Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on February 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Safer Access to Pajaro Valley High School and Beyond

Closed
ST-25-14859State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

27 minutes ago

DEADLINE

in 24 days
NAICS: 237310
New
International
Buckinghamshire Highways Works Open Framework
Solicitation # BC/0002075
The Buckinghamshire Highways Works Open Framework, solicitation BC/0002075, is a procurement by Buckinghamshire Council to establish an Open Framework Scheme for highway-related construction, capital-funded maintenance, and improvement schemes. The framework is designed to enhance the operation and serviceability of highway assets and is divided into seven discrete lots, with the intention of appointing a maximum of four suppliers per lot. The total estimated value of the contract ranges from £126,030,000 excluding VAT to £151,236,000 including VAT, with a maximum total duration of eight years from the commencement of the initial framework agreement, estimated to end by April 1, 2035. The procurement process is conducted in two stages, beginning with a Pre-Qualification Stage (PSQ) that evaluates financial standing, health and safety policies, and data protection. Bidders must meet specific insurance requirements, including £20m for both Employer’s and Public Liability Insurance and £5m for Professional Indemnity Insurance. Award decisions are based on the most advantageous tender, weighted 60% on price and 40% on quality. Quality assessments focus on technical capability, service delivery, the NEC4 delivery model, innovation, social value, and sustainability. Performance will be monitored through five core Key Performance Indicators (KPIs) and additional call-off KPIs. There is no set-aside status for this solicitation.
Buckinghamshire Council

POSTED

about 17 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
Curtiss Park Trail State Project No. 128-158
Solicitation # E26-01
The Town of Simsbury is soliciting bids for the Curtiss Park Trail project, State Project No. 128-158, which involves the construction of approximately 3,000 linear feet of bituminous concrete multi-use trail. The trail will run along the north side of Tariffville Road, crossing the Farmington River via an existing sidewalk on the Tariffville Road bridge, and extending to Curtiss and Pattison Parks. The scope includes the construction of a boardwalk section within and adjacent to wetlands in the Farmington River riparian corridor. This project is funded through the Transportation Alternatives Program and is administered by the Connecticut Department of Transportation. The contract will be awarded to the lowest responsive and responsible bidder who is properly licensed, adequately staffed, and experienced in the required work. Bidders must provide a CTDOT contractor prequalification certificate and submit a physical bid package including a non-collusion affidavit, bid security, and a hold harmless and indemnification agreement. Key technical requirements include adherence to CTDOT Standard Specifications and Connecticut Guidelines for Soil Erosion and Sediment Control. Revised bid quantities include 1,172 cubic yards of earth excavation and 1,710 tons for the disposal of controlled materials. There is no set-aside status for this solicitation, and the DBE participation goal is zero percent. Bids are due by November 24, 2026, at 2:00 PM.
DAS Procurement

POSTED

about 19 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The project involves widening the Caltrans overpass near Pajaro Valley High School to enhance pedestrian and bicycle safety for the school’s approximately 1,500 students, many of whom walk to school. The bridge will be expanded by 6 feet 8 inches to accommodate a 6-foot 2-inch sidewalk and an 8-foot wide bi-directional bike lane, separated from vehicle traffic by a concrete barrier. Additional improvements include upgrading curb ramps and installing high-visibility crosswalks at various school intersections, as well as adding buffered bike lanes along Green Valley Road. These measures aim to provide safer access not only for Pajaro Valley High School students but also for those attending feeder schools. Due to the widening, the existing sanitary sewer force main beneath Highway 1 must be relocated to avoid conflicts with the new driven piles supporting the bridge expansion. The relocated force main will utilize an empty casing that was installed when the overpass was originally constructed. All work, including the bridge widening, sanitary sewer relocation, and off-site bike and pedestrian improvements, will occur within the Caltrans right of way and will be conducted under a Caltrans Encroachment Permit with their oversight. While PG&E and Spectrum have already relocated their overhead utilities, the AT&T overhead communication line has yet to be moved, but this is expected to be resolved prior to the project’s Notice to Proceed. The solicitation for this project was posted by the City of Watsonville’s Public Works & Utilities department in early 2026, with the deadline for responses set for March 11, 2026.

General Info

Widen Caltrans overpass near Pajaro High for safer pedestrian, bike access; relocate sewer line.

Documents

15
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first2 pages · bid-guarantee-bond
High
PDF, High priority: read this firstpermit-document
High
PDF, High priority: read this first38 pages · encroachment-permit
High
PDF, High priority: read this first31 pages · project-labor-agreement
High
PDF, High priority: read this first15 pages · contract-document
High
PDF, High priority: read this first7 pages · amendment
High
PDF, High priority: read this first44 pages · biological-analysis
High
PDF, High priority: read this first240 pages · ifb
High
PDF, High priority: read this first116 pages · construction-plans
High
PDF, High priority: read this firstfoundation-report
High
PDF, Low prioritycategorical-exclusion-determination
Low
PDF, Low priorityother
Low
PDF, Low priorityother
Low
DOCX

Read all 15 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 5 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 9 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works & Utilities
Contacts2 people available
OfficeWatsonville, CA, 95076, USA

Interested Companies (9)

Bowman & Williams - Civil Engineers and Land SurveyorsSoquel, CA
Corcus ConstructionSan Francisco, CA
Forefrefront Deep FoundationsNewport Beach, CA

See All 9 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Pajaro Valley High School serves 1,500 students, many of whom walk to school. The benefit of the bridge widening will be to create a safe space for pedestrians and bicycles that is separated from vehicle traffic by a concrete barrier. The work on the Caltrans overpass includes widening the bridge by 6'-8" to accommodate a 6'-2" sidewalk and an 8'-0" bi-directional bike lane with a concrete barrier to separate the vehicle traffic. Additional pedestrian safety work will be done at various school intersections, which includes upgrading curb ramps and adding high-visibility crosswalks. Green Valley Rd. (between Melwood Way and Pennsylvania Drive) striping will be upgraded to add buffered bike lanes. The existing sanitary sewer force main was installed in a casing that runs below Highway 1. It was determined during the bridge widening design that it was in conflict with the driven piles to support the widened structure, so relocation is required. When the overpass was originally built, an empty casing was installed. This will be utilized for the relocated force main. The offsite bike and pedestrian improvements are intended to improve safety for students who attend the PVHS feeder schools. These include enhanced crossings and buffered bike lanes along Green Valley Rd. The bridge widening and sanitary sewer force main relocation work is within the Caltrans right of way. All work shall be done under a Caltrans Encroachment Permit and oversight. As of this posting, the AT&T overhead communication line that traverses the overpass has not been re-located, but the City anticipates that this conflict will be resolved prior to Notice to Proceed. The PG&E and Spectrum overhead utilities have completed relocating their lines and poles.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS