Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

San Bernardino Avenue Widening Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Bernardino Avenue Widening Project, managed by the San Bernardino County Department of Public Works, involves the full-depth reconstruction and widening of approximately 1.25 miles of roadway from Cherry Avenue east to Fontana Avenue in the City of Fontana. The project will establish an 80-foot curb separation, featuring excavation depths of up to 1.35 feet for the road surface and 4 feet for drainage structures. Key deliverables include pulverizing asphalt, cold planing, and the installation of ADA-compliant concrete ramps, driveways, curbs, gutters, sidewalks, and spandrels. Additionally, the scope encompasses the relocation of traffic signals at five key intersections, the reconstruction of drainage facilities, and the installation of three concrete bus stop pads. The project requires significant site preparation and utility coordination, including the removal of approximately 35 mature trees and the demolition of three residential structures and one storage building to accommodate easement acquisitions across 54 parcels. Utility work involves relocating Southern California Edison power poles, A&T poles, fire hydrants, and various water and gas meters. Construction is anticipated to begin in spring 2027 with an estimated duration of 90 days. The project is environmentally cleared under California Environmental Quality Act sections 15301, 15302, and 15303, as it consists of minor alterations and replacements within existing right-of-ways without increasing traffic capacity.

General Info

San Bernardino County will widen 1.25 miles of roadway in Fontana starting spring 2027.

Agency

California → San Bernardino County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

San Bernardino Avenue, extending from Cherry Avenue east to Fontana Avenue, San Bernardino, CA

Set-Aside

NONE

Documents

(1)

NOE San Bernardino Avenue Widening Project H14750

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Bernardino County
Office AddressN/A
Contacts

Full Description

Show more
The San Bernardino County Department of Public Works (DPW) proposes the full-depth reconstruction and widening of approximately 1.25 miles of San Bernardino Avenue, extending from Cherry Avenue east to Fontana Avenue in the City of Fontana. The roadway will be reconstructed to an 80-foot curb separation, with a maximum excavation depth of 1.35 feet for the road surface and approximately 4 feet for drainage structures. Improvements include pulverizing asphalt and cold planing, installing ADA-compliant concrete ramps and driveway approaches, placing asphalt concrete driveways and asphalt dike, and constructing concrete curb, gutter, sidewalks, spandrels, and cross gutters at multiple locations. The project also includes relocation of fencing and block walls, as well as traffic signal relocations at Cherry Avenue, Redwood Avenue, Live Oak Avenue. Hemlock Avenue. and Fontana Avenue. Drainage facilities will be reconstructed east of Cherry Avenue, east of Live Oak Avenue, and west of Fontana Avenue. Additional work consists of constructing three concrete bus stop pads, removing approximately 35 mature trees and stumps, and demolishing three residential structures and one storage building to accommodate easement acquisitions.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS