Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Safety Improvements

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 8 is preparing to install centerline sinusoidal rumble strips along State Route 38 between Post Mile 49.5 and Post Mile 59.4 in Big Bear Lake, California, to enhance roadway safety by increasing driver alertness on this stretch of highway. The project is classified as a Class 1 Categorical Exemption under the California Environmental Quality Act, specifically 14 CCR §15301, which confirms that the work involves minor alterations to existing infrastructure with no significant environmental impact, thereby exempting it from a full environmental review. The scope of work is confined to the existing highway right-of-way and focuses solely on the placement of rumble strips without specifying technical standards for dimensions, materials, or installation density. The agency has identified the project as a forecast with no solicitation number, suggesting it is in a preliminary phase and not yet awarded, with no contract value estimated due to the absence of pricing data, CLINs, or quantity details. The place of performance is clearly defined, but no period of performance, delivery schedule, FOB terms, or invoicing methods are provided. The contracting authority is Caltrans, with primary point of contact Hannah Duarte, Senior Environmental Scientist, reachable via email and phone for inquiries. Administrative correspondence may be directed to Caltrans’ San Bernardino office at 464 W. 4th Street, though no Contracting Officer, COR, or COTR is named. No contract clauses, special requirements, evaluation factors, or offeror certifications are included in the available documentation, indicating this is an environmental notification and project forecast rather than a formal solicitation or contract. Attachment requirements are minimally outlined, mentioning the need for a certified exemption finding and notice of exemption, but no formal list of attachments, packaging standards, inspection criteria, or quality specifications are detailed. The project is being handled under Caltrans’ internal procedures without referencing federal acquisition regulations, MUTCD, or other technical standards, and no socioeconomic set-asides or small business considerations are indicated. All information suggests the initiative is an internally administered safety enhancement under state environmental compliance, with procurement activities yet to initiate formally.

General Info

Caltrans plans to install centerline rumble strips on SR-38 in Big Bear Lake for safety, exempt from environmental review.

Agency

California → Caltrans, District 8 - San Bernardino/Riverside

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Big Bear Lake, CA

Set-Aside

NONE

Documents

(1)

Caltrans Notice of Exemption for SR-38 Safety Improvements

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 8 - San Bernardino/Riverside
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 8 - San Bernardino/Riverside
Office AddressN/A
Contacts
Hannah DuarteSenior Environmental Scientist

Full Description

Show more
Install centerline sinusoidal rumble strips on State Route 38 (SR-38) between North Junction 18 Route Break (PM 49.5) and South Junction at Big Bear Dam (PM 59.4).

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will upgrade the entry and exit drives along 19th Avenue West, along with the former Downie Building (C-14) footprint and surrounding parking areas. Existing pavement in poor condition will be removed and replaced with new surfaces, while stormwater infrastructure will be fully renewed and expanded to divert runoff from the combined sewer system to dedicated storm lines, including water quality treatment features on qualifying pavement areas. The remaining slab from Phase 1 will be demolished to make way for a blend of new parking spaces and designated green areas designed as pollinator habitats, with an integrated stormwater treatment component. A new irrigation system will support the green spaces, and landscaping will be added to the reclaimed median within the entry drive. Electric vehicle charging stations will be installed in the updated parking area, and a protected two-way bike lane will connect the terminal entry to the existing West Wall bike path, enhancing nonmotorized access. Pedestrian routes will be improved to link with the intersection at 21st Avenue West and W Emerson Place, as well as the nearby King County Metro bus stop. New lighting will be installed throughout the parking area and connecting pathways to improve safety and visibility, and updated wayfinding signage will guide pedestrians and cyclists through the reconfigured site. The project is classified under NAICS code 237310 and is being managed by the Port of Seattle through Waterfront Project Management, with Mike Van Cleve and Terrence Moody serving as primary points of contact.
Waterfront Project Management

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
2026 ADA Pedestrian Ramp Retrofits Phase 1Hennepin County is seeking bids for the 2026 ADA Pedestrian Ramp Retrofits Phase 1 project, identified as CP 2201023 and State Aid Project SAP 027-070-010, with proposals due by 2:00 p.m. on August 11, 2026. The project encompasses ADA improvements across seven roadway segments—CSAH 4, CSAH 61, CSAH 66, CSAH 156, CSAH 159, and County Road 116—located in the cities of Corcoran, Eden Prairie, Golden Valley, Medina, Minnetonka, New Hope, Plymouth, and Rogers. Work includes assessment and modification of sidewalk layouts, ADA-compliant grading, concrete forming and finishing, paving of pedestrian crossings, placement of bituminous pedestrian facilities, and pavement markings, all in strict compliance with Public Right of Way Accessibility Guidelines (PROWAG) and MnDOT ADA Standards. Critical performance requirements mandate minimum 4-foot-wide pedestrian access routes with a maximum cross slope of 2.0%, vertical discontinuities under one-quarter inch, and landings of at least 4 feet by 4 feet with slopes no steeper than 2.0% in any direction. Ramps with longitudinal slopes between 5% and 8.3% require top landings, and all structural elements must adhere to referenced specifications including the 2025 Standard Specifications for Construction using English units. The solicitation is a one-step unsealing low-bid process, with award going to the lowest responsible bidder meeting all mandatory criteria. Bidders must submit electronically through Hennepin County’s ProcureWare platform, with hard copies explicitly prohibited. Mandatory submissions include a signed Responsible Contractor Verification and Certification, a Non-Collusion Affidavit, Attachment A-1 listing all first-tier subcontractors, and Attachment A-2 for additional subcontractors. All bids must include unit prices for every pay item; failure to provide a unit price for any item will result in bid rejection. Contractors must furnish performance and payment bonds equal to the full contract amount, and a bid bond of 5% of the total bid must be provided electronically via SurePath, Surety 2000, or uploaded as an electronic copy. The project requires strict adherence to Minnesota prevailing wage laws, prompt payment to subcontractors per Statute 471.
Hennepin County

