This Combined Synopsis/Solicitation opportunity from Department Of Veterans Affairs was posted on April 15, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

S208--National Shrine Services Millennial Project at Fort Logan National Cemetery

Awarded
36C78620Q0175Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
SLED
Santa Cruz Gateway Landscape Improvements
Solicitation # ED-0330
The City of Santa Cruz, through the Office of Economic Development and Housing, is soliciting bids for the Santa Cruz Gateway Landscape Improvements project located at Ocean Street and Plymouth Street. This public works project involves a comprehensive scope of work including demolition, site and soil preparation, irrigation installation using 2-inch Schedule 40 PVC, planting, concrete work, lighting, and low-voltage electrical work. The contract will be awarded to the lowest responsive and responsible bidder on a firm-fixed fee basis, with a required project completion timeline of 45 working days. Bids must be submitted electronically via the OpenGov portal, with the final deadline extended to November 5, 2026, at 5:00 pm. Qualified contractors must possess a Prime B license and comply with various regulatory requirements, including the Living Wage Ordinance, Equal Employment Opportunity regulations, and DIR registration for prevailing wage compliance. Bidders are required to provide a bid security of at least 10 percent of the bid amount, and the successful awardee must provide a 100 percent performance bond and a payment bond of at least 50 percent if the contract is under 1 million dollars. Evaluation factors include the complete submission of the bid form and available local business preferences, offering a 2 percent preference for businesses with a local office and an additional 4 percent for those with local ownership. All work must adhere to the City's 2002 Standard Specifications, 2025 Standard Details, and applicable ADA and ABA accessibility standards.
Economic Development and Housing

POSTED

about 8 hours ago

DEADLINE

in 7 days
NAICS: 561730
New
SLED
IFB 2027-10-29 Snow/Ice removal
Solicitation # 2027-10-29
Encompass Community Supports (ECS) is soliciting bids for snow and ice removal services across 12 different sites in five Virginia counties. This Invitation for Bids (IFB 2027-10-29) will be awarded to the lowest responsive and responsible bidder based on a Unit Price Schedule that must include all labor, materials, equipment, and insurance. The contract period runs from the date of award through November 18, 2031, with four optional one-year renewal periods. Bids must be submitted via eVA or mailed to the Culpeper, Virginia office by November 19, 2026, at 2:00 P.M. The scope of work requires pre-treatment of all lots the day or night before snowfall and triggers service once accumulation reaches two inches, and every two inches thereafter. Response times are prioritized by facility type, with critical residential facilities requiring removal within two hours and office facilities within six hours. Notably, the use of rock salt is strictly prohibited at all locations, and contractors must provide approval for their proposed ice-melt products and corresponding Material Safety Data Sheets. Contractors must provide a certificate of insurance naming ECS as an additional insured and maintain records for ten years following final payment. Bidders are required to submit a Small Business Subcontracting Plan and certify their licensure and debarment status. Payment is processed on a monthly basis with standard terms of 30 days. ECS retains the right to cancel the contract with 30 days written notice and holds the authority to terminate the agreement if performance standards are not met.
Encompass Community Supports

POSTED

about 9 hours ago

DEADLINE

in 21 days

General Info

Contract Value

$211,643.8

NAICS

561730 - Landscaping Services

Place of Performance

Fort Logan National Cemetery;4400 W. Kenyon Ave.;Denver, Colorado 80235, VA, 80235, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → National Cemetery Administration (36C786)
Contacts1 person available
OfficeQUANTICO, VA, 22134, USA
Office AddressQUANTICO, VA, 22134, USA
Contacts
Jerry L. Hodson Jr

Full Description

Show more
AMENDMENT-0001, Combined Synopsis-Solicitation 36C78620Q0175 Ft Logan National Shrine Contractor Questions & GOV Responses 1. Due to COVID-19 pricing must be good for 120 days from date quote is submitted for this solicitation. 2. The Introduction shared within the solicitation documentation makes reference to trimming and pruning trees. "The Department of Veteran Affairs, Fort Logan National Cemetery intends to award a fixed price contract to remove, raise, realign, reset, and clean designated upright headstones; and renovate designated sections of turf in designated burial sections with additional earthwork in certain sections; and trim/prune trees. The Fort Logan National Cemetery is located at 4400 West Kenyon Avenue, Denver, CO 80235." - Is that reference correct? Will we need to trim / prune trees, and if so, how many trees? 2. GOV Response: The trimming and pruning of the trees are tasks that may be required if they are damaged during the work process. See PWS in restoration process as stated on Section B.3 paragraph H. There are 9 small/medium height tress within section 28. 3. The Period of Performance is currently listed as "9 months (270 days)." Is this potentially flexible? Given that the situation with COVID-19 is still impacting many of us, and may impact a start date, we're a bit concerned about the time frames we would be expected to adhere to. The other factors that we would want to consider with the contracting team would be that vendors won't be able to sod after October when irrigation is shut off, and if work is anticipated to run through the winter, there will likely be days and even weeks when work will have to stop due to severe weather. To that end, we're interested in understanding if there is any flexibility in the stated period of performance. 3. GOV Response: The period of performance is 270 days from the Notice to Proceed; the Contractor should plan to accomplish all tasks within the scope of works to include turf establishment. The Government reserves the right to extend the contract due to unforeseen circumstances; request for extension needs to be justifiable with the coordination and agreement of the COR and it s needs to be in writing for the CO for consideration and/or approval. 4. The Statement of Work calls out "Utilizing existing burial section grid monumentation for all headstone row layout work." Can the contracting team please confirm that the cemetery has an existing grid system, or state whether or not we would need to create a new grid system for use with the project? 4. GOV Response: Section 28 is a 5x5 section with a couple of irrigation passageway; the Contractor shall coordinate with the COR to ensure the layout dimensions using existing control markers; if the control markers are not found, the Contractor shall furnish temporary control markers/points using a registered professional land surveyor to ensure accuracy of the layout. 5. The Statement of Work states: "The Continental District (NCA-CD) office will provide each Cemetery with the correct Gravesite Layout Map(s) prior to beginning the R&R project. The COR or Cemetery Director/designee shall conduct an initial gravesite verification survey prior to the R&R of any headstone in the Cemetery. The COR will obtain a copy of the Burial Register Report from the Burial Operation Support System (BOSS) and current gravesite layout map(s) obtained from the NCA-CD for the verification survey. The Burial Register Report and gravesite layout map(s) will be used to verify the section, row, grave number, first and last name of each decedent and the condition of the headstone included in the Scope of Work. All inconsistencies will be researched, discussed and resolved with the NCA-CD Executive Director prior to the R&R of any headstone. Upon completion of the verification survey and corrective actions as necessary, the COR shall certify the survey by signing the Headstone Raise & Realign Verification Survey sheet (see Attachment 4). A copy of the signed Headstone Raise & Realign Verification Survey sheet shall be forwarded to the Contracting Officer (CO) which will be incorporated into the contract files and provided to the Contractor prior to R&R; a copy of the survey will be maintained by the Cemetery. Additional copies of the survey will be retained by the COR for the official contract files. The CO will give the approval to begin R&R process." Will we need to document all damaged headstones before removing them for realignment? By way of providing some context for this question. On the existing raise and realign project that we're working now at Fort Logan, we did not receive a copy of the verification survey and have been asked to keep track of the damaged stones so that we can compare notes at the end of the project. We can make either work from our standpoint but would like some clarification on the method to be utilized on this project. 5. GOV Response: Prior to commence any work, all supporting documents regarding Burial registers and section/cemetery layout maps will be provide to the awarded Contractor. Attachment 4 Initial Headstone Raise & Realign Survey will be used to identify any discrepancy of the headstones; it is highly encourage that this survey a joint inspection with the Contractor and the Government representative. This survey should be coordinated thru the COR to find out when and how it will be conpleted; other forms for recording discrepancy can be use like photographs, matrices, maps, etc. as long the both parties are in agreement with the findings. 6. In Section J. Layout of Work found within the solicitation documentation, we read the following, "The Contractor shall lay out the work and shall be responsible for all measurements in connection with the layout. Where burial section grid monumentation exists, it shall be utilized for all headstone row layout work, and contractor shall coordinate all associated field layout dimensions with COR prior to start of work. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to layout any part of the work. The Contractor shall execute the work to the lines and grades needed to accomplish the work and to ensure that headstones are correctly and accurately located on their associated gravesites. The Contractor shall maintain and preserve all temporary and permanent stakes and other marks until authorized by the COR to remove them. If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor. ii. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall be used for layout control of work and to restore any grave section corner monuments that may be disturbed as a result of the Contractor s performance of the contract work. 1.3. HEADSTONE RAISE AND REALIGNMENT PROCESS: 1.3.1. Prior to starting work in each burial section, the location of the existing permanent gravesite control markers and the required gravesite row/gravesite spacing layout dimensions shall be verified and certified by a licensed surveyor and coordinated with the COR. 1.3.1.a. The Contractor shall use a licensed surveyor to validate and/or relocate any existing permanent control markers that do not conform to the section layout. There s much different cost related to validate and/or relocate. 1.3.1.b. The Contractor shall use a licensed surveyor to install temporary control markers where any existing permanent control markers cannot be located or are missing. 1.3.1.c. The Contractor shall use a licensed surveyor to accurately and precisely install temporary control markers at the ends of each gravesite row. 1.3.2. Headstones shall be accurately adjusted and precisely reinstalled on the correct gravesites by utilizing temporary grave plotting maps, existing permanent gravesite control markers, temporary contractor installed gravesite control markers, and temporary contractor installed control markers at the ends of each gravesite row. All measurements, setting of string lines, and the layout of rows/columns shall be taken from existing or temporary gravesite control markers, and NOT from previously set headstones, unless otherwise directed by the COR." It states in i, where grid monumentation exists it should be used for all headstone row layout, in ii, it states that contractors will be expected to pay a surveyor for layout control work and restore any disturbed monuments. We understand the need to pay a surveyor to confirm that the existing burial section grid monumentation is correct, and that it may be necessary to pay for the establishment of additional control points that we as a contractor would need to use in conjunction with the project, but we question our understanding of the language that seems to indicate that the contractor would need to absorb the cost to re-survey and build an entire new grid layout for the cemetery and provide new plan sheets at no additional cost to the cemetery. I'm thinking that we're likely misunderstanding that point. If the contracting team could please clarify, it would be much appreciated. Additionally, can the contracting team please confirm that the cemetery has an existing burial section grid monumentation that is correct for the entire section 28? 6. GOV Response: Prior to starting work in each burial section/grid, the location of the existing permanent gravesite control markers and the required gravesite row/gravesite spacing layout dimensions shall be verified and certified by a licensed surveyor and coordinated with the COR. The Contractor shall use a licensed surveyor to validate and/or relocate any existing permanent control markers that do not conform to the section layout. The Contractor shall use a licensed surveyor to install temporary control markers where any existing permanent control markers cannot be located or are missing. The Contractor shall use a licensed surveyor to accurately and precisely install temporary control markers at the ends of each gravesite. If any of the permanent or temporary control points or markers are damage during the construction phase, the Contractor will need to re-survey and replacement them; especially permanent ones. Also, all markers shall stay in place until the COR has verified that the row(s) are anchored firmly, and the set conditions of the headstones are accepted by the Government. 7. There appears to be an inconsistency in reference to the headstone materials. CLIN 0001 refers to "upright marble headstone", but CLIN 0003 references the need to "clean upright granite headstones." Can the contracting team please advise as to whether the headstones are marble or granite? Having a clear understanding will help to shape the approach and materials utilized in the headstone cleaning process? 7. GOV Response: All the headstones in this section are upright marble and cleaning shall be in accordance with Section 04 01 00.

More opportunities from Department Of Veterans Affairs → National Cemetery Administration (36C786)

Same awarding agency

NAICS: 337211
New
Federal
Furniture Tahoma National Cemetery
Solicitation # 36C78627Q0020
Solicitation 36C78627Q0020 is a combined synopsis and request for quotation issued by the Department of Veterans Affairs, National Cemetery Administration, for the purchase, delivery, and installation of new commercial furniture at Tahoma National Cemetery in Kent, Washington. This firm-fixed-price purchase order is a total small business set-aside under NAICS code 337211. The scope of work includes providing desk systems, tables, seating, lockers, and storage for the Administration and Honor Guard buildings, with all work to be completed within 60 days after receipt of order. The contractor is responsible for all unloading, placement, and professional installation, as well as the removal of all packaging debris and the protection of government facilities during the process. The government will award the contract to the responsible offeror who provides the lowest price that is found to be fair, reasonable, and technically acceptable based on a pass/fail evaluation of the submitted technical documentation. Interested vendors must submit their quotations electronically by November 16, 2026, at 4:00 PM PST, organized into three separate PDF volumes: Administrative, Price, and Technical. Requirements include active registration in the System for Award Management and adherence to specific supplemental insurance minimums, including $500,000 for general liability bodily injury and $100,000 for property damage. Delivery is FOB Destination, and contractors must coordinate scheduling at least 14 business days in advance.
Wood Office Furniture Manufacturing

