San Pedro Ponds Pipeline Installation Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The San Pedro Ponds Pipeline Installation Project, managed by the Santa Clara Valley Water District in Morgan Hill, California, aims to enhance groundwater recharge within the Llagas Groundwater Subbasin. The scope of work involves undergrounding 2,200 linear feet of existing 12-inch HDPE pipe and installing approximately 450 linear feet of new 12-inch HDPE pipeline to connect the San Pedro Ponds to the Madrone Channel via an existing storm drain manhole. To prevent bank erosion and protect pond slopes, the project includes the installation of new energy dissipation vaults and 8-foot by 8-foot rock slope protection outfall structures at Ponds 3 and 7. These improvements are designed to maximize the percolation of imported Central Valley Project water from the San Luis Reservoir and ensure the structural integrity of the Upper Llagas Recharge System.
General Info
Agency
NAICS
Place of Performance
Hill Road and San Pedro Avenue, Morgan Hill, CA, 95037Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
