San Francisquito Creek Bridge Bank Stabilization Project Amendment (Notification of Streambed Alteration, No. EPIMS-SMO-41275-R3)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife, Region 3 – Bay Delta, has amended Streambed Alteration Agreement EPIMS-SMO-41275-R3 to authorize Caltrain, represented by Michael Tauchen, to conduct bank stabilization work along the northern side of the San Francisquito Creek bridge crossing between Menlo Park and Palo Alto. The project aims to enhance public safety for rail, bicycle, and pedestrian users by addressing erosion and structural instability near the bridge supports. Activities include removing previously installed emergency rock slope protection and performing minor excavation and potholing in proximity to the bridge foundation, without expanding the existing stream channel. The work is conducted under a categorical exemption outlined in Title 14, Section 15301(b) of the California Code of Regulations, qualifying it as a minor alteration to an existing facility with no change in use. The amendment is governed by Section 1602 of the Fish and Game Code, which regulates modifications to fish and wildlife habitats, and is tracked through the state’s Electronic Project Information Management System. The signing date for the amendment is June 20, 2025, with the project site located at approximately latitude 37.447286, longitude -122.170445, extending downstream into El Palo Alto Park in San Mateo County. No contractual pricing information, payment details, or federal acquisition regulation clauses are included in the documentation, as this is an environmental permitting amendment rather than a procurement contract. The contracting authority, California Department of Fish and Wildlife, serves as the approving agency and is responsible for inspection and acceptance of the work, with Jason Teichman designated as the primary environmental scientist point of contact and Craig Weightman overseeing habitat conservation program compliance. Caltrain acts as the entity executing the work, with no formal FAR-style contract type, delivery terms, or financial data provided. The project does not require UEI or CAGE codes, socioeconomic certifications, or offeror representations, reflecting its nature as a regulatory compliance action under state environmental law. While a posting date of August 25, 2025, appears in metadata, submission instructions reference mailing to the Fairfield office or email to R3LSA@wildlife.ca.gov, with no electronic portal or formal proposal format mandated. The scope remains limited to the described bank stabilization tasks, with no options, contingencies, or additional deliverables beyond the permitted environmental modification.

General Info

Caltrain to stabilize San Francisquito Creek bank near bridge under state environmental permit, no payment or contract terms included.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

EPIMS-SMO-41275-R3 San Francisquito Creek Bridge Bank Stabilization Project Amendment NOE

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
Contacts
Jason TeichmanEnvironmental Scientist
Michael TauchenPerson or Public Agency Carrying Out Project

Full Description

Show more
The California Department of Fish and Wildlife has executed an Amendment to Streambed Alteration Agreement EPIMS Notification No. EPIMS-SMO-41275-R3, pursuant to Section 1602 of the Fish and Game Code to Michael Tauchen, Caltrain. The Caltrain San Francisquito Creek Bridge Bank Repair Project includes activities to stabilize the northern bank of the Caltrain bridge that crosses over San Francisquito Creek at the border of Menlo Park and Palo Alto, to improve public safety not just of the Peninsula Joint Powers Board infrastructure, but also the safety of Menlo Park and Palo Alto’s infrastructure and bicycle-pedestrian bridge users. The Amendment includes work to remove rock slope protection placed under an emergency notification and minor excavation work and potholing near the bridge supports.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Sanibel Bridge Fender System Repairs
Solicitation # B260308JAK
Lee County, Florida, is inviting qualified contractors to submit sealed bids for the repair, rehabilitation, replacement, and restoration of the Sanibel Bridge fender system and associated marine components, including timber and composite fenders, prestressed concrete piles, pile head repairs, catwalks, navigation lighting, clearance gauges, handrails, and related structural elements. The scope of work must be fully understood and addressed according to the official specifications available exclusively on the County’s procurement portal at https://leegov.ionwave.net, and bidders are responsible for verifying all documents, addenda, and updates posted there, as submissions based on incomplete or incorrect information from other sources will not be accepted. All bids must be submitted electronically via Ion Wave or hand-delivered in a sealed envelope clearly labeled with the solicitation number B260308JAK, project title, bidder name, and contact details to the Procurement Management Division at 2115 Second Street, 1st Floor, Fort Myers, FL 33901 no later than September 9, 2026, at 7:30 PM, with electronic submissions strongly recommended to avoid technical failures. Bidders are required to complete and sign the Bid Invitation, accurately fill out all attributes and bid lines, and include all requested attachments, ensuring files are uncorrupted and fully accessible. Submissions that are incomplete, unreadable, or improperly formatted may be disqualified. All bids will be publicly opened at the same office on the deadline date and time, and selection will be based on compliance with the solicitation’s technical requirements and overall responsiveness. Questions about the solicitation must be submitted electronically through the official portal’s questions tab, and bidders are cautioned that the County bears no responsibility for internet outages or system failures, urging early submission to ensure timely receipt. The point of contact for inquiries is Jason Koza at jkoza@leegov.com or 239-533-8898, and the official posting site remains https://leegov.ionwave.net for all solicitation-related information.
Lee County

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to address per- and polyfluoroalkyl substances in the water supply. The project aims to enhance the plants' capacity to effectively remove these contaminants in compliance with evolving regulatory standards and public health priorities, requiring integrated engineering solutions across multiple disciplines. All work must be performed in California, with specific attention to local infrastructure constraints and environmental considerations. The solicitation, issued by Pyramid Building & Engineering, Inc. under number lacsd-surface-water-pfas-removal-project-no-251-ca, is open for responses until September 3, 2026, and is designated for Disadvantaged Business Enterprises as defined by the Department of Transportation. It is classified under NAICS code 237310 for water and wastewater treatment construction and seeks qualified contractors with expertise in complex treatment system implementations. Primary communication and inquiries should be directed to John Garrison at estimating@pyramidbuilding.net or 760-949-9005, with all proposals expected to meet the required standards for DBE participation and technical delivery under the terms of the solicitation.
Pyramid Building & Engineering, Inc.

POSTED

about 12 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237310
New
SLED
4th Street Mobility Improvements Project and Downtown Bus Stop Improvements Project, Specification No. PW 23-59
Solicitation # PW 23-59
The City of Oxnard is soliciting sealed bids for the 4th Street Mobility Improvements Project and Downtown Bus Stop Improvements Project under Specification No. PW 23-59, with bids due by 2:00 PM on September 9, 2026. The project encompasses a comprehensive range of infrastructure enhancements along 4th Street from C Street to Oxnard Boulevard, including new concrete sidewalks, curb and gutter, road and driveway reconstruction, electrical conduit and pull boxes for street lighting, traffic signals, bus shelters, street furniture, bike lanes, landscaping, and an irrigation system, with striping improvements extending to Meta Street and the intersection with 6th Street. Additionally, approximately fifty downtown bus stops will be upgraded. Work will involve demolition of existing pavement, curbs, gutters, and sidewalks; removal and replacement of street lighting and trees; excavation and reconstruction of roadways; installation of storm drains and concrete structures; adjustment of utility covers to finished grade; placement of asphalt concrete; and final traffic striping. All work must comply with the 2018 edition of the Standard Specifications for Public Works Construction and all amendments through the 2021 edition, collectively referred to as the Greenbook. Bidders must obtain all contract documents exclusively through the City’s electronic bidding portal at Planet Bids, as the Public Purchase platform is not used for this solicitation. Questions regarding the project should not be posted on any public forum. The project is administered by the City of Oxnard’s Public Works Projects Department, and inquiries can be directed to pw-publicprojects@oxnard.org or (805) 385-8280. Bid submissions are required to be sealed and delivered by the stated deadline, and the work is to be performed entirely within the City of Oxnard, California. No set-aside designation is specified, and all prospective contractors are expected to meet the full scope of construction requirements as detailed in the contract documents.
City of Oxnard

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details