Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

San Bernardino Valley College Master Plan-Stadium Expansion

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The proposed project at San Bernardino Valley College involves the construction of a new 12,000 gross square foot welding building to modernize Career Technical Education programs as part of the college’s broader Career Pathways initiative. The facility will provide expanded, safety-compliant instructional and fabrication labs with approximately 6,800 assignable square feet, including classrooms, storage, and an exterior canopy that links to the existing East Wing welding building. The new structure supports the growing demand for welding instruction and contributes to improved energy performance and student learning environments. The project also includes infrastructure upgrades such as new storm drains, water, gas, sewer, and telecommunication lines connected to existing campus systems, along with improvements to College Drive like repaved asphalt and concrete surfaces, additional parking, and landscape enhancements. The building expansion increases the campus’s total square footage by about 1.5 percent, aligning with the 2017 Master Plan projections for growth through 2031. San Bernardino Valley College, part of the San Bernardino Community College District, has undergone extensive planning and environmental review due to seismic hazards from the San Jacinto fault, prompting earlier replacements of at-risk structures. The 2008 Measure M bond funded the creation of the 2010 Master Plan, which was certified under CEQA with a Statement of Overriding Considerations to justify unavoidable environmental impacts, including effects on historical resources, noise, and traffic. Subsequent amendments to the plan, including a stadium expansion to 4,000 seats and an EIR Addendum in 2017, ensured continued compliance with environmental regulations. The latest proposed welding building is covered under a 2020 EIR Addendum addressing modifications to Career Pathway 2, with environmental analysis confirming alignment with prior certifications. Funding for this initiative is enabled by Measure CC, a $470 million bond passed by San Bernardino County voters in 2018 to support campus modernization, with the project managed under the oversight of the San Bernardino Community College District and led by Design Program Manager Sosseh Taimoorian.

General Info

San Bernardino Valley College builds 12,000 sq ft welding facility funded by Measure CC to modernize Career Technical Education.

Agency

California → San Bernardino Community College District

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Esperanza Street, K Street, San Bernardino, CA, 92410

Set-Aside

NONE

Documents

(1)

SBVC CP2 Welding Building Project Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino Community College District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Bernardino Community College District
Office AddressN/A
Contacts
Sosseh TaimoorianDesign Program Manager

Full Description

Show more
The Proposed Project includes construction of a new welding building as part of the SBVC Career Pathways modernization program. The new welding building would support the college’s Career Technical Education programs with modern instructional and safety-compliant laboratories, improving energy performance, and enhancing student learning environments. The new facility would support the growing welding program that currently exists at SBVC by expanding upon existing welding instruction space in the East Wing building in the northeast area of the campus (SBCCD 2025). At approximately 12,000 gross square feet (GSF) and 6,800 assignable square feet (ASF), the building would include classrooms, lab/ fabrication space, exterior canopy, and storage. The current East Wing welding building would remain in place and connect to the new building through an outdoor canopy area. The 2017 Master Plan estimated 451,387 ASF of building space across the campus at buildout (SBCCD 2017). The Proposed Project would increase that square footage estimate by approximately 1.5 percent. The Project includes new storm drains, water, gas, sewer, and telecommunication lines that would connect to existing infrastructure in the Project vicinity. The Project also includes improvements to College Drive including new asphalt, concrete paving, parking spaces, and landscaping. San Bernardino Valley College (SBVC) was established in the 1920s and is part of the San Bernardino Community College District (SBCCD). SBVC currently serves the West Valley area of SBCCD. In 1996, as a result of the 1992 Landers and Big Bear earthquakes, SBC CD began investigations to locate the San Jacinto fault on the campus. As a result of the seismic hazard assessment conducted in 1996, building replacement projects were completed at the campus to replace buildings located within 50 feet of the fault zone, or within the folding zone, an area of uneven elevation changes during a seismic''· event. Measure M, a $500 million bond measure, was passed in February 2008. This bond measure allowed SBCCD to complete a campus Master Plan at SBVC and to provide funding for the design and construction of new facilities to implement the Master Plan. A Master Plan for SBVC was completed in 2010 to account for the various academic buildings, infrastructure improvements, and associated parking required to meet the planning challenges related to the fault and folding zone and to support an estimated future enrollment of 17,000 total students by 2030. A California Environmental Quality Act (CEQA) Program Environmental Impact Report (PEIR) was prepared for the SBVC Master Plan which evaluated the environmental effects of buildout of the campus under the Master Plan. The SBC CD Board of Trustees certified the PEIR in April 2010. When the PEIR was certified, a Statement of Overriding Considerations was adopted for significant, unavoidable adverse effects to historical resources, noise, and traffic in accordance with CEQA Guidelines Section 15093. Specifically, the SBCCD Board of Trustees found that the benefits of the expansion of SBVC had sufficient benefit to override the unavoidable significant adverse impacts. After approval of the SBVC Master Plan and PEIR, a new stadium design was proposed that included an increase from 2,250 seats proposed in the 2010 Master Plan to 4,000 seats. After review, it was determined that this new stadium design could result in new or more severe impacts that were not discussed in the certified PEIR. A Supplemental EIR (SEIR) was prepared for the stadium expansion, which included updated studies for traffic and air quality/greenhouse gases. The SEIR was certified by the SBCCD Board of Trustees on July 11, 2013. In 2017, the SBCCD prepared an update to the Master Plan, which plans for campus growth through the buildout year of 2031. In 2018, San Bernardino County voters passed Measure CC, a $470 million bond measure to provide funding for improvement projects at SBCCD facilities, including the projects in the 2017 Master Plan. In 2019, an EIR Addendum was prepared that provided environmental analysis of the 2017 Master Plan update. In 2020, an EIR Addendum was prepared that analyzed changes proposed to Career Pathways 1 and 2 involving minor changes in building location and configuration. Since that time, changes have been proposed to Career Pathway 2 facilities that would involve construction of a new welding building. This EIR Addendum provides an environmental analysis of the proposed changes.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for Government Furnish, Government Installed equipment, classrooms, debriefing areas, administrative offices, and various support spaces such as electrical, mechanical, and telecommunications rooms. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a period of performance of 719 calendar days from award. The procurement utilizes a best-value tradeoff selection process, weighing price against non-price factors including planning, organization, communication, and the proposed construction approach. Technical requirements specify the use of Siemens Building Automation Systems for installation-wide compatibility and adherence to UFC 4-010-06 cybersecurity standards. All on-site personnel must be US citizens, and security clearance is managed via RAPIDGate. The project is subject to Davis-Bacon Act wage determinations for building and heavy construction in Pasquotank County. Quality control is mandated per FAR 52.246-12, with specific ASTM standards required for the testing of concrete, soil, and structural steel.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Both structures will feature shallow foundations, structural steel framing, standing-seam roofs, and a combination of masonry and metal panel exterior walls. The scope of work is extensive, covering everything from demolition of an existing engineering facility to comprehensive site improvements, including stormwater retention, utilities, landscaping, and parking. Bids are requested across numerous trades, including concrete, masonry, electrical, mechanical, plumbing, and structural steel. The project adheres to Davis Bacon Wage Rates and is exempt from sales tax. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in 2 months
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the construction of the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base New London in Groton, Connecticut. The project involves a comprehensive scope of work over 1828 calendar days, including the construction of six Containerized Long Weapons Storage units and three earth-covered high-explosive magazines equipped with overhead cranes. Additional structures include a new Ordnance Operations building, a Truck Inspection area, and a Sentry building. The project also requires the demolition of 18 existing magazines and two specific buildings, along with extensive site preparation involving rock excavation, grading, and wetland mitigation. Technical requirements include specialized foundation features such as rigid inclusions and load transfer mats, as well as the installation of grounding, lightning protection, and intrusion detection systems. The scope covers a wide array of trades, including structural steel, electrical utilities, plumbing, mechanical systems, and paving for access roads and loading areas. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and documentation.
J & J Contractors, Inc

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS