Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Safer Downtown Burbank Mobility Network Improvement Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Safer Downtown Burbank Mobility Network Improvement Project, managed by the City of Burbank Community Development Department, focuses on enhancing the bicycle network and pedestrian crossings across four streets in Downtown Burbank. The project involves adding 0.75 road miles of new bike facilities and upgrading 1.6 road miles of existing facilities using quick-build materials such as signage, striping, curbing, and plastic or rubber bollards. Notably, the project requires no physical construction and does not increase the number of automobile lanes. Key deliverables include the installation of painted Class II bike lanes on Orange Grove Avenue, Third Street, and Providencia Avenue. Additionally, existing Class II lanes on Third Street and Angeleno Avenue will be upgraded to Class IV lanes with vertical separation. The project also involves creating a Class III bicycle route on Third Street and enhancing another on Providencia Avenue through the addition of wayfinding, red curbs at stop signs, curb extensions, and centerline hardening. This initiative is conducted under a California Environmental Quality Act Categorical Exemption for existing facilities, with Kyle Kramer serving as the primary point of contact.

General Info

Burbank will enhance downtown pedestrian and bicycle networks using quick-build infrastructure improvements.

Agency

California → City of Burbank

Place of Performance

Third St., Providencia Ave., Angeleno Ave., and Orange Grove Ave., Burbank, CA, 91502

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Burbank
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Burbank
Office AddressN/A
Contacts
Kyle KramerAssociate Transportation Planner

Full Description

Show more
The Safer Downtown Burbank Mobility Network Improvement Project will connect and improve the bicycle network and pedestrian crossings along four streets in Downtown Burbank, adding 0.75 road miles of new bike facilities and upgrading safety elements on 1.6 road miles of existing bicycle facilities. The project will use signage, striping, plastic/rubber bollards, curbing, and other quick-build materials within the existing roadway; no physical construction is included. Specifically, the project will add painted Class II bike lanes on Orange Grove Ave. between Kenneth St. and Third St., on a one-block gap on Third St. between Bethany Dr. and Amherst Dr., and on the uphill/eastbound side of Providencia Ave. between Bonnywood Pl. and San Fernando Blvd. The project will modify existing striped Class II bike lanes to become Class IV bike lanes with vertical separation elements on Third St. between Burbank Blvd. and Verdugo Ave. and on Angeleno Ave. between Glenoaks Blvd. and First St. The project will create a Class III bicycle route on Third St. between Verdugo Ave. and Providencia Ave. and enhance a Class III bicycle route on Providencia Ave. between Glenoaks Blvd. and Bonnywood Pl. by adding wayfinding, red curb at stop signs, curb extensions, and centerline hardening. The project will also add signage, striping, and other traffic control devices in the existing right-of-way described above as needed to support the proposed bicycle and safety infrastructure.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. The project is located in California and encompasses a broad range of civil and infrastructure works. Key scopes of work include underground construction such as tunneling, boring, jacking, and micro tunneling; site preparation including land surveying, site clearing, shoring, and subgrade roadbed work; and environmental and support services including storm water pollution prevention (SWPPP), traffic control, and quality control. Required materials and services also include precast concrete, ready mix supply, cathodic protection, and the installation of traffic signs, signals, and lighting. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Additionally, bidders must demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237310
New
SLED
ADA Improvements at Cannonsburgh Village
Solicitation # ITB-10-2027
The City of Murfreesboro, Tennessee, is soliciting sealed bids for ADA Improvements at Cannonsburgh Village under solicitation number ITB-10-2027. The project scope involves establishing an accessible path from adjacent buildings to the visitors center toilets, which includes ramp modifications, hardscape improvements from the street to new accessible parking spaces, and minor interior toilet facility upgrades such as the installation of ADA grab bars and adjustments to fixtures and countertops. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of the base bid and accepted alternates. Bids must be submitted via the OpenGov portal by November 19, 2026, at 8:00 PM CST. Key contractual requirements include a 5% bid security, with performance and payment bonds required for 100% of the contract sum from a Tennessee-licensed bonding company. The contractor must submit an initial construction schedule within 21 days of the award and a quality-control plan within 10 days of the Notice to Proceed. Liquidated damages for failure to achieve substantial completion are set at 500 dollars per calendar day. Bidders must provide a lump sum base bid, a 5% contingency allowance, and unit pricing for the demolition and repouring of exposed aggregate concrete sidewalk. Required submission documents include a bid bond, a contractor responsibility questionnaire, and various certifications regarding Tennessee licensing, drug-free workplaces, and international divestment acts.
Parks and Recreation

POSTED

about 7 hours ago

DEADLINE

in 13 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS