Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Sanitary Sewer Pipe Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Sanitary Sewer Pipe Replacement involves the removal and replacement of 42 linear feet of 12 inch diameter damaged sewer piping for prime contractors on Gary Sanitary District projects