Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

San Bernardino Valley College Master Plan-Stadium Expansion

Forecast
2009041098State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The proposed project at San Bernardino Valley College involves the construction of a new 12,000 gross square foot welding building to modernize Career Technical Education programs as part of the college’s broader Career Pathways initiative. The facility will provide expanded, safety-compliant instructional and fabrication labs with approximately 6,800 assignable square feet, including classrooms, storage, and an exterior canopy that links to the existing East Wing welding building. The new structure supports the growing demand for welding instruction and contributes to improved energy performance and student learning environments. The project also includes infrastructure upgrades such as new storm drains, water, gas, sewer, and telecommunication lines connected to existing campus systems, along with improvements to College Drive like repaved asphalt and concrete surfaces, additional parking, and landscape enhancements. The building expansion increases the campus’s total square footage by about 1.5 percent, aligning with the 2017 Master Plan projections for growth through 2031. San Bernardino Valley College, part of the San Bernardino Community College District, has undergone extensive planning and environmental review due to seismic hazards from the San Jacinto fault, prompting earlier replacements of at-risk structures. The 2008 Measure M bond funded the creation of the 2010 Master Plan, which was certified under CEQA with a Statement of Overriding Considerations to justify unavoidable environmental impacts, including effects on historical resources, noise, and traffic. Subsequent amendments to the plan, including a stadium expansion to 4,000 seats and an EIR Addendum in 2017, ensured continued compliance with environmental regulations. The latest proposed welding building is covered under a 2020 EIR Addendum addressing modifications to Career Pathway 2, with environmental analysis confirming alignment with prior certifications. Funding for this initiative is enabled by Measure CC, a $470 million bond passed by San Bernardino County voters in 2018 to support campus modernization, with the project managed under the oversight of the San Bernardino Community College District and led by Design Program Manager Sosseh Taimoorian.

General Info

San Bernardino Valley College builds 12,000 sq ft welding facility funded by Measure CC to modernize Career Technical Education.

Agency

California → San Bernardino Community College District

Place of Performance

Esperanza Street, K Street, San Bernardino, CA, 92410

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino Community College District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Bernardino Community College District
Office AddressN/A
Contacts
Sosseh TaimoorianDesign Program Manager

Full Description

Show more
The Proposed Project includes construction of a new welding building as part of the SBVC Career Pathways modernization program. The new welding building would support the college’s Career Technical Education programs with modern instructional and safety-compliant laboratories, improving energy performance, and enhancing student learning environments. The new facility would support the growing welding program that currently exists at SBVC by expanding upon existing welding instruction space in the East Wing building in the northeast area of the campus (SBCCD 2025). At approximately 12,000 gross square feet (GSF) and 6,800 assignable square feet (ASF), the building would include classrooms, lab/ fabrication space, exterior canopy, and storage. The current East Wing welding building would remain in place and connect to the new building through an outdoor canopy area. The 2017 Master Plan estimated 451,387 ASF of building space across the campus at buildout (SBCCD 2017). The Proposed Project would increase that square footage estimate by approximately 1.5 percent. The Project includes new storm drains, water, gas, sewer, and telecommunication lines that would connect to existing infrastructure in the Project vicinity. The Project also includes improvements to College Drive including new asphalt, concrete paving, parking spaces, and landscaping. San Bernardino Valley College (SBVC) was established in the 1920s and is part of the San Bernardino Community College District (SBCCD). SBVC currently serves the West Valley area of SBCCD. In 1996, as a result of the 1992 Landers and Big Bear earthquakes, SBC CD began investigations to locate the San Jacinto fault on the campus. As a result of the seismic hazard assessment conducted in 1996, building replacement projects were completed at the campus to replace buildings located within 50 feet of the fault zone, or within the folding zone, an area of uneven elevation changes during a seismic''· event. Measure M, a $500 million bond measure, was passed in February 2008. This bond measure allowed SBCCD to complete a campus Master Plan at SBVC and to provide funding for the design and construction of new facilities to implement the Master Plan. A Master Plan for SBVC was completed in 2010 to account for the various academic buildings, infrastructure improvements, and associated parking required to meet the planning challenges related to the fault and folding zone and to support an estimated future enrollment of 17,000 total students by 2030. A California Environmental Quality Act (CEQA) Program Environmental Impact Report (PEIR) was prepared for the SBVC Master Plan which evaluated the environmental effects of buildout of the campus under the Master Plan. The SBC CD Board of Trustees certified the PEIR in April 2010. When the PEIR was certified, a Statement of Overriding Considerations was adopted for significant, unavoidable adverse effects to historical resources, noise, and traffic in accordance with CEQA Guidelines Section 15093. Specifically, the SBCCD Board of Trustees found that the benefits of the expansion of SBVC had sufficient benefit to override the unavoidable significant adverse impacts. After approval of the SBVC Master Plan and PEIR, a new stadium design was proposed that included an increase from 2,250 seats proposed in the 2010 Master Plan to 4,000 seats. After review, it was determined that this new stadium design could result in new or more severe impacts that were not discussed in the certified PEIR. A Supplemental EIR (SEIR) was prepared for the stadium expansion, which included updated studies for traffic and air quality/greenhouse gases. The SEIR was certified by the SBCCD Board of Trustees on July 11, 2013. In 2017, the SBCCD prepared an update to the Master Plan, which plans for campus growth through the buildout year of 2031. In 2018, San Bernardino County voters passed Measure CC, a $470 million bond measure to provide funding for improvement projects at SBCCD facilities, including the projects in the 2017 Master Plan. In 2019, an EIR Addendum was prepared that provided environmental analysis of the 2017 Master Plan update. In 2020, an EIR Addendum was prepared that analyzed changes proposed to Career Pathways 1 and 2 involving minor changes in building location and configuration. Since that time, changes have been proposed to Career Pathway 2 facilities that would involve construction of a new welding building. This EIR Addendum provides an environmental analysis of the proposed changes.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, located at MCB Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, exterior wall system updates, and interior reconfiguration with new finishes, including epoxy mortar flooring. Critical infrastructure upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and a complete replacement of electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements such as paving, drainage upgrades, water and sanitary system repairs, and hazardous materials abatement. The project has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Proposals are due by November 23, 2026, and will be awarded based on the lowest price. Bidders must provide pricing for building renovation and paving removal and replacement. Depending on the proposal value, bid, payment, and performance bonds may be required, with bid bonds set at 20 percent of the proposal amount. The contract is subject to the Davis-Bacon Act and Buy American requirements. All invoicing must be processed through Wide Area Workflow, and the contractor is required to maintain a quality control system compliant with FAR 52.246-12.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. The project follows a fire sprinkler discharge and requires the restoration of the first, second, and third floors, including dormitory rooms, offices, conference rooms, and hallways. The scope of work encompasses architectural repairs such as drywall replacement, painting, ceiling tile and drywall ceiling repair, and the installation of rubber wall bases and LVP flooring. Additionally, the contractor is responsible for electrical repairs and the replacement of vanities and cabinets. All work must comply with ADA, OSHA, EPA, and NFPA-101 Life Safety Code standards, with Massachusetts state regulations prevailing where more stringent. The total period of performance is 105 days, consisting of 90 days to reach substantial completion and 15 days for final completion. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit their proposals by November 17, 2026. Required submission documents include a detailed cost breakdown for labor, materials, and equipment, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and certification of conformity to local wage rate decisions. The contractor must provide a one-year workmanship guarantee and a 20-year product warranty for LVP flooring.
Grafton Job Corps

POSTED

about 6 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as common areas and mechanical rooms. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, along with the temporary removal and re-installation of HVAC equipment. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that all restored mechanical, plumbing, electrical, fire/life-safety, and security systems are fully tested and approved. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing, a detailed work plan addressing occupied-building protection, and evidence of relevant experience. Key requirements include the provision of payment and performance bonding for the full project value and proof of liability insurance with minimum coverage of 1 million dollars per occurrence and 3 million dollars general aggregate within ten days of award. Final acceptance by CSD is contingent upon the correction of all deficiencies and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 6 hours ago

DEADLINE

in 9 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS