Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

San Juan Lateral Extension Phase I - 2023 Bond Project No. 25

Open
HCDD1-25-040-12-09-ESZState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Juan Lateral Extension Phase I, identified as 2023 Bond Project No. 25 (Solicitation HCDD1-25-040-12-09-ESZ), is a construction project managed by the Hidalgo County Drainage District No. 1 in Texas. The project aims to increase flow and capacity within the existing Right-of-Way to improve drainage for the upstream portion of the system in the city of San Juan. The work alignment begins south of Sam Houston Blvd and extends to the IBWC Levee outfall. The scope includes ditch widening, regrading, reconstruction, and re-alignment, as well as the installation of storm structures such as field drains, outfalls, riprap, headwalls, and crossings. Key requirements include the implementation of SW3P throughout the project and the coordination of full road closures for three 2-lane road crossings, where Metal Beam Guard Fencing will be installed. The contract requires adherence to HCDD1 and city standards for pipe installation and road reconstruction. Bids must be submitted by December 9, 2026, at 9:30 am, consisting of one original hard copy and one PDF on a USB drive. Financial requirements include a 5% bid bond for contracts over $100,000, a performance bond for contracts exceeding $50,000, and a payment bond for those exceeding $25,000. The project is subject to various federal regulations, including the Clean Air Act, Federal Water Pollution Control Act, and the Davis-Bacon Act for wage determinations. There is no specified set-aside status for this solicitation.

General Info

Hidalgo County drainage project to increase flow and capacity in San Juan, Texas.

Documents

10
PDF, High priority: read this first2 pages · contract-document
High
PDF, High priority: read this first2 pages · specifications
High
PDF, High priority: read this first14 pages · contract-document
High
PDF, High priority: read this first45 pages · specifications
High
PDF, High priority: read this first468 pages · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first36 pages · rfb
High
PDF, High priority: read this first48 pages · general-conditions
High
PDF, High priority: read this first5 pages · wage-determination
High
PDF, Low priority5 pages · appendices
Low

Read all 10 documents

Due in 16 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 16 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 10 solicitation documentsRead every page
  • AI contract breakdown12 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Engineering
Contacts2 people available
OfficeEdinburg, TX, 78542, USA

Interested Companies (2)

Trinity Management SolutionsMission, TX

Full Description

Show more
The project as proposed will increase flow and capacity to the existing system within the existing Right-of-Way in order to better drain the upstream portion of the system that drains the affected area within the city of San Juan. The alignment for the project begins just south of Sam Houston Blvd and reaches to the IBWC Levee outfall that is managed by a gatewell structure. No work is proposed within the IBWC levee. The project consists consists of ditch widening, regrading, reconstruction, re-alignment, installation of storm structures such as field drains, outfalls, riprap, headwalls, crossings, and all other relevant appurtenances. There are 3 road crossings of 2-lane roads where full road closures will need to be coordinated and implemented with the presiding municipality, Metal Beam Guard Fence is proposed at these crossings. SW3P is also proposed throughout the project.

Similar Contracts

Same NAICS industry code

More opportunities from Texas → Engineering

Same awarding agency

NAICS: 237310
New
SLED
Alberta Road Reconstruction Phase III
Solicitation # RFP 2027-10
The Alberta Road Reconstruction Phase III project, managed by the City of Edinburg, involves the construction of a raised concrete median along Closner Boulevard (Business Highway 281), the installation of concrete riprap, and paving work along Alberta Road between Closner Boulevard and I-69C. The paving scope includes both roadway reconstruction and milling and overlay. The project is expected to reach substantial completion within 150 calendar days and must adhere to TxDOT 2024 Standard Specifications and the latest City of Edinburg Standards Manual. Technical requirements include a minimum 6-inch utility clearance and specific pavement specifications consisting of 6 inches of lime-treated subgrade, 8 inches of flexible base material, and 3 inches of hot-mix asphaltic concrete. The contract is awarded based on the best qualified respondent, with evaluation factors focusing on prior experience (20%) and years in business (5%), alongside a variable price category. Required submissions include a comprehensive PDF proposal, insurance certificates, and various certifications, including a non-bribery form and a statement of qualifications. For projects exceeding $25,000, a bid guarantee of 5% is required, and the successful contractor must provide EJCDC-standard performance and payment bonds. There is no set-aside status for this solicitation.
Highway, Street, and Bridge Construction

POSTED

4 days ago

DEADLINE

in 7 days
View Details
NAICS: 238320
SLED
CWA2603 Water Well Rehabilitation: Willow Bank and Eldridge Road
Solicitation # 2027-ITB-005
The City of Sugar Land has issued solicitation 2027-ITB-005 for the rehabilitation of water wells at the Willow Bank and Eldridge Road sites, identified as CIP Project No. CWA2603. The scope of work includes replacing downhole equipment, performing electrical work, and providing surface preparation and protective coatings for metallic, concrete, masonry, and plastic surfaces, including storage tanks. Key deliverables include a base bid for docking stations and manual transfer switches, with an alternate bid for a generator at the Willow Bank site. The project requires strict adherence to electrical labeling standards, including ANSI A13.1 and NFPA 70, and specific coating quality standards such as SSPC-PA2 and ASTM D4417-84. The contract will be awarded to the lowest responsive and responsible bidder based on factors such as technical expertise, financial stability, and past performance. Bids are due by December 3, 2026. Required submission materials include a bid bond, financial statements, a conflict of interest questionnaire, and certification regarding debarment. The successful contractor must provide performance and payment bonds, maintain minimum insurance coverages, and ensure all labor is paid according to minimum prevailing wage rates. There is no set-aside status for this solicitation.
Painting and Wall Covering Contractors

POSTED

13 days ago

DEADLINE

in 9 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS