Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on August 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Salt Lake City Airport Baggage Storage Office (BSO) Expansion, Security Checkpoint Demo & Expansion, Escalator & Stairs Terminal Level 1 to Level 2

Closed
SLCDA-DCM-542703, 542704, 542705State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
26-10026-000 BLDG 536, ROOMS 42 & 43 CONVERSION, PROJECT# A24-00043
Solicitation # A24-00043
The California Department of State Hospitals is soliciting lump sum bids for Project A24-00043, which involves the conversion of Rooms 41 and 43 in Building 536 at the Atascadero facility. The scope of work includes architectural demolition and renovation to support Physical Therapy and ECT services, mechanical airflow re-balancing and duct installation, and plumbing updates including the installation of five sinks. The project requires adherence to Title 24 electrical standards, Office of the State Fire Marshal approval, and General Prevailing Wage Rates. Physical construction must commence within 10 calendar days of the Notice to Proceed, with specific timeframes allocated for startup, testing, commissioning, and the completion of punch list items. The contract will be awarded based on the lowest adjusted bid price, with significant preferences given to certified Small Businesses and Disabled Veteran Business Enterprises. Bidders must provide a bid security of at least 10 percent of the bid and furnish performance and payment bonds totaling 100 percent of the contract price upon selection. All bids must be submitted under sealed cover using the official Bid Form and must be submitted under the bidder's licensed name. The contractor is responsible for strict waste management to divert debris from landfills and must comply with California Code of Regulations regarding maximum allowable VOC levels for cleaning products. Personnel are required to obtain security clearance to work on-site.
California Department of State Hospitals

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes modernizing classrooms and corridors by replacing flooring with LVP and carpet tiles, updating electrical distribution with raised flooring and dimming controls, and fully renovating restrooms. Additionally, the project requires replacing variable air volume systems, upgrading lighting and life-safety components, and repainting interior surfaces. The period of performance is scheduled from January 11, 2027, to March 11, 2028, totaling 425 calendar days. Award will be determined using a best suited then negotiate methodology, evaluating past performance, corporate relevant experience, and price with equal importance. Offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Due to the nature of the facility, personnel must undergo background checks and adhere to strict security and safety protocols, including the FLETC Hazardous Waste Management Plan and ADA accessibility guidelines. Proposals are due by November 18, 2026, and must include a detailed cost breakdown via Exhibit A.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year warranty, and exterior wall system updates. Interior improvements involve reconfiguration, new finishes such as epoxy mortar flooring, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the project requires the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, alongside site improvements including paving, drainage upgrades, and hazardous materials abatement. The project has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Bidders must provide pricing for two specific exhibit line items: building renovation and paving removal and replacement. The award will be based on the lowest price. Key administrative requirements include compliance with the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds. Invoicing is conducted monthly via Wide Area Work Flow (WAWF) using NAVFAC Form 7300/30 and must be certified by a Quality Control Manager.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 25 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, seeks Disadvantaged Business Enterprise (DBE) subcontractors under NAICS code 236220. The solicitation was posted on October 29, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements to secure project financing. Bidders must demonstrate comprehensive outreach, including posting solicitations in an online publication for at least 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency. Failure to include proof of these postings and agency utilization within the bid package will result in the proposal being deemed non-responsive. While most GFE documentation is due at the time of submission, outreach logs and documentation may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 5 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations and improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders are requested to provide pricing for a wide array of trades, ranging from demolition and abatement to specialized mechanical, electrical, and plumbing services. All work must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Interested parties must contact the primary point of contact to receive the full bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with the National Building Code, NFPA-101 Life Safety Code, ADA, OSHA, and EPA regulations, with Massachusetts state laws prevailing if they are more stringent than federal requirements. The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion, with work starting within 14 days of the Notice to Proceed. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and certification of compliance with local wage rate decisions. The contract mandates Net 30 payment terms and requires a one-year workmanship guarantee.
Grafton Job Corps

POSTED

about 5 hours ago

DEADLINE

in 18 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes the installation of drywall, joint finishing, and painting for approximately 300 square feet of floor area, along with the temporary disconnection and re-installation of HVAC equipment, furnaces, and water heaters. The contractor is responsible for maintaining fire resistance and ensuring all mechanical, plumbing, electrical, and life-safety systems are tested and approved prior to final acceptance by CSD. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100. Awarded contractors must provide payment and performance bonds for the full project value, as well as proof of general liability and worker's compensation insurance, within ten days of award. A minimum one-year workmanship warranty is required upon final acceptance.
Career Systems Development Corporation

POSTED

about 5 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. Site preparation involves clearing, rock excavation, and grading, with specific requirements for wetland mitigation. Additionally, the project includes the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari for bid documents.
J & J Contractors, Inc

POSTED

about 5 hours ago

DEADLINE

in about 21 hours

AI Contract Overview

Show more

The contract encompasses three major construction phases at the Salt Lake City Airport, aimed at enhancing security, operational efficiency, and passenger flow. The first phase involves expanding the TSA security checkpoint eastward, which requires demolishing an existing restroom and baggage storage offices, followed by new construction including drywall, ceiling systems, fire alarm and suppression, terrazzo flooring, doors, mechanical electrical plumbing, cameras, a public address system, and updated signage. The second phase adds five new baggage storage offices at the southwest corner of the terminal, each designed to replicate the layout and finishes of the existing offices in the southeast corner, featuring a reception area and secure storage space. The third phase relocates and upgrades vertical circulation between Terminal Level 1 and Level 2 by installing a second 32-inch escalator in place of existing stairs, relocating those stairs above the Sally Port, and modifying that structure; this scope also includes comprehensive demolition and new construction of flooring, walls, ceilings, MEP systems, fire protection, lighting, and the relocation of a major cable tray to accommodate the changes. The solicitation, identified by numbers SLCDA-DCM-542703, 542704, and 542705, was posted on August 3, 2026, with a response deadline of August 27, 2026, and is managed by the Utah agency. All work is to be performed at the Salt Lake City Airport in Utah, with no set-aside classification specified. The project demands precise coordination across multiple trades and systems to ensure minimal disruption to airport operations while meeting stringent safety and operational standards. The scope reflects a commitment to modernizing critical infrastructure, improving passenger experience, and aligning facility capacity with current and projected demand.

General Info

Expand TSA checkpoint, add baggage offices, upgrade escalators and MEP systems at Salt Lake City Airport.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

6

BSO Expansion Drawings - Salt Lake City International Airport

PDF, High priority: read this firstdrawings
High

BSO Expansion, SSCP, ESC-STR Project Manual Contract CA-008527

PDF, High priority: read this firstcontract-document
High

Salt Lake City Airport Terminal Escalator & Stairs Addition Drawings

PDF, High priority: read this firstdesign-drawings
High

Salt Lake City International Airport Construction Safety and Security Compliance Manual March 2018

PDF, High priority: read this firstsow
High

Salt Lake City International Airport Terminal Level 2 Security Checkpoint & Restroom Remodel Drawings

PDF, High priority: read this firstdrawings
High

Pre-Bid Attendance Log - SLCDA CIP Terminal Projects

PDF, Low priorityattendance-log
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
ContactsNo contact information available

Interested Companies (51)

MortensonTempe, AZ
Gov AlphaBrooklyn, New York
ConstructConnectCincinnati, OH

See All 51 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
This project consists of three different phases of work that include: a. Security Checkpoint Demo & Expansion: This project expands the TSA queue lanes eastward requiring demolition of existing restroom and baggage storage offices (BSO). Work includes the following new work items: drywall, ceiling, fire alarm and suppressions, terrazzo, doors, MEP, cameras, PA system, and signage. b. Baggage Storage Office (BSO) Expansion: This project includes construction of 5 new baggage storage offices (BSO) located at the southwest corner of the terminal building. Each office includes a reception area and storage area and would be built to closely match the BSO offices at the southeast corner. c. Escalator & Stairs Terminal Level 1 to Level 2: This project will install a second 32” escalator from the Level 1 checkpoint up to Level 2. This new escalator will be installed where the existing stairs are, adjacent to the existing escalator. The existing stairs will be relocated to be above the existing Sally Port, which will also be modified. Work includes demo and new construction for flooring, ceiling, walls, MEP, fire system, and lighting. The work also requires relocation of a major cable tray.

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

3 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS