Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on January 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

San Lorenzo River Lagoon Culvert Debris Boom

Closed
DEPT HERE-0272State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a comprehensive infrastructure effort for the East Bay Municipal Utility District. The scope of work involves the rehabilitation of open and covered concrete structures, including resurfacing and the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the modification of sluice and slide gates. Additionally, the project requires the rehabilitation of reactor mixers and aerators, the replacement of motor control center components, and the installation of new electrical and instrumentation systems. Support services include the operation of a temporary 11 MGD pumped bypass, lead abatement, excavation, trench work, and surveying. This solicitation is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Garney Pacific, Inc. is seeking qualified subcontractors, specifically targeting those with DBE, MBE, WBE, and SBE certifications. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026, with a final bid date of November 18, 2026.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract involves the installation of bollard supports and a floating debris boom around the intake structure of the San Lorenzo Lagoon Culvert system. This includes necessary drilling activities and any additional work outlined in the project plans, as well as adherence to City and State standard specifications and special provisions related to the work. The purpose is to enhance the structural support and protect the culvert system from debris accumulation. Issued by the Public Works department of California and designated as IFB No. DEPT HERE-0272, the solicitation was posted on January 6, 2026, with responses due by February 10, 2026. The project is managed out of Santa Cruz, CA, and the main point of contact is Assistant Engineer Ryan Haley. Contractors responding to this solicitation must be prepared to comply with all specified requirements and execute the scope of work in accordance with regulatory standards and contract stipulations.

General Info

Install bollard supports and debris boom at San Lorenzo Lagoon culvert, per City and State specs.

Documents

9
PDF, High priority: read this first4 pages · specifications
High
PDF, High priority: read this firstpermit-amendment
High
PDF, High priority: read this first14 pages · geotechnical-investigation
High
PDF, High priority: read this first6 pages · ifb
High
PDF, High priority: read this first52 pages · ifb
High
PDF, High priority: read this first6 pages · sow
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstpermit
High
PDF, High priority: read this first23 pages · certification
High

Read all 9 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 14 days
  • Lift Station No. 85 ReplacementOpen now, due in 25 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts1 person available
OfficeSanta Cruz, CA, 95060, USA

Interested Companies (22)

Bidscom
Builders Exchange of Santa ClaraSanta Clara, California

See All 22 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Installation (including drilling) of bollard supports and a floating debris boom around the intake structure of the San Lorenzo Lagoon Culvert system. All other work not mentioned above that is required by the plans, City Standard Specifications, State Standard Specifications and the Special Provisions shall be performed, placed, constructed or installed.

More opportunities from California → Public Works

Same awarding agency

NAICS: 236220
New
SLED
GENERAL CONTRACTOR PRE-QUALIFICATION PACKAGE TUSTIN POLICE DEPARTMENT LOCKER ROOM RENOVATION PROJECT
Solicitation # 2026-RFP-019
The City of Tustin is seeking Statements of Qualifications and completed Pre-Qualification Questionnaires from licensed General Building Contractors for the Tustin Police Department Locker Room Renovation Project. Located at 300 Centennial Way, the project involves the interior renovation of employee support spaces, including the modernization of men's and women's locker rooms, private changing areas, an employee lounge, and lactation/wellness spaces. The scope includes selective demolition, framing, drywall, flooring, painting, and the installation of new lockers and millwork. To maintain active police operations, the contractor must provide temporary facilities, including a locker room/shower trailer and an accessible restroom trailer, while adhering to ADA standards and strict security requirements, including DOJ fingerprinting and clearance for all personnel. The pre-qualification process, designed to comply with California Public Contract Code section 20101, is mandatory for any contractor wishing to bid. Evaluation is based on objective criteria, with a focus on comparable project experience in occupied municipal facilities, key personnel expertise, operational phasing experience, financial capacity, safety records, and performance history. Mandatory requirements include valid licensing, DIR registration, insurance, and bonding. Submittals must not exceed 50 pages and must be delivered via OpenGov by December 22, 2026. The City will use this process to identify the lowest responsible bidder, requiring adherence to the 2024 Standard Specifications for Public Works Construction (The Green Book) and compliance with California prevailing wage and labor laws.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS