San Bernardino Valley College Master Plan-Stadium Expansion

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The proposed project at San Bernardino Valley College involves the construction of a new 12,000 gross square foot welding building to modernize Career Technical Education programs as part of the college’s broader Career Pathways initiative. The facility will provide expanded, safety-compliant instructional and fabrication labs with approximately 6,800 assignable square feet, including classrooms, storage, and an exterior canopy that links to the existing East Wing welding building. The new structure supports the growing demand for welding instruction and contributes to improved energy performance and student learning environments. The project also includes infrastructure upgrades such as new storm drains, water, gas, sewer, and telecommunication lines connected to existing campus systems, along with improvements to College Drive like repaved asphalt and concrete surfaces, additional parking, and landscape enhancements. The building expansion increases the campus’s total square footage by about 1.5 percent, aligning with the 2017 Master Plan projections for growth through 2031. San Bernardino Valley College, part of the San Bernardino Community College District, has undergone extensive planning and environmental review due to seismic hazards from the San Jacinto fault, prompting earlier replacements of at-risk structures. The 2008 Measure M bond funded the creation of the 2010 Master Plan, which was certified under CEQA with a Statement of Overriding Considerations to justify unavoidable environmental impacts, including effects on historical resources, noise, and traffic. Subsequent amendments to the plan, including a stadium expansion to 4,000 seats and an EIR Addendum in 2017, ensured continued compliance with environmental regulations. The latest proposed welding building is covered under a 2020 EIR Addendum addressing modifications to Career Pathway 2, with environmental analysis confirming alignment with prior certifications. Funding for this initiative is enabled by Measure CC, a $470 million bond passed by San Bernardino County voters in 2018 to support campus modernization, with the project managed under the oversight of the San Bernardino Community College District and led by Design Program Manager Sosseh Taimoorian.

General Info

San Bernardino Valley College builds 12,000 sq ft welding facility funded by Measure CC to modernize Career Technical Education.

Agency

California → San Bernardino Community College District

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Esperanza Street, K Street, San Bernardino, CA, 92410

Set-Aside

NONE

Documents

(1)

SBVC CP2 Welding Building Project Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino Community College District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Bernardino Community College District
Office AddressN/A
Contacts
Sosseh TaimoorianDesign Program Manager

