Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on December 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

UPPER ER SANITARY SEWER IMPROVEMENTS-PHASE 2 RFB-26-52921

Closed
PE-63363-NONST-2026-000000028State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables encompass the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with new gravity sewers, manholes, stormwater facilities, and site grading. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran, service-disabled veteran, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide a performance bond, a payment bond, and proof of insurance from companies with an A.M. Best rating of A-VII or better. Compliance with North Carolina Administrative Code regarding Minority and Women-Owned Business requirements is mandatory, requiring the submission of a Good Faith Efforts Form and Table A. Project administration is managed by Willis Engineers on behalf of the City of Belmont, with payments processed via Applications for Payment due 30 days after presentation to the owner. Work must adhere to various industry standards, including AWWA Specification C-600 for pipelines and NEMA standards for electric motors.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 3 days
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project, with a submission deadline of November 12, 2026, at 2:00 pm via the City's e-Procurement Portal. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additional requirements involve the demolition of existing facilities and the relocation of a fuel tank. The project must be completed within 610 calendar days following the Notice to Proceed and must adhere to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is actively seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation factors including bidder qualifications, past project experience, and management plans. Key contractual terms include a 5% retainage on progress payments and liquidated damages of $1,000 per calendar day. Compliance with the Davis-Bacon Act, American Iron and Steel requirements, and OSHA standards is mandatory. The successful bidder must provide performance and payment bonds equal to 100% of the contract amount and file required insurance within 15 days of the award.
WG Construction Co., Inc.

POSTED

about 1 hour ago

DEADLINE

in 3 days
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project is located in California and seeks quotes from subcontractors and suppliers for various scopes of work, including aggregate supply, asphalt paving, electrical work, and pipe supply. The solicitation is set aside for SBA certified Women-Owned Small Businesses and encourages Disadvantaged Business Enterprise participation. Bids must be submitted via email or fax to Veronica Garcia by the deadline of December 3, 2026, and must remain valid for 120 days. All participating subcontractors are required to maintain valid California contractor licenses and be registered with the California Department of Industrial Relations per Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance standards. Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursable up to a maximum of 3 percent of the contract value. All bonds must be issued by a surety authorized to operate within the State of California.
Flatiron Dragados Constructors, Inc.

POSTED

about 1 hour ago

DEADLINE

in 26 days

General Info

Documents

12
PDF, High priority: read this firstbid-form
High
PDF, High priority: read this firstaddendum
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstaddendum
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstaddendum
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, Low priorityspecial-notice
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jan 23, 2026 to Jan 16, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Marietta
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Marietta
Office AddressN/A
Contacts
JOSHUA BECKER

Full Description

Show more
The principal items of construction are the following: 2,450 LF 12¿ DIP Sanitary Sewer (Open Cut), 532 LF Pipe Burst Existing 8¿ Pipe to 12¿ HDPE Sanitary Sewer, 811 LF Pipe Burst Existing 10¿ Pipe to 12¿ HDPE Sanitary Sewer, 60 LF 24¿ Steel Casing (Open Cut), 26 Sanitary Sewer Manholes to be Replaced or Rehabilitated (232 VF Total), Bypass Pumping, Site Restoration. Plans, specifications and contract documents are open to public inspection at the office of AtkinsRealis 1600 Riveredge Pkwy NW Ste 700 Atlanta, GA 30328. Only a bid submitted by a contractor on record with the Engineer as having received plans & bid documents from the engineer will be opened.

More opportunities from Georgia → City of Marietta

Same awarding agency

NAICS: 236220
New
SLED
Design Build for Dumpster Enclosure @ 90 Hansell Street
Solicitation # RFP-27-54174
The City of Marietta is soliciting proposals for a design-build project to construct a dumpster enclosure at 90 Hansell Street, Georgia. The project involves the demolition of existing asphalt, concrete curbs, and brick paving to install a new concrete slab, footings, and entry approach ramps. The enclosure must accommodate up to nine 8-yard front-load dumpsters and be constructed using concrete masonry units with a brick facade and split face block to align with the architecture of Marietta Square. Bidders are required to provide two separate quotes based on dimensions of 13'W x 60'L x 10'H and 13'W x 54'L x 10'H. The contractor is responsible for all permits and must employ a licensed architect to stamp the design, using the existing enclosure at 25 Winter Street as the quality and design standard. The anticipated construction start date is January 4, 2027, with a required completion timeframe of 90 days from the notice to proceed. Proposals will be evaluated based on overall project cost (30%), project duration and timeline (20%), concept renderings (20%), previous experience (15%), and references (15). Submission requirements include a conceptual sketch, proof of valid occupational and contractor licenses, and a bid bond or cashier's check for 5% of the total bid amount. Upon award, the contractor must provide performance and payment bonds for the full contract amount. All work must comply with OSHA, EPA, and Georgia state regulations, and the City of Marietta must be named as an additional insured on all insurance policies.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS