San Pedro Ponds Pipeline Installation Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The San Pedro Ponds Pipeline Installation Project, managed by the Santa Clara Valley Water District, is designed to maximize groundwater recharge in the Llagas Groundwater Subbasin and protect infrastructure from erosion. The scope of work involves undergrounding 2,200 linear feet of existing 12-inch diameter HDPE pipe to facilitate the recharge of Ponds 1, 3, and 7. Additionally, the project includes the installation of approximately 450 linear feet of new 12-inch HDPE pipeline to connect the ponds to an existing storm drain manhole at the Madrone Channel, along with the installation of energy dissipation vaults and rock slope protection outfall structures at Ponds 3 and 7 to prevent bank erosion. All construction, staging, and stockpiling activities will take place on a 38.4-acre Valley Water fee title property located in Morgan Hill, California. The project is classified under NAICS code 237110 and is expected to be completed within a three-week construction period. According to the Notice of Exemption dated June 17, 2026, the project is CEQA-exempt under Class 1 for existing facilities and Class 2 for replacement or reconstruction.
General Info
Agency
Place of Performance
Hill Road and San Pedro Avenue, Morgan Hill, CA, 95037Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