Full Description

Show more
The Proposed Project includes construction of a new welding building as part of the SBVC Career Pathways modernization program. The new welding building would support the college’s Career Technical Education programs with modern instructional and safety-compliant laboratories, improving energy performance, and enhancing student learning environments. The new facility would support the growing welding program that currently exists at SBVC by expanding upon existing welding instruction space in the East Wing building in the northeast area of the campus (SBCCD 2025). At approximately 12,000 gross square feet (GSF) and 6,800 assignable square feet (ASF), the building would include classrooms, lab/ fabrication space, exterior canopy, and storage. The current East Wing welding building would remain in place and connect to the new building through an outdoor canopy area. The 2017 Master Plan estimated 451,387 ASF of building space across the campus at buildout (SBCCD 2017). The Proposed Project would increase that square footage estimate by approximately 1.5 percent. The Project includes new storm drains, water, gas, sewer, and telecommunication lines that would connect to existing infrastructure in the Project vicinity. The Project also includes improvements to College Drive including new asphalt, concrete paving, parking spaces, and landscaping. San Bernardino Valley College (SBVC) was established in the 1920s and is part of the San Bernardino Community College District (SBCCD). SBVC currently serves the West Valley area of SBCCD. In 1996, as a result of the 1992 Landers and Big Bear earthquakes, SBC CD began investigations to locate the San Jacinto fault on the campus. As a result of the seismic hazard assessment conducted in 1996, building replacement projects were completed at the campus to replace buildings located within 50 feet of the fault zone, or within the folding zone, an area of uneven elevation changes during a seismic''· event. Measure M, a $500 million bond measure, was passed in February 2008. This bond measure allowed SBCCD to complete a campus Master Plan at SBVC and to provide funding for the design and construction of new facilities to implement the Master Plan. A Master Plan for SBVC was completed in 2010 to account for the various academic buildings, infrastructure improvements, and associated parking required to meet the planning challenges related to the fault and folding zone and to support an estimated future enrollment of 17,000 total students by 2030. A California Environmental Quality Act (CEQA) Program Environmental Impact Report (PEIR) was prepared for the SBVC Master Plan which evaluated the environmental effects of buildout of the campus under the Master Plan. The SBC CD Board of Trustees certified the PEIR in April 2010. When the PEIR was certified, a Statement of Overriding Considerations was adopted for significant, unavoidable adverse effects to historical resources, noise, and traffic in accordance with CEQA Guidelines Section 15093. Specifically, the SBCCD Board of Trustees found that the benefits of the expansion of SBVC had sufficient benefit to override the unavoidable significant adverse impacts. After approval of the SBVC Master Plan and PEIR, a new stadium design was proposed that included an increase from 2,250 seats proposed in the 2010 Master Plan to 4,000 seats. After review, it was determined that this new stadium design could result in new or more severe impacts that were not discussed in the certified PEIR. A Supplemental EIR (SEIR) was prepared for the stadium expansion, which included updated studies for traffic and air quality/greenhouse gases. The SEIR was certified by the SBCCD Board of Trustees on July 11, 2013. In 2017, the SBCCD prepared an update to the Master Plan, which plans for campus growth through the buildout year of 2031. In 2018, San Bernardino County voters passed Measure CC, a $470 million bond measure to provide funding for improvement projects at SBCCD facilities, including the projects in the 2017 Master Plan. In 2019, an EIR Addendum was prepared that provided environmental analysis of the 2017 Master Plan update. In 2020, an EIR Addendum was prepared that analyzed changes proposed to Career Pathways 1 and 2 involving minor changes in building location and configuration. Since that time, changes have been proposed to Career Pathway 2 facilities that would involve construction of a new welding building. This EIR Addendum provides an environmental analysis of the proposed changes.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Enlisted Unaccompanied Personnel Housing at Eglin AFB, FL
Solicitation # enlisted-unaccompanied-personnel-housing-eglin-afb-fl
The contract solicits the construction of two two-story enlisted unaccompanied personnel housing barracks at Eglin Air Force Base in Florida, each designed to accommodate 120 personnel across 32 individual units. Each unit is equipped with a kitchen, dining area, living area, and laundry room, while the buildings include shared amenities such as lobbies, elevators, entrance vestibules, exercise rooms, day rooms, lounges, and dedicated mechanical, electrical, and communications spaces. The project extends beyond the structures to encompass comprehensive site development, including parking facilities for vehicles and motorcycles, a large open pavilion, basketball and volleyball courts, concrete sidewalks, roadways, grading, storm sewer systems, utilities, landscaping, and related incidental work. All construction activities must comply with a broad range of trade scopes including demolition, sitework, concrete, masonry, steel, millwork, insulation, roofing, waterproofing, doors and hardware, glass and glazing, drywall, flooring, paint, elevators, plumbing, HVAC, fire protection, electrical systems, fencing, asphalt paving, and landscaping. The solicitation is issued by Roy Anderson Corp as the general contractor and is targeted exclusively toward small businesses, with set-asides available for Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business entities. Subcontractors from Minority Business Enterprises, Disadvantaged Business Enterprises, Women’s Business Enterprises, and other certified categories are encouraged to participate. The contract incorporates mandatory equal employment opportunity requirements under Executive Order 11246, Section 503 of the Rehabilitation Act of 1973, and the Vietnam Era Veterans’ Readjustment Assistance Act of 1974, ensuring compliance with affirmative action and non-discrimination standards as defined in 41 CFR 60-4. Proposals must be submitted by Tuesday, August 18, 2026, at 1:00 PM Central Time, with interested bidders required to notify the point of contact, Patrice Lindman, via email or fax to confirm intent to bid. No contract value, pricing structure, period of performance, or bonding requirements are specified in the solicitation materials, and the award will be based on submissions from qualified small business entities meeting the stated technical and compliance criteria.
Roy Anderson Corp

POSTED

about 6 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
RFO AWP-1072, IIJA: ZUA CCF Environmental Wing and Underground Utilities, Hagatna, GU
Solicitation # rfo-awp-1072-iija-zua-ccf-environmental-wing-underground-utilities-hagatna-gu
The contract pertains to the construction of a new Environmental Wing and associated underground utility improvements at a facility in Hagatna, Guam, with a construction value exceeding $10 million. The project includes the demolition of existing structures, comprehensive upgrades to the building’s electrical and HVAC systems, and significant underground utility enhancements. The work is classified under multiple NAICS codes including 236220, 236210, 237990, and 238110, reflecting the broad scope of construction activities involved. This solicitation is set aside for small business concerns including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned Small Businesses, as well as Alaskan Native Corporations. Interested firms must respond to the solicitation by the deadline of August 27, 2026, and should contact Anna Ma, Subcontract Administrator at Parsons, via email at anna.t-ctr.ma@faa.gov to express confirmed interest. The solicitation, identified as RFO AWP-1072, IIJA: ZUA CCF Environmental Wing and Underground Utilities, was posted on August 7, 2026, under the PTSI Managed Services, Inc. agency. The project’s location is exclusively in Guam, and all responses must align with the Small Business Administration’s set-aside requirements. No physical office address is listed, and inquiries should be directed through the provided point of contact.
PTSI Managed Services, Inc.

POSTED

about 6 hours ago

DEADLINE

in 19 days
View Details
NAICS: 236220
New
Windsor SECONDARY TREATMENT SYSTEM UPGRADES PROJECT
Solicitation # windsor-secondary-treatment-system-upgrades-project-0
The Windsor Secondary Treatment System Upgrades Project involves a major expansion and modernization of the Water Reclamation Facility’s aeration basin, requiring complete dewatering, extensive excavation, and the construction of a new concrete aeration basin equipped with a flow splitting structure, air lines, diffusers, a mixing system, surface wasting pumps, and a high flow return pump connected to an adjacent storage pond. Parallel to this, a new blower building with integrated blowers and a dedicated electrical control building will be erected, alongside a separate carbon feed building housing chemical storage tanks and metering pumps. Additional scope includes a below grade secondary clarifier weir flow splitting structure and the relocation of an existing concrete sand filter high flow diversion structure. The project is scheduled to span 482 working days with defined intermediate milestones to ensure progress tracking. The project is funded in whole or part through the U.S. Environmental Protection Agency’s WIFIA program, triggering specific compliance requirements under Section 9 of the Special Provisions that contractors and subcontractors must adhere to. Preference is actively encouraged for participation by Disadvantaged Business Enterprises including DBE, DVBE, MBE, WBE, and SBE, aligning with the SBA’s small business set-aside categories such as Small Business, Small Disadvantaged Business, Women-Owned Small Business, and Minority and Women Business Enterprises certified through NMSDC or similar programs. The solicitation was posted on August 7, 2026, with a response deadline of September 3, 2026, and although the pre-bid conference occurred on January 14, 2026, contract documents are accessible online through BuildingConnected and the Town of Windsor’s official bids portal after completing a brief registration form. The contracting entity is C. Overaa & Co., with Anna Stein listed as the primary point of contact for inquiries.
C. Overaa & Co.

POSTED

about 6 hours ago

DEADLINE

in 26 days
View Details
NAICS: 236220
New
Vehicle Maintenance Shop #71 Fort Hood, Texas
Solicitation # vehicle-maintenance-shop-71-fort-hood-texas
Cerris Builders, INC is soliciting bids for the construction of Vehicle Maintenance Shop #71 at Fort Hood, Texas, with a focus on delivering a fully equipped facility to support military vehicle maintenance and operational readiness. The project encompasses a large-scale maintenance facility designed for tactical and organizational vehicles, along with dedicated spaces for UAV storage and maintenance, petroleum and hazardous material handling, and comprehensive storage solutions. The scope further includes critical infrastructure such as fire protection and alarm systems, intrusion detection systems, and an Energy Monitoring Control System to ensure safety, security, and operational efficiency. Supporting site improvements are required, including utilities, storm drainage, paved surfaces, sidewalks, lighting, signage, fencing, and landscaping to complete the site to full operational standards. The solicitation is set aside exclusively for small business concerns, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned Small Businesses, reflecting a commitment to fostering diverse contracting opportunities. The response deadline for submissions is August 11, 2026, with Drake Martin serving as the primary point of contact for inquiries.
Cerris Builders, INC

POSTED

about 6 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
SLED
Construction Manager at Risk for New Precinct 4 Maintenance Center
Solicitation # F2027007
Tarrant County is soliciting proposals for a Construction Manager at Risk (CMAR) to manage the construction of the New Precinct 4 Maintenance Center at 1005 Scotland Avenue in Azle, Texas. The project involves building an Administration Building, Maintenance Building, Fleet Building, Covered Storage, Fuel Island, and Covered Parking Areas, with the selected CMAR assuming full risk for construction costs and timelines while acting as the general contractor. The CMAR will provide expert consultation during design adjustments and throughout construction, ensuring compliance with all technical specifications and legal requirements. The selection will occur through a one-step process, emphasizing both technical capability and cost competitiveness. The technical design and engineering for the project are led by Parkhill for architectural, landscape, structural, MEP, and interior design, with McAdams handling civil engineering, WJHW, Inc. for audio/video systems, and Datacom Design Group for IT and security infrastructure. Proposals must be submitted by September 17, 2026, following the solicitation issued on August 7, 2026 under reference number F2027007 and classified under NAICS code 236220. Interested firms should review all documents under the “Attachments” tab and attend the Pre-Proposal Conference and Site-Walks listed under the “Activities” tab. Direct questions to Gwen Peterson, Senior Buyer, at gpeterson@tarrantcountytx.gov or 817-884-1145.
Tarrant County

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
SLED
Rail RFI Engine House Construction
Solicitation # BD-27-1030-0T100-0T281-132125
The Massachusetts Department of Transportation Rail and Transit Division is seeking industry input through a Request for Information to inform the future procurement process for constructing the Hyannis Engine House. This solicitation, identified as BD-27-1030-0T100-0T281-132125, was posted on August 7, 2026, with responses due by August 25, 2026, and is aimed at gathering technical expertise and market feedback from qualified vendors to shape the scope, requirements, and approach of a potential upcoming bid. While no specific set-aside or NAICS code is currently defined, the initiative is classified under state and local government procurement and is managed by the MassDOT Rail and Transit Division based in Boston, Massachusetts. The primary point of contact for this RFI is Monica Auguste, designated as the Purchaser, and all submissions must be directed through the official CommBuy portal linked in the notice. The place of performance for the eventual construction is expected to be in Hyannis, though the agency’s administrative address for this solicitation is listed as Park Plaza in Boston, with a zip code of 02116. This RFI does not constitute a commitment to procure but is a critical step in gathering insights to ensure the future solicitation aligns with current industry capabilities, technologies, and best practices for rail infrastructure development.
0T100 - RAIL AND TRANSIT

POSTED

about 9 hours ago

DEADLINE

in 18 days
View Details
NAICS: 236220
New
Federal
Z1DA--| SOL| NRM| 646-21-101 UD SPS AHU & RO Upgrade Construction (VA-26-00036217)
Solicitation # 36C24426R0139
This is an unrestricted construction solicitation under FAR Subpart 15 for the UD B1 SPS AHU & RO Upgrade project at a Department of Veterans Affairs facility in Pittsburgh, Pennsylvania, with a NAICS code of 236220 and an estimated value between $10 million and $20 million. The scope includes comprehensive architectural and engineering services to upgrade air handling and reverse osmosis systems, overhaul backup power infrastructure, remove ethylene oxide abator equipment, add a second cart wash, separate SPS and SPD operational spaces, install visible and audible alerts, renovate finishes and lighting, reinforce and lower slabs under cart washers, and develop satellite SPS spaces on upper floors. All work must comply with VA Handbook 7610, the VAPHS Master Space Plan, The Joint Commission standards, ANSI/AAMI ST79:2017, AAMI TIR34:2014(R)2017, and ANSI/AAMI ST91:2021 for endoscope processing, while adhering to ADA accessibility requirements. The period of performance is 720 calendar days from receipt of the Notice to Proceed. The contract enforces strict compliance with technical and administrative requirements, including mandatory pre-approval of all equipment and materials by the Government prior to delivery, with all items to be delivered and stored in original sealed manufacturer packaging clearly labeled with OEM name, model, catalog, and serial numbers. Packaging must protect against damage, moisture, dirt, cold, and rain, and specialty items like paints and coatings must include batch numbers, safety instructions, and federal specification numbers. Submittals must follow the exact sequence of the specifications, and offerors must submit a point-by-point compliance statement indicating “DOES NOT COMPLY” or “COMPARABLE” with full descriptions for alternatives; failure to do so will result in disqualification. Payment is governed by FAR 52.232-5, requiring monthly AIA G702 and G703 forms, a satisfactory progress schedule update, and electronic submission via the VAFSC Tungsten Network after CO and COR signature. The contractor must maintain a full-time CQC team on-site and provide a Safety and Occupational Health program aligned with USACE EM 385-1-1 and OSHA regulations, including designated Safety and Health Managers, Site Safety and Health Officers, and specialized Competent Persons for high-risk activities. All personnel require VA pre-approval
244-NETWORK Contract Office 4 (36C244)

POSTED

about 10 hours ago

DEADLINE

in 20 days
View Details