This Solicitation opportunity from Nebraska was posted on November 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for 25-201 Box Canyon Spillway Repair Bid Proposal & Supplemental Forms: Bid proposal and supplemental forms for the Box Canyon Spillway Repair project issued by Public Utility District No. 1 of Pend Oreille County. The document includes the bid submission form with a lump sum price schedule (including mobilization and optional bay repairs), a bid bond template, and requirements for non-collusion affidavits and wage payment certifications.
PDF
PDF, High priority: read this firstitb
HighAI Summary for 25-201 Box Canyon Spillway Repair - Instructions to Bidders: This document provides the general requirements and instructions for bidders regarding the Box Canyon Spillway Repair project for Public Utility District No. 1 of Pend Oreille County. It outlines the electronic submission process via ProcureWare, bid bond requirements (5%), performance and payment bond obligations (100%), insurance minimums, and due diligence expectations for bidders.
PDF
PDF, High priority: read this firstitb
HighAI Summary for 25-201 Box Canyon Spillway Repair ITB: Invitation to Bid (ITB 25-201) issued by Public Utility District No. 1 of Pend Oreille County for the rehabilitation and repair of Box Canyon Dam Spillway Bays 1 and 2. The scope includes dewatering, demolition of existing apron slabs, and installation of reinforced concrete repair patches. Bids are due via ProcureWare by September 11, 2025, at 2:00 p.m. PST. Requirements include a bid proposal, project schedule, and a 5% bid guarantee.
DOCX
DOCX, High priority: read this first6 pages · other
HighAI Summary for Attachment A Equipment Specifications for One 39K GVWR Truck Chassis: Attachment A provides detailed equipment specifications for one 39,000 lb GVWR truck chassis intended for Lincoln Transportation and Utilities - Star Tran. It outlines minimum acceptable requirements including engine, transmission, axles, suspension, frame, wheels, tires, brakes, and electrical system. The document specifies compliance with licensing, safety regulations, and EPA standards. It includes instructions for bidders, chassis configuration, and application for snow plowing and ice control. The specifications ensure the truck is new, current model year, and suitable for mounting equipment with detailed technical and operational requirements.
DOCX
DOCX, High priority: read this first4 pages · ifb
HighAI Summary for Bid 25-201 General Specifications for 39K GVWR Truck Chassis and Upfit Dump Body: This document is the General Specifications for Bid #25-201 issued by the City of Lincoln for the procurement of a 39K GVWR Truck Chassis and the upfit of one 11’ Dump Body-Combo Spreader-Hydraulic System-Lighting-Front Snowplow. It outlines the minimum acceptable requirements, bid submission instructions via the City/County E-Bid system, registration requirements, and federal funding compliance including FTA regulations. The document also details ethics in government contracting, communication protocols, and the need for bidders to provide references and comply with federal guidelines. The specifications serve as the basis for the Invitation for Bid (IFB) process for qualified contractors to submit their bids.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Box Canyon Spillway Apron Rehabilitation - Technical Specifications: Technical specifications (100% FERC Review Submittal) for the rehabilitation of the spillway apron slab at Bays 1 and 2 of the Box Canyon Dam for Pend Oreille County PUD No. 1. The document outlines the scope of work, including dewatering, demolition, and reinforced concrete repair, with a completion deadline of December 12, 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Box Canyon Spillway Repair - Construction Drawings: Volume 2 Construction Drawings for the Box Canyon Spillway Repair project for Pend Oreille Public Utility District No. 1, dated August 2025. The document includes a drawing index, location/project maps, site plans for contractor staging, and structural repair details for FERC review submittal.
PDF
PDF, High priority: read this firstifb
HighAI Summary for City of Aurora - Utility Terrain Vehicle (UTV) for EMS (25-201): The City of Aurora, Illinois, issued this solicitation (25-201) on September 11, 2025, to procure a custom Utility Terrain Vehicle (UTV) designed for Emergency Medical Services (EMS) operations in inaccessible areas. The document outlines instructions for bidders, submission deadlines (September 25, 2025), and the award criteria, stating the contract will be awarded to the lowest responsive and responsible bidder.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Lincoln Insurance Requirements: This document outlines the mandatory insurance requirements for contractors performing work for the City of Lincoln, Lancaster County, and related agencies. It specifies coverage limits and mandates for Workers' Compensation, Garage Liability, Garagekeepers, and Inland Marine Coverage, including requirements for Certificates of Insurance (COI), waivers of subrogation, and additional insured endorsements.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Contract 25-201: Box Canyon Spillway Repair: Public works agreement between Public Utility District No. 1 of Pend Oreille County and a Contractor for the rehabilitation of the spillway apron slab at Bays 1 and 2 of Box Canyon Dam. The scope includes dewatering, demolition, and installation of a reinforced concrete repair patch, with a substantial completion date of December 12, 2025. The document outlines terms for changes, protests, claims, compensation, and a 5% retainage policy.
PDF
PDF, High priority: read this first15 pages · contractor-responsibility-form
HighAI Summary for Contractor Responsibility Form for StarTran: This Contractor Responsibility Form for StarTran outlines the requirements for contractors and subcontractors to disclose detailed information about their identity, ownership, and past performance. It includes instructions on who must complete and sign the form, definitions of key terms such as affiliate, control, joint venture, and subcontract, and mandates disclosure of any significant adverse information within the past ten years. The form requires the contractor's legal name, tax identification numbers, legal entity type, ownership details, addresses, and contact information. It also specifies obligations to notify the City of Lincoln’s/StarTran Assistant Purchasing Agent of any changes or inaccuracies during contract performance. This document is essential for assessing contractor responsibility and compliance prior to contract award.
DOCX
DOCX, High priority: read this first20 pages · contract-document
HighAI Summary for Federal Clauses and Bid Protest Procedures: This document outlines the federal requirements applicable to contractors performing under a contract involving the Federal Transit Administration (FTA). It includes clauses on access to records and reports, record retention, and site access for audits. The document also mandates compliance with the Americans with Disabilities Act (ADA) and related nondiscrimination statutes. Additionally, it details the bid protest procedures, defining interested parties, protest submission guidelines, authority to resolve protests, and the role and procedures of the Procurement Appeals Board. The document is essential for ensuring contractor compliance with federal regulations and city procurement protest processes.
PDF
PDF, High priority: read this first4 pages · instructions-to-bidders
HighAI Summary for Instructions to Bidders 11-2023: This document titled 'Instructions to Bidders 11-2023' provides detailed procedures and requirements for bidders responding to solicitations issued by the City of Lincoln and related entities. It covers electronic bid submission, registration on the Owner's Ebid site, deadlines, handling deviations, communication restrictions, and consequences of violations. It also explains clarification processes, independent price determination, brand name alternates, sample demonstrations, delivery terms for non-construction items, and warranty requirements. The document is essential for bidders to understand the rules and expectations for submitting compliant and competitive bids.
DOCX
DOCX, Low priority14 pages · other
LowAI Summary for Attachment B 2.1 Up-fit One 11' Spreader Body-Combo Spreader General Equipment Specifications: This document is Attachment B containing general equipment specifications for the up-fit of one 11-foot spreader body combination spreader with hydraulic system and lighting system for Lincoln Transportation and Utilities – StarTran. It details model requirements, cab shield design, lighting system components and installation, and central hydraulic system specifications including pump type and configuration. The document specifies materials, mounting, wiring, and lighting flash patterns to meet FMVSS 108 standards. It is a technical specification attachment for equipment up-fit.
PDF
PDF, Low priority2 pages · contract-document
LowAI Summary for City of Lincoln Lancaster County Terms of Purchase Law Rev. 2-11-2024: This document titled 'City of Lincoln Lancaster County Terms of Purchase' effective February 1, 2024, outlines the terms and conditions governing purchases made by the City of Lincoln, Lancaster County, and associated agencies. It covers agreement formation, change orders, payment terms, delivery requirements, site rules, warranties, permits, compliance with laws, and termination clauses. The document serves as a standard purchase order agreement specifying vendor obligations, owner rights, and procedural guidelines for procurement transactions.
PDF
PDF, Low priority1 page · other
LowAI Summary for Foreign Adversary Contracting Prohibition Act Certification Form v2.0 June 2024: This document is the Foreign Adversary Contracting Prohibition Act Certification Form Version 2.0 dated June 2024. It is used for certifying compliance with the Act regarding technology related products or services. The form requires the company to attest whether it is a scrutinized company or not, and to certify the accuracy of the information provided. It includes fields for company name, attestations, printed name, signature, title, and date.
PDF
PDF, Low priorityother
LowAI Summary for Sample_Pics_UTV.pdf: Unreadable document.
PDF
PDF, Low priority46 pages · other
LowAI Summary for SBA Small Business Size Standards Table Matched to NAICS Codes: This document is a table from the U.S. Small Business Administration listing small business size standards matched to North American Industry Classification System (NAICS) codes, effective January 7, 2013. It details size standards expressed in millions of dollars or number of employees for various industries and subsectors such as Agriculture, Forestry, Fishing, Hunting, Mining, Utilities, and Construction. The table serves as a reference for determining the largest size a business can be to qualify as small for federal programs, with additional guidance on calculating average annual receipts and employment. Contact information for SBA Size Specialists and the Office of Size Standards is provided for further inquiries.
PDF
PDF, Low priority2 pages · other
LowAI Summary for Summary of Foreign Adversary Contracting Prohibition Act - LB 1300 Nebraska Legislature 2024: This document summarizes the Foreign Adversary Contracting Prohibition Act (LB 1300), enacted by the Nebraska Legislature in 2024 and codified under Neb. Rev. Stat. § 73 901 to § 73 907. The Act prohibits public entities from contracting with companies organized under or controlled by foreign adversaries for technology-related products or services, requiring certifications that companies are not scrutinized entities. It defines key terms such as 'company,' 'foreign adversary,' and 'scrutinized company,' and outlines exceptions, penalties, and enforcement provisions. The Act aims to mitigate political risks and protect state security and resident privacy by restricting contracts with entities linked to specified foreign adversaries.
PDF
PDF, Low priority1 page · attestation-form
LowAI Summary for United States Citizenship Attestation Form: This document is the United States Citizenship Attestation Form dated January 19, 2010. It is used to comply with Nebraska Revised Statutes §§ 4-108 through 4-114, where the individual attests to their status as either a U.S. citizen or a qualified alien under the federal Immigration and Nationality Act. The form requires the individual's printed name, signature, and date, and includes a declaration that the information provided is true, complete, and accurate for verification of lawful presence in the United States.
Response deadline changed from Jun 11, 2025 to Jun 4, 2025. The notice title changed. NAICS code changed from 238220 to 333924. The notice description changed. The point of contact changed.
Notice updated
Response deadline changed from Jun 4, 2025 to Sep 11, 2025. The notice title changed. NAICS code changed from 333924 to 237990. The notice description changed.
Notice updated
Response deadline changed from Sep 11, 2025 to Sep 25, 2025. The notice title changed. NAICS code changed from 237990 to 621111. The notice description changed. The point of contact changed.
Notice updated
Response deadline changed from Sep 25, 2025 to Dec 17, 2025. The notice title changed. NAICS code changed from 621111 to 484220. The notice description changed. The point of contact changed.
Response Deadline
Deadline has passed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.