Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Florida was posted on June 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Safety Surfacing Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238320
New
SLED
Paint All Exterior and Common Area Doors, Buildings 4166, 4167, 4168 & 3673
Solicitation # N400857606105
Solicitation N400857606105 is for a project at MCAS Cherry Point, North Carolina, involving the cleaning, preparation, priming, and painting of approximately 800 exterior and common area doors, frames, vents, and louvers across Buildings 4166, 4167, 4168, 4169, and 3673. Additionally, the scope includes refinishing approximately 2,350 linear feet of handrails at Building 3673. The contractor must ensure a uniform, durable finish, with common area and storage doors painted on both sides and residential doors painted on the corridor-facing side only. All work must be completed within 180 calendar days after the award. The contract will be awarded based on the lowest price and is subject to the Davis-Bacon Act, with a minimum wage requirement of 13.65 per hour for covered workers through December 31, 2026. Bonding requirements vary by proposal value: no bonds for amounts 35,000 and less, a payment bond for amounts between 35,000 and 150,000, and a bid, payment, and performance bond for amounts exceeding 150,000. Proposals are due by September 18, 2026, at 1200 local time. The project requires a Quality Control Manager to oversee the work and ensure compliance with government standards, as any inadequate surface preparation or coating defects will be recoated at the contractor's expense.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The contract involves the installation of impact-absorbing surfacing around playground equipment, using materials such as poured-in-place rubber, rubber tiles, or engineered wood fiber. This work is essential for enhancing playground safety by providing cushioning to reduce injury risks from falls. The solicitation is designated as a subcontract opportunity and falls under the NAICS code 238320, which pertains to painting and wall covering contractors, suggesting a focus on site-specific installation expertise. Issued by the Florida School for the Deaf and the Blind, the contract was posted on June 1, 2026, with a response deadline set for June 4, 2026, indicating a short window for submission. Specific location details for performance are not provided, nor is there information on set-aside status or point of contact. Interested parties are directed to the vendor platform for further details. The scope emphasizes safety improvements in public facilities serving students with disabilities, requiring reliable and compliant execution of surfacing installation.

General Info

Installation of impact-absorbing playground surfacing to enhance safety, subcontract opportunity, deadline June 4.

Agency

Florida School for the Deaf and the BlindView Agency

NAICS

238320 - Painting and Wall Covering ContractorsView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of IA-26-149.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Intent to Award Single Source Provider to GameTime

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida School for the Deaf and the Blind
ContactsNo contacts available
OfficeN/A
Organization / Agency
Florida School for the Deaf and the Blind
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of impact-absorbing surfacing such as poured-in-place rubber, rubber tiles, or engineered wood fiber around playground equipment.

More opportunities from Florida School for the Deaf and the Blind

Same awarding agency

NAICS: 238350
SLED
PUBLIC ANNOUNCEMENT FOR SETTLES INTERIOR DOOR REPLACEMENT – ITB-27-026
Solicitation # ITB-27-026
The Florida School for the Deaf and the Blind (FSDB) is seeking competitive bids under solicitation ITB-27-026 for the removal and replacement of 59 interior door frames, doors, thresholds, and hardware at the Settles Gymnasium, building 17, located in St. Augustine, Florida. The selected contractor must provide all necessary equipment, labor, and materials, including the integration of new electronic access control hardware with FSDB security systems and coordination of electrical work with Honeywell International, Inc. The project requires a one-year installation warranty in addition to standard manufacturer warranties. Work must be performed during regular business hours, Monday through Friday, 7:00 AM to 4:00 PM, with a focus on minimizing disruptions to classroom and athletic functions. The contract will be awarded to the lowest responsive and responsible bidder. Interested firms must be properly licensed in the State of Florida and submit a complete sealed reply by September 30, 2026, at 1:45 PM. Submissions must include one original signed copy, five copies, and one electronic version on a USB thumb drive, along with mandatory documentation such as a bid bond, certificate of insurance, and various certification forms. The contract is non-renewable, and liquidated damages and travel reimbursements do not apply. Payment is contingent upon written acceptance of the work by the FSDB Contract Manager and is subject to annual legislative appropriation.
Finish Carpentry Contractors

POSTED

11 days ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS