Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Georgia was posted on December 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sanitary Sewer Pipe Installation (12" DIP)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
South Operation Center (SOC) Digester Demolition
Solicitation # 26-114
Solicitation 26-114 is an Invitation For Bid issued by the City of Naperville for the South Operation Center (SOC) Digester Demolition. The project involves the demolition and removal of an abandoned digester located at 1800 S. Washington Street, including the filling of the excavation, site restoration, ancillary landscaping, and the installation of security fencing. The scope also requires the identification, handling, and legal off-site disposal of special waste, such as contaminated soil and construction debris, with specific requirements for the packaging and transportation of asbestos-containing materials. The contract will be awarded to the lowest responsible bidder based on criteria including technical capacity, integrity, past performance, and financial resources. The work must be completed by December 31, 2027, with construction operations limited to Monday through Friday from 7:00 a.m. to 4:00 p.m. A contingency allowance of $25,000 is provided for unforeseen work, while failure to achieve final completion is subject to liquidated damages of $250 per calendar day. The contractor is required to provide performance and payment bonds equal to the contract price and must comply with the State of Illinois Prevailing Wage Act and 2010 ADA Standards. Bids must be submitted electronically by December 11, 2026, and include a bid deposit equal to 10% of the total bid. All work must adhere to standards set by IDOT, the City of Naperville, ISPE, FHWA, AASHTO, ANSI, NEMA, and CFR 29 Part 1910.
Public Utilities (Water) | DPU-W

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 238910
New
Federal
Karup, Denmark DABS-FEV Laydown Site Construction
Solicitation # W912GB27RA010
The United States Army Corps of Engineers Europe District is seeking a Firm-Fixed-Price construction contract to establish a new laydown area at Karup Air Base in Denmark. This Design-Bid-Build project aims to support Base Expeditionary Airfield Resources for the beddown of 550 personnel using Deployable Air Base System sets, specifically the Alaska Small Shelter System. The scope of work includes the construction of a gravel bed covering approximately 30,957 square meters, concrete pads for various shelters, and necessary site improvements. The facility will accommodate 72 billet shelters, as well as specialized shelters for latrines, showers, laundry, a 550-person kitchen, command operations, and morale, welfare, and recreation. The project involves specific utility requirements, where domestic water and wastewater extensions will be handled by a host-nation-directed sole-source local contractor, while electrical power will be provided via DABS generator sets rather than a utility grid. The anticipated contract value is between $1 million and $5 million, with a construction duration of 365 calendar days starting around late September 2027. This is an unrestricted, full and open competitive procurement using a best-value approach, selecting the highest technically rated proposal that offers a fair and reasonable price. Interested offerors must be authorized to perform construction work in Denmark, maintain active SAM registration, and satisfy all bonding and permitting requirements.
W2SD Endist Europe

POSTED

about 6 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The City of Marietta in Georgia is seeking a subcontractor for the installation of 12-inch ductile iron pipe sanitary sewer lines. This project involves complex infrastructure work, specifically requiring deep excavation and the application of specialized joining techniques to ensure the integrity of the sewer system at varying depths. Interested parties must submit their responses by January 16, 2026, at 7:00 PM. The project falls under NAICS code 238910 and was officially posted on December 16, 2025.

General Info

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of PE-63363-NONST-2026-000000028.

The full solicitation package (12 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

UPPER ER SANITARY SEWER IMPROVEMENTS-PHASE 2 RFB-26-52921

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Marietta
ContactsNo contacts available
OfficeN/A
Organization / AgencyGeorgia → City of Marietta
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of 12-inch ductile iron pipe (DIP) sanitary sewer lines at varying depths requiring deep excavation and specialized joining techniques.

More opportunities from Georgia → City of Marietta

Same awarding agency

NAICS: 236220
New
SLED
Design Build for Dumpster Enclosure @ 90 Hansell Street
Solicitation # RFP-27-54174
The City of Marietta is soliciting proposals for a design-build project to construct a dumpster enclosure at 90 Hansell Street, Georgia. The project involves the demolition of existing asphalt, concrete curbs, and brick paving to install a new concrete slab, footings, and entry approach ramps. The enclosure must accommodate up to nine 8-yard front-load dumpsters and be constructed using concrete masonry units with a brick facade and split face block to align with the architecture of Marietta Square. Bidders are required to provide two separate quotes based on dimensions of 13'W x 60'L x 10'H and 13'W x 54'L x 10'H. The contractor is responsible for all permits and must employ a licensed architect to stamp the design, using the existing enclosure at 25 Winter Street as the quality and design standard. The anticipated construction start date is January 4, 2027, with a required completion timeframe of 90 days from the notice to proceed. Proposals will be evaluated based on overall project cost (30%), project duration and timeline (20%), concept renderings (20%), previous experience (15%), and references (15). Submission requirements include a conceptual sketch, proof of valid occupational and contractor licenses, and a bid bond or cashier's check for 5% of the total bid amount. Upon award, the contractor must provide performance and payment bonds for the full contract amount. All work must comply with OSHA, EPA, and Georgia state regulations, and the City of Marietta must be named as an additional insured on all insurance policies.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 13 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS