Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

San Pedro Ponds Pipeline Installation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Pedro Ponds Pipeline Installation Project, managed by the Santa Clara Valley Water District, is designed to maximize groundwater recharge in the Llagas Groundwater Subbasin and protect infrastructure from erosion. The scope of work involves undergrounding 2,200 linear feet of existing 12-inch diameter HDPE pipe to facilitate the recharge of Ponds 1, 3, and 7. Additionally, the project includes the installation of approximately 450 linear feet of new 12-inch HDPE pipeline to connect the ponds to an existing storm drain manhole at the Madrone Channel, along with the installation of energy dissipation vaults and rock slope protection outfall structures at Ponds 3 and 7 to prevent bank erosion. All construction, staging, and stockpiling activities will take place on a 38.4-acre Valley Water fee title property located in Morgan Hill, California. The project is classified under NAICS code 237110 and is expected to be completed within a three-week construction period. According to the Notice of Exemption dated June 17, 2026, the project is CEQA-exempt under Class 1 for existing facilities and Class 2 for replacement or reconstruction.

General Info

Santa Clara Valley Water District installing HDPE pipelines for groundwater recharge in Morgan Hill.

Agency

California → Santa Clara Valley Water District

Place of Performance

Hill Road and San Pedro Avenue, Morgan Hill, CA, 95037

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clara Valley Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Clara Valley Water District
Office AddressN/A
Contacts
Kelly WhiteEnvironmental Planner

Full Description

Show more
The San Pedro Ponds are used to percolate imported Central Valley Project water from San Luis Reservoir into the Llagas Groundwater Subbasin. The San Pedro Ponds are part of the Upper Llagas Recharge System, which includes in-stream recharge along Llagas Creek and the Madrone Channel. The project would underground the existing 2,200 linear feet of 12-inch-diameter HDPE pipe, connect the San Pedro Ponds to the Madrone Channel by installing approximately 450 linear feet of new 12-inch-diameter HDPE pipeline and connecting it to an existing storm drain manhole, and install new energy dissipation vaults and 8-foot-wide by 8-foot-long rock slope protection outfall structures at Ponds 3 and 7 to protect the pond slopes from erosion. The project is needed to maximize groundwater recharge at the San Pedro Ponds, provide a new storm drain connection between the San Pedro Ponds and Madrone Channel, and protect Ponds 3 and 7 from bank erosion at the outfall structures.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional site responsibilities include clearing and grubbing of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Key operational deliverables include the maintenance of flows and bypass for all pipes and manholes during construction, as well as geotechnical instrumentation and monitoring. The project also requires specific railroad insurance. The bid schedule encompasses general base bid items, sewer base bid items, and contingent items, with primary contact for bid documents and subcontracting opportunities being John Connelly.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, generator, and odor control equipment, as well as the demolition of existing pumps and piping, installation of new gravity sewers and manholes, and various site improvements including stormwater facilities and fencing. The contract is governed by EJCDC standard general and supplementary conditions and will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A. The project requires performance and payment bonds, as well as proof of insurance. Contract administration is managed by the City of Belmont with Willis Engineers serving as the representative. Payment is processed via Applications for Payment, with the Engineer reviewing submissions within 10 days and payment becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project, with a submission deadline of November 12, 2026, at 2:00 pm via the City's e-Procurement Portal. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed and must adhere to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is currently seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. Bidders must provide a minimum of three similar project references, a detailed Quality Management Plan, and a Timeliness Tracking Plan. The project is subject to Davis-Bacon wage determinations, American Iron and Steel requirements, and strict adherence to OSHA and ADA standards. Successful bidders must provide performance and payment bonds equal to 100 percent of the contract amount.
WG Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS