Sand Separator and Tail Pipe Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract calls for the installation of a sand separator and tail pipe within a well column to safeguard the pump from sediment damage and to maintain optimal operational efficiency. This work is critical for ensuring the long-term reliability of water extraction systems by preventing abrasive particles from entering and degrading the pump mechanism. The project is classified as a subcontract under NAICS code 238990 and is being managed by the Engineering Department of Elsinore Valley Municipal Water District in California. All proposals must be submitted by August 25, 2026, at 9:00 PM, with no set-aside provisions specified for small or disadvantaged businesses. The work must be performed at the district’s well site, though exact location details are not provided in the posting. Interested parties can access further information through the specified vendor portal link.
General Info
Agency
NAICS
Place of Performance
CA, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from California → Engineering Department of Elsinore Valley Municipal Water District
Same awarding agency