SAC Bridge Preservation (HM) (EA 03-3G600)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The California Department of Transportation (Caltrans), District 3 – Marysville/Sacramento, has initiated a preventative maintenance project targeting eight bridge structures along State Route 51 and Interstate 80 in Sacramento County under project identifier EA 03-3G600. The scope includes applying polyester concrete overlays on bridge decks and approach slabs, replacing all joint seals, performing epoxy injection to repair cracks at the hinges of the Fort Sutter Viaduct, and installing new access openings. All work is confined to existing right-of-way and is classified as routine maintenance under Caltrans CEQA Class 1(d) and NEPA categorical exclusions, eliminating the need for additional environmental permits or regulatory coordination. The project is supported by specific Caltrans task specifications including SAC-051-0.24, SAC-051-1.24, SAC-051-1.28, SAC-051-3.36, SAC-051-5.50, SAC-080-M1.36, and SAC-080-M6.12, ensuring alignment with state standards. An asbestos survey is required prior to concrete grinding activities, and work must comply with all applicable safety protocols. Key personnel overseeing environmental compliance and project execution include Jason Ammerman as the Environmental Scientist, Lisa Machado as Senior Environmental Planner, and Gary Dekens as Project Manager, all of whom are signatories to the environmental exemption documentation. The solicitation was posted on July 24, 2025, with execution planned to follow shortly, though no formal period of performance, delivery schedule, or funding amounts are disclosed. No contract clauses from the Federal Acquisition Regulation (FAR) or Defense FAR Supplement (DFARS) are included, and no pricing, line items, evaluation factors, or award methodology are specified, indicating this is a preliminary forecast document lacking full contract terms. Submission instructions, deadlines, proposal formats, and invoicing procedures are also not detailed in the available materials, suggesting the formal Request for Proposal or Invitation for Bid components have not yet been released.
General Info
Agency
NAICS
Place of Performance
Sacramento, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