POSTED

2 days ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
SLED
2026 Culvert Lining IDIQHennepin County is soliciting bids for a multi-year Indefinite Delivery Indefinite Quantity (IDIQ) contract for culvert lining under project number CP 1012266, titled 2026 Culvert Lining IDIQ, with the initial task order focused on culverts beneath the Dakota Rail Regional Trail in the City of Mound. The bid opening is scheduled for August 11, 2026, at 2:00 p.m., following a clarification deadline on August 4, 2026, and the solicitation was made available on July 18, 2026. Bids must be submitted electronically through the Hennepin County ProcureWare system, and all proposals are required to include a completed Planholder Checklist and an electronic bid bond via SurePath or Surety 2000, with the bond ID verified on the portal. The work is governed by the 2025 Edition of the Department of Transportation’s Standard Specifications for Construction using English units, along with attached Special Provisions, and must be performed in accordance with approved plans and specifications. The contract involves unit pricing submitted via an electronic bid schedule, with estimated quantities provided for culvert lining in sizes ranging from 12” to 36”, sediment control logs, site restoration, and traffic control elements, though final quantities are subject to adjustment under task orders issued during the contract period. The solicitation requires bidders to meet stringent compliance and administrative conditions, including the furnishing of both Payment and Performance Bonds equal to the contract amount as mandated by Minnesota Statute § 574.26, inclusion of costs for these bonds in the bid total, and adherence to Minnesota prevailing wage laws under the Department of Labor and Industry. Contractors must also submit an Affirmative Action Plan and a Small Business Enterprise (SBE)/Small Minority Business Enterprise (SMBE)/Small Women-Owned Business Enterprise (SWBE) Utilization Plan for any task order exceeding $100,000, both of which serve as mandatory pass/fail gates to contract award. Additional requirements include compliance with Minnesota Statute § 16C.285 regarding verification of first-tier subcontractors, a Non-Collusion Affidavit, Responsible Contractor Certification, and adherence to the County’s Equal Employment Opportunity and Anti-Harassment policies. Material marking standards are specified for liner tubes, flatplate samples, and environmental samples, with soil
Hennepin County

POSTED

2 days ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
International
Transportation and Economic Corridors - Invitation to Bid - TND0012201 - Hwy 2:36 - Grading, GBC, ACP, Street Light Installation, Construction of Structural Steel Girder Bridge, Construction of S.P.C.S.P. Culvert and Other WorkTender TND0012201 issued by Alberta Transportation and Economic Corridors for highway infrastructure works south of Morinville, Alberta, invites bids for a major transportation project involving grading, pavement construction, street lighting, bridge installation, and culvert systems. The project spans multiple components including the construction of a structural steel girder bridge over Highway 2 at the interchange with Cardiff Road/Twp. Rd. 554, the replacement of an existing culvert via a precast concrete segmental pipe system, and extensive roadway improvements over a 5-kilometre stretch from 5.100 km to 9.360 km north of Highway 642. Primary scope includes excavation of over 279,000 cubic metres of common material and 1.1 million cubic metres of borrow material, placement of 107,100 tonnes of granular base course, 57,000 tonnes of asphalt concrete pavement using EPS Mix Type H2, installation of 2,500 square metres of concrete medians, 1,320 metres of concrete curb, and 61 pre-cast street light bases with 51 full-height light standards. The bridge component requires supply and erection of 83 driven H-piles, placement of over 516 cubic metres of concrete class C and 652 cubic metres of high-performance concrete, structural steel fabrication and erection, waterproofing, deck joints, and bridge rail systems. Additional work includes trenching, cable installation, drainage troughs, guardrails, and a lump sum traffic signal system for the detour at the interchange. All materials must be supplied by the contractor, with work expected to be completed by August 31, 2029. The solicitation was posted on July 18, 2026, and closed on July 30, 2026, at 2:01 p.m. with submissions accepted exclusively via email to trans.tender@gov.ab.ca. Pre-tender meetings were held on June 10, 2026, via Microsoft Teams, with a second session still to be scheduled. Project inquiries are to be directed to Ikhtiyar Mammadov, Contracting Authority, via email at Ikhtiyar.Mammadov@gov.ab.ca. The project falls under NAICS code 237310 and is administered by the
Transportation and Economic Corridors

POSTED

2 days ago

DEADLINE

in 10 days
View Details