San Pablo Avenue Complete Streets/Bay Trail Gap Closure, WO4163, CP#25-26

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project on San Pablo Avenue in Contra Costa County aims to transform the roadway into a Complete Street that safely accommodates drivers, pedestrians, and bicyclists between California Street in Rodeo and Pomona Street in Crockett. The existing four-lane configuration will be reconfigured to three lanes—one in each direction and a center lane designated for turning, merging, truck climbing, and as a buffer median where appropriate. This redesign will free up space for approximately 13,700 linear feet of a 10-foot-wide, physically separated shared-use path for pedestrians and cyclists, protected by a 3-foot buffer and concrete barrier. An additional 650 linear feet of Class II bike lanes will be added between Rodeo Avenue and Parker Avenue, requiring pavement widening, striping, drainage inlet adjustments, and new curb ramps. Along the north side of the avenue between Parker Avenue and California Street, 1,050 linear feet of new sidewalk will be constructed. Intersection improvements are planned, including enhanced striping, traffic signal timing adjustments, new curb ramps, Rectangular Rapid-Flashing Beacons, Pedestrian Hybrid Beacons, and concrete refuge islands. At least one WestCAT bus shelter may be relocated, and a stormwater bioretention facility is proposed at the San Pablo Avenue/Refinery Road intersection. New street lighting will be installed along the northern side of the corridor from California Street to Pomona Street, with excavations ranging up to seven feet for lighting foundations and utility pole relocations, or up to three feet for other components. Utility relocations, temporary traffic controls, vegetation removal, and real estate actions such as right-of-way acquisition or easements may be necessary to support construction, which is scheduled to begin in Fall 2027 and extend for at least one year, with work primarily during weekdays and potential nighttime operations but no weekend activity. Best management practices for stormwater control, including inlet protection, will be implemented in compliance with ADA, Caltrans, FHWA, MUTCD, and AASHTO standards. The project is being administered by Contra Costa County, with environmental compliance assured under CEQA categorical exemptions, and all work will be performed on-site along the designated corridor in unincorporated areas of the county.

General Info

Transform San Pablo Avenue into a Complete Street with bike paths, sidewalks, safety features, and utilities, starting Fall 2027.

Agency

California → Contra Costa County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Pacific Avenue to Pomona Street, CA, 94572

Set-Aside

NONE

Documents

(1)

Notice of Exemption for San Pablo Avenue Complete Streets Project CP#25-26

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Contra Costa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Contra Costa County
Office AddressN/A
Contacts
Syd SotoodehSenior Planner
Alex NatkemperProject Manager

Full Description

Show more
The purpose of this project is to improve San Pablo Avenue by converting it to a more accessible "Complete Street" for drivers, pedestrians, and bicyclists. Improvements will occur within the existing roadway between California Street in Rodeo and Pomona Street in Crockett. The roadway will be reconfigured from four vehicular travel lanes to three: one travel lane in each direction, and a center lane that will provide turning, merging, truck-climbing needs and a buffer median, depending on location. This change will create space to construct approximately 13,700 linear feet of a 10-footwide shared use path for pedestrians and bicyclists that is separated from vehicular traffic by a 3-foot-wide buffer and concrete barrier. Additionally, approximately 650 linear feet of new Class II bike lanes will be constructed between Rodeo Avenue and Parker Avenue. The new bike lanes will involve pavement widening and striping to allow for parallel parking, existing drainage inlet modification/relocation, and curb ramp construction. The project will construct approximately 1,050 linear feet of sidewalk along the north side of San Pablo Avenue between Parker Avenue and California Street. Intersection upgrades may include striping, pavement markings, traffic signal timing optimization, curb ramp construction/reconstruction, Rectangular Rapid-Flashing Beacon and Pedestrian Hybrid Beacon installation, and concrete passageway (refuge island) modifications. At least one Western Contra Costa Transit Authority (WestCAT) bus shelter may be relocated. A stormwater bioretention facility may be constructed at the San Pablo Avenue/Refinery Road intersection. Street lighting will be installed along the northern side of San Pablo Avenue between California Street and Pomona Street. An excavation depth of around seven feet is expected for the construction of street lighting foundations and relocation of existing utility or traffic signal poles. Otherwise, excavation of up to three feet is expected for other improvements. Utility relocations, temporary traffic control, and vegetation trimming and removal may be necessary to accommodate the project. Real Estate transactions, including right-of-way acquisition and easements may be needed. Construction is anticipated to start in the Fall of 2027 and last at least twelve months. While nighttime work may be needed to complete the project, work on weekends is not anticipated. Applicable best management practices will be implemented for water pollution control such as storm drain inlet protection.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 18 hours ago

DEADLINE

in 24 days
View Details