
S10955 - Honolulu Harbor, Pier 10, Substructure Repairs, Oahu
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the repair of spalls and delaminations on the substructure of Pier 10 at Honolulu Harbor, Oahu, Hawaii, under solicitation number B26002964, with a response deadline of June 19, 2026. The work involves phased concrete repair activities including sounding and removal of deteriorated concrete, replacement of corroded reinforcing steel, formwork installation, and placement of repair concrete achieving a minimum compressive strength of 4,000 psi within seven days or meeting a 5,000 psi specification. Repair surfaces must be prepared per SSPC-SP-2 or SSPC-SP-3 standards and comply with ICRI Guideline No. 310.1R-2008, using approved materials such as Amerlock 400 epoxy coating, Sika Armatec 110 Epocem, and SET 3G epoxy grout. Work must adhere to the Hawaii Standard Specifications for Road and Bridge Construction (2005), ACI 318R, ACI 546R, and other referenced standards, with manufacturer representatives present during coating application for quality assurance. Performance is strictly limited to the project site at Pier 10, with final acceptance administered by the State of Hawaii’s Harbors Construction Engineer. The contract follows a Lowest Price Technically Acceptable (LPTA) award methodology, with no formal evaluation factors or weights published, and bids must be submitted exclusively through the HIePRO portal. Bidders are required to provide a 5% bid security and comply with stringent state-specific provisions, including a mandatory certification that at least 80% of the workforce consists of Hawaii residents, with violations leading to payment withholding or contract termination. Contractors must also submit certified weekly payrolls under HRS Chapter 104 to ensure prevailing wage compliance, disclose all subcontractors, and maintain payroll records for four years. Additional obligations include submitting a Best Management Practices plan to prevent environmental contamination, notifying Hawaii 811 at least 28 days before excavation, obtaining permits for welding operations, and adhering to prohibitions on campaign contributions to state officials. Mobilization costs are fixed at $15,000, and erosion and dust control is estimated at $15,000, though most line-item unit and extended prices remain blank, preventing calculation of the total estimated contract value. All work must commence within ten working days
General Info
Agency
NAICS
Place of Performance
HI, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Hawaii → Department of Transportation
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
