Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

S&W Atlas Iron and Metal Company Interim Soil Vapor Extraction Workplan

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The S&W Atlas Iron and Metal Company Interim Soil Vapor Extraction Workplan is a project managed by the California Department of Toxic Substances Control to address volatile organic compounds in soil gas at a 3.28-acre facility located at 10019 South Alameda Street in Los Angeles. This interim measure is required following an Enforcement Order for Corrective Action and previous investigations that identified releases of VOCs, metals, and other contaminants across nine specific areas of concern. The primary objective is to protect adjacent properties and buildings through the installation and operation of a soil vapor extraction system while a comprehensive site investigation continues. Project activities include the installation of a skid-mounted SVE system featuring a vapor/liquid separator, an air-to-air heat exchanger, and an extraction blower with a maximum flow rate of 300 standard cubic feet per minute. The infrastructure consists of one pilot well and four additional SVE wells connected via PVC piping and high-pressure vacuum hoses to treatment vessels containing granular activated carbon and an inorganic oxidizing agent. The project requires a chain link security fence with 24-hour emergency contact signage and must comply with South Coast Air Quality Metropolitan District Rules 1166 and 203 regarding notifications for sensitive receptors within a quarter mile. Additionally, the work is subject to California Health and Safety Code regulations, including specific protocols for the discovery of biological, cultural, or human remains.

General Info

S&W Atlas installs interim SVE system at Los Angeles site to remediate VOCs from historic scrap metal operations.

Agency

California Toxic Substances Control, Department of

Place of Performance

Los Angeles, CA, 90002

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Toxic Substances Control, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Toxic Substances Control, Department of
Office AddressN/A
Contacts
Narine AghakiantProject Manager
Matthew WeisenbergOwner/Manager

Full Description

Show more
Project Description: The Interim Soil Vapor Extraction Workplan commits the S&W Atlas Iron and Metal Company (Facility) to install and operate an Soil Vapor Extraction (SVE) system to address volatile organic compounds (VOCs) in soil gas at the south and southwest areas of the Facility located at 10019 South Alameda Street in Los Angeles. The project activities include installing one SVE pilot well, four additional SVE wells connected to a vacuum extraction unit, and treating the extracted vapors before discharge. The SVE system will protect adjacent properties and buildings while the full site investigation continues. Background: The 3.28-acre Facility is located in an area that was historically used for industrial, commercial, school, and residential development. The Facility is currently covered by impervious surfaces consisting of asphalt, concrete, and one existing warehouse. A second warehouse that previously existed in the west-central portion of the Facility was demolished in September 2022. The Facility was formerly used by Atlas for scrap metal recycling operations, which ceased in 2025. As of January 19, 2026, equipment remaining onsite includes excavators, material handlers, shearing equipment, shipping containers, one roll-off bin for retired items, and one roll-off bin for trash. Prior to ceasing operations, DTSC conditionally approved of the Scrap Removal Work Plan on July 1, 2025. Metal scrap removal began on July 8, 2025, and was completed on August 22, 2025. Air monitoring is ongoing at the Facility in accordance with the Revised Phase I Air Monitoring Workplan dated February 1, 2023. On March 10, 2021, the California Department of Toxic Substances Control (DTSC) issued an Enforcement Order for Corrective Action, Docket No. HWCA-FY20/21-008 (Order), which established several required actions to evaluate if the Facility released chromium, copper, lead, nickel, zinc, polychlorinated biphenyls (PCBs), used oil, and/or polycyclic aromatic hydrocarbons (PAHs) to the subsurface. Previous Investigations: A Facility Investigation (FI) and a Supplemental Site Investigation (SSI) were conducted from 2023 to 2025 to assess Areas of Concern (AOCs) and subsurface impacts. Investigations identified releases of VOCs, metals, total petroleum hydrocarbons, and polychlorinated biphenyls in soil and soil gas. Based on the FI and SSI, the AOCs identified by DTSC are as follows: 1- Receiving Area, 2- Roll-Off Bins, 3- Metal Scrap Piles, 4- Warehouse No.1, 5- Container Loader Area, 6- Clarifier and Associated Piping System, 7- Gated Area, 8- Broken Cement Areas and 9- Lead-Impacted Soil North of the Former Warehouse No. 2. Following the review of the Facility Investigation Sampling Results dated December 12, 2025, DTSC requested that Atlas implement an interim measure to address VOCs in the southwest corner of the Facility while the full investigation of the facility is completed. Project Activities: The project activities consist of installing a skid-mounted SVE system with a vapor/liquid separator, an extraction blower with a maximum flow rate of 300 standard cubic feet per minute (SCFM), and an air-to-air heat exchanger. The SVE equipment will be connected to two vessels with granular activated carbon and one vessel with granular activated carbon and an inorganic oxidizing agent in series. The SVE blower inlet will be connected to the new SVE wells using polyvinyl chloride (PVC) piping and high-pressure vacuum hose. Five existing soil vapor probes (SVPs), SG-10, SG-14, SG-16, SG-17, and SG-18will be used for pilot testing. A chain link security fence will be installed around the SVE skid and carbon vessels. Publicly visible signage with a 24-hour emergency contact telephone number will be displayed on the system fencing. The South Coast Air Quality Metropolitan District (SCAQMD) Rule 1166 and Rule 203 will require notification of the SVE operation for sensitive receptors located less than a quarter mile away including residences, schools, or childcare. The pilot test will be conducted in 5 days or less. The pilot test results will be evaluated to estimate an ROI, which will be used as the basis for the number of wells and spacing between the wells in the interim measure. Although not anticipated, in the event biological, cultural or historical resources are discovered in the course of project activities, work will be suspended while a qualified biologist, cultural or historical specialist makes an assessment of the area and arrangements are made to protect or preserve any resources that are discovered. If human remains are discovered, no further disturbance will occur in the location where the remains are found, and the County Coroner will be notified pursuant to the Health and Safety Code, Chapter 2, Section 7050.5.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was initiated following a sprinkler system failure that caused significant water damage. The scope of work requires the remediation of the entire building, including cleaning visible mold from CMU walls, concrete floors, and vinyl tiles, as well as the removal and replacement of affected drywall, gypsum wallboard, and acoustical tile ceiling finishes. Additionally, the contractor must clean or replace damaged theater seating cushions and perform dehumidification to maintain humidity levels at or below 50 percent. All work must adhere to ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the findings of the Micro Air Inc. Mold Testing report dated April 11, 2024. The contract is a single lump sum award based on best value, with evaluation weights distributed across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Key requirements include the provision of a Certified Industrial Hygienist for verification and final clearance, a detailed remediation plan featuring HEPA filtration and negative air pressure, and compliance with Davis-Bacon Act wage determinations. Bidders must hold a valid Indiana Contractor's License and provide proof of automobile and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Proposals must be submitted on company letterhead and include a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. Work must commence within 14 days of the Notice to Proceed, and payment is issued on Net 30 terms.
Atterbury Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 10 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS