S&W Atlas Iron and Metal Company Interim Soil Vapor Extraction Workplan

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The S&W Atlas Iron and Metal Company is required to implement an interim Soil Vapor Extraction (SVE) system at its facility located at 10019 South Alameda Street in Los Angeles to address volatile organic compounds (VOCs) in soil gas, specifically in the south and southwest areas of the site. This action is mandated by the California Department of Toxic Substances Control following previous investigations that identified contamination from decades of scrap metal recycling operations, which ceased in 2025. The SVE system will include one pilot well and four additional extraction wells connected to a skid-mounted unit featuring a vacuum blower with a 300 SCFM capacity, a vapor/liquid separator, an air-to-air heat exchanger, and a treatment train of three vessels with granular activated carbon and an inorganic oxidizing agent to neutralize extracted vapors before discharge. The system will be secured with a chain-link fence and accompanied by public signage listing a 24-hour emergency contact. Pilot testing using five existing soil vapor probes will occur within five days to determine the system’s effectiveness and guide the final configuration of extraction wells. The facility, spanning 3.28 acres and currently covered by asphalt, concrete, and one warehouse, was historically used for industrial and commercial purposes and previously housed a second warehouse demolished in 2022. Environmental investigations from 2023 to 2025 revealed subsurface contamination from VOCs, metals, petroleum hydrocarbons, and polychlorinated biphenyls across nine identified Areas of Concern, prompting DTSC to require this interim measure while the full site investigation proceeds. The SVE system is designed to mitigate vapor intrusion risks to adjacent properties and buildings, including residences, schools, and childcare facilities within a quarter mile, requiring compliance with SCAQMD Rules 1166 and 203. Operations must pause if biological, cultural, or historical resources—including human remains—are uncovered, with immediate notification of authorities as required by state law. The project is managed by DTSC’s Narine Aghakiant and overseen by Facility Owner Matthew Weisenberg, with the workplan issued in July 2026 as part of ongoing corrective action under a 2021 enforcement order.

General Info

S&W Atlas installs interim SVE system at Los Angeles site to remediate VOCs from historic scrap metal operations.

Agency

California Toxic Substances Control, Department of

NAICS

562910 - Remediation ServicesView NAICS

Place of Performance

Los Angeles, CA, 90002

Set-Aside

NONE

Documents

(1)

Atlas Iron Notice of Exemption - signed

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Toxic Substances Control, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Toxic Substances Control, Department of
Office AddressN/A
Contacts
Narine AghakiantProject Manager
Matthew WeisenbergOwner/Manager

Full Description

Show more
Project Description: The Interim Soil Vapor Extraction Workplan commits the S&W Atlas Iron and Metal Company (Facility) to install and operate an Soil Vapor Extraction (SVE) system to address volatile organic compounds (VOCs) in soil gas at the south and southwest areas of the Facility located at 10019 South Alameda Street in Los Angeles. The project activities include installing one SVE pilot well, four additional SVE wells connected to a vacuum extraction unit, and treating the extracted vapors before discharge. The SVE system will protect adjacent properties and buildings while the full site investigation continues. Background: The 3.28-acre Facility is located in an area that was historically used for industrial, commercial, school, and residential development. The Facility is currently covered by impervious surfaces consisting of asphalt, concrete, and one existing warehouse. A second warehouse that previously existed in the west-central portion of the Facility was demolished in September 2022. The Facility was formerly used by Atlas for scrap metal recycling operations, which ceased in 2025. As of January 19, 2026, equipment remaining onsite includes excavators, material handlers, shearing equipment, shipping containers, one roll-off bin for retired items, and one roll-off bin for trash. Prior to ceasing operations, DTSC conditionally approved of the Scrap Removal Work Plan on July 1, 2025. Metal scrap removal began on July 8, 2025, and was completed on August 22, 2025. Air monitoring is ongoing at the Facility in accordance with the Revised Phase I Air Monitoring Workplan dated February 1, 2023. On March 10, 2021, the California Department of Toxic Substances Control (DTSC) issued an Enforcement Order for Corrective Action, Docket No. HWCA-FY20/21-008 (Order), which established several required actions to evaluate if the Facility released chromium, copper, lead, nickel, zinc, polychlorinated biphenyls (PCBs), used oil, and/or polycyclic aromatic hydrocarbons (PAHs) to the subsurface. Previous Investigations: A Facility Investigation (FI) and a Supplemental Site Investigation (SSI) were conducted from 2023 to 2025 to assess Areas of Concern (AOCs) and subsurface impacts. Investigations identified releases of VOCs, metals, total petroleum hydrocarbons, and polychlorinated biphenyls in soil and soil gas. Based on the FI and SSI, the AOCs identified by DTSC are as follows: 1- Receiving Area, 2- Roll-Off Bins, 3- Metal Scrap Piles, 4- Warehouse No.1, 5- Container Loader Area, 6- Clarifier and Associated Piping System, 7- Gated Area, 8- Broken Cement Areas and 9- Lead-Impacted Soil North of the Former Warehouse No. 2. Following the review of the Facility Investigation Sampling Results dated December 12, 2025, DTSC requested that Atlas implement an interim measure to address VOCs in the southwest corner of the Facility while the full investigation of the facility is completed. Project Activities: The project activities consist of installing a skid-mounted SVE system with a vapor/liquid separator, an extraction blower with a maximum flow rate of 300 standard cubic feet per minute (SCFM), and an air-to-air heat exchanger. The SVE equipment will be connected to two vessels with granular activated carbon and one vessel with granular activated carbon and an inorganic oxidizing agent in series. The SVE blower inlet will be connected to the new SVE wells using polyvinyl chloride (PVC) piping and high-pressure vacuum hose. Five existing soil vapor probes (SVPs), SG-10, SG-14, SG-16, SG-17, and SG-18will be used for pilot testing. A chain link security fence will be installed around the SVE skid and carbon vessels. Publicly visible signage with a 24-hour emergency contact telephone number will be displayed on the system fencing. The South Coast Air Quality Metropolitan District (SCAQMD) Rule 1166 and Rule 203 will require notification of the SVE operation for sensitive receptors located less than a quarter mile away including residences, schools, or childcare. The pilot test will be conducted in 5 days or less. The pilot test results will be evaluated to estimate an ROI, which will be used as the basis for the number of wells and spacing between the wells in the interim measure. Although not anticipated, in the event biological, cultural or historical resources are discovered in the course of project activities, work will be suspended while a qualified biologist, cultural or historical specialist makes an assessment of the area and arrangements are made to protect or preserve any resources that are discovered. If human remains are discovered, no further disturbance will occur in the location where the remains are found, and the County Coroner will be notified pursuant to the Health and Safety Code, Chapter 2, Section 7050.5.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
SLED
CATS Contract for Environmental Services
Solicitation # 269-2026-2006
The City of Charlotte, through its Charlotte Area Transit System Facilities department, is seeking qualified vendors to provide comprehensive environmental and emergency services focused on spill prevention and response across the Charlotte Mecklenburg area. The contract requires vendors to deliver both scheduled and expedited cleanup and disposal services for a range of hazardous and non-hazardous solid and liquid materials, with an emphasis on rapid deployment during emergency spill incidents. Service delivery must ensure compliance with environmental standards, prompt containment, safe handling, and proper disposal procedures to mitigate risks to public health and the environment. Proposals must be submitted by August 18, 2026, with the solicitation issued on July 29, 2026 under reference number 269-2026-2006. The contract is open to all eligible respondents without set-aside designations, and performance is expected to occur within North Carolina, specifically serving CATS facilities and operations in the Charlotte region. Primary point of contact for inquiries is Andre Branch, and additional details regarding submission requirements and evaluation criteria are available through the official solicitation portal. Vendors are expected to demonstrate proven experience in emergency response, regulatory compliance, and environmental remediation within public transit or municipal settings.
City of Charlotte

POSTED

1 day ago

DEADLINE

in 19 days
View Details