POSTED

1 day ago

DEADLINE

in 18 days
View Details
NAICS: 811310
New
Federal
J039 - Equipment Maintenance - Golden Gate National Cemetery
Solicitation # 36C78627Q0027
The Department of Veterans Affairs, through the National Cemetery Administration, is issuing a sources sought notice for recurring large equipment maintenance at the Golden Gate National Cemetery in San Bruno, California. Under NAICS code 811310, the government is seeking capable vendors to provide all labor, supervision, tools, equipment, materials, and transportation necessary to perform on-site preventative and corrective maintenance. The scope of work covers government-owned equipment including dumpers, forklifts, utility vehicles, loaders, and mini excavators. Services must be performed in accordance with manufacturer recommendations and government schedules, encompassing oil and filter changes, fluid and lubrication services, battery testing, and comprehensive system inspections of engines, drivetrains, hydraulics, and electrical systems. Interested respondents must submit their company name and Unique Entity Identifier (UEI) to the contracting officer by the November 3, 2026, deadline, and are encouraged to provide a capabilities statement. Qualified contractors must employ certified mechanics and technicians with experience in heavy equipment maintenance and the ability to service both diesel and gas-powered machinery. Key performance requirements include rigorous safety system checks and forklift inspections to ensure operational compliance. All maintenance activities are to be conducted on-site at the cemetery facility.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

3 days ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
Federal
Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies
Solicitation # 36C78626B0028
The Department of Veterans Affairs National Cemetery Administration is soliciting bids for the Fort Bliss National Cemetery Gravesite Expansion and FCA Deficiencies project in El Paso, Texas. This firm-fixed-price contract is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with an estimated construction magnitude between $20 million and $50 million. The scope of work includes burial expansion, sitework, and the correction of FCA deficiencies, organized into a base bid for installation and pre-placed crypts, and a separate bid option for additional burial expansion and sitework. The project involves comprehensive construction activities, including the installation of 6,632 pre-placed crypts, mass grading, stormwater pollution prevention, and various architectural improvements to the Administration and PIC/Restroom buildings, such as clay roof tile replacement, stucco application, and electrical upgrades. The performance period is 540 calendar days from the notice to proceed, with work beginning within 10 days of award. Bidders must comply with Davis-Bacon prevailing wage requirements and provide performance and payment bonds totaling 100 percent of the awarded contract amount. Technical requirements include adherence to ADA accessibility standards, OSHA safety regulations for excavations, and strict guidelines for the treatment of historic decorative metal. Award will be granted to the responsible bidder whose conforming bid is determined to be most advantageous to the government, with evaluation based primarily on price and price-related factors.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 14 days
View Details
NAICS: 561730
New
Federal
Grounds maintenance services for Riverside National Cemetery. -- S208
Solicitation # 36C78626R501200008
The Department of Veterans Affairs National Cemetery Administration is soliciting proposals for comprehensive grounds maintenance and improvement services at Riverside National Cemetery in Riverside, California. This is a best value source selection procurement set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS 561730. The contract structure consists of a twelve-month base year starting November 1, 2026, with four subsequent twelve-month option years. The scope of work covers approximately 460 developed acres and includes turf and grasses maintenance, pest control, irrigation system services, pond and drainage system maintenance, trash and debris removal, structure cleaning, and a one-time replacement and repair of the MOH pool pump system. The maximum aggregate value of the contract is 23,000,000 dollars, with a guaranteed minimum of 9,115.51 dollars. Award decisions will be based on a tradeoff analysis of three factors: Technical Capability, Past Performance, and Price, with the combined non-price factors carrying more weight than price. Technical evaluation focuses on the offeror's approach to turf management, safety compliance with OSHA and SCA standards, and the qualifications of key personnel, specifically the Site Manager. Proposals must include a signed SF 1449, completed price schedules, a draft Quality Control Plan, and at least two relevant past performance references. Following several amendments to address technical publishing issues and vendor inquiries, the final deadline for proposal submission has been extended to November 5, 2026, at 5:00 PM PST, with submissions sent via email to the contracting office.
Landscaping Services

POSTED

4 days ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS