Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

San Pablo Avenue Complete Streets/Bay Trail Gap Closure, WO4163, CP#25-26

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Pablo Avenue Complete Streets/Bay Trail Gap Closure project, identified as WO4163 and CP#25-26, is a Contra Costa County initiative to transform San Pablo Avenue into a more accessible corridor for drivers, pedestrians, and bicyclists. Located between California Street in Rodeo and Pomona Street in Crockett, the project involves reconfiguring the roadway from four vehicular lanes to three, featuring one travel lane in each direction and a center lane for turning, merging, and truck-climbing. Key infrastructure improvements include the construction of approximately 13,700 linear feet of a 10-foot-wide shared use path with a 3-foot buffer and concrete barrier, 650 linear feet of new Class II bike lanes, and 1,050 linear feet of sidewalk. Additional project components include intersection upgrades such as traffic signal timing optimization, the installation of Rectangular Rapid-Flashing Beacons and Pedestrian Hybrid Beacons, and the potential construction of a stormwater bioretention facility at the San Pablo Avenue and Refinery Road intersection. The scope also encompasses street lighting installation, the relocation of at least one WestCAT bus shelter, and necessary utility relocations. Construction is anticipated to begin in the Fall of 2027 and will last at least twelve months. The project is managed by the Contra Costa County Public Works Department and the Department of Conservation and Development, with work expected to occur during the day and night, though not on weekends.

General Info

Contra Costa County project improving San Pablo Avenue infrastructure starting Fall 2027.

Agency

California → Contra Costa County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Pacific Avenue to Pomona Street, CA, 94572

Set-Aside

NONE

Documents

(1)

Notice of Exemption for San Pablo Avenue Complete Streets Project CP#25-26

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Contra Costa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Contra Costa County
Office AddressN/A
Contacts
Syd SotoodehSenior Planner
Alex NatkemperProject Manager

Full Description

Show more
The purpose of this project is to improve San Pablo Avenue by converting it to a more accessible "Complete Street" for drivers, pedestrians, and bicyclists. Improvements will occur within the existing roadway between California Street in Rodeo and Pomona Street in Crockett. The roadway will be reconfigured from four vehicular travel lanes to three: one travel lane in each direction, and a center lane that will provide turning, merging, truck-climbing needs and a buffer median, depending on location. This change will create space to construct approximately 13,700 linear feet of a 10-footwide shared use path for pedestrians and bicyclists that is separated from vehicular traffic by a 3-foot-wide buffer and concrete barrier. Additionally, approximately 650 linear feet of new Class II bike lanes will be constructed between Rodeo Avenue and Parker Avenue. The new bike lanes will involve pavement widening and striping to allow for parallel parking, existing drainage inlet modification/relocation, and curb ramp construction. The project will construct approximately 1,050 linear feet of sidewalk along the north side of San Pablo Avenue between Parker Avenue and California Street. Intersection upgrades may include striping, pavement markings, traffic signal timing optimization, curb ramp construction/reconstruction, Rectangular Rapid-Flashing Beacon and Pedestrian Hybrid Beacon installation, and concrete passageway (refuge island) modifications. At least one Western Contra Costa Transit Authority (WestCAT) bus shelter may be relocated. A stormwater bioretention facility may be constructed at the San Pablo Avenue/Refinery Road intersection. Street lighting will be installed along the northern side of San Pablo Avenue between California Street and Pomona Street. An excavation depth of around seven feet is expected for the construction of street lighting foundations and relocation of existing utility or traffic signal poles. Otherwise, excavation of up to three feet is expected for other improvements. Utility relocations, temporary traffic control, and vegetation trimming and removal may be necessary to accommodate the project. Real Estate transactions, including right-of-way acquisition and easements may be needed. Construction is anticipated to start in the Fall of 2027 and last at least twelve months. While nighttime work may be needed to complete the project, work on weekends is not anticipated. Applicable best management practices will be implemented for water pollution control such as storm drain inlet protection.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS