San Pablo Avenue Complete Streets/Bay Trail Gap Closure, WO4163, CP#25-26
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project on San Pablo Avenue in Contra Costa County aims to transform the roadway into a Complete Street that safely accommodates drivers, pedestrians, and bicyclists between California Street in Rodeo and Pomona Street in Crockett. The existing four-lane configuration will be reconfigured to three lanes—one in each direction and a center lane designated for turning, merging, truck climbing, and as a buffer median where appropriate. This redesign will free up space for approximately 13,700 linear feet of a 10-foot-wide, physically separated shared-use path for pedestrians and cyclists, protected by a 3-foot buffer and concrete barrier. An additional 650 linear feet of Class II bike lanes will be added between Rodeo Avenue and Parker Avenue, requiring pavement widening, striping, drainage inlet adjustments, and new curb ramps. Along the north side of the avenue between Parker Avenue and California Street, 1,050 linear feet of new sidewalk will be constructed. Intersection improvements are planned, including enhanced striping, traffic signal timing adjustments, new curb ramps, Rectangular Rapid-Flashing Beacons, Pedestrian Hybrid Beacons, and concrete refuge islands. At least one WestCAT bus shelter may be relocated, and a stormwater bioretention facility is proposed at the San Pablo Avenue/Refinery Road intersection. New street lighting will be installed along the northern side of the corridor from California Street to Pomona Street, with excavations ranging up to seven feet for lighting foundations and utility pole relocations, or up to three feet for other components. Utility relocations, temporary traffic controls, vegetation removal, and real estate actions such as right-of-way acquisition or easements may be necessary to support construction, which is scheduled to begin in Fall 2027 and extend for at least one year, with work primarily during weekdays and potential nighttime operations but no weekend activity. Best management practices for stormwater control, including inlet protection, will be implemented in compliance with ADA, Caltrans, FHWA, MUTCD, and AASHTO standards. The project is being administered by Contra Costa County, with environmental compliance assured under CEQA categorical exemptions, and all work will be performed on-site along the designated corridor in unincorporated areas of the county.
General Info
Agency
NAICS
Place of Performance
Pacific Avenue to Pomona Street, CA, 94572Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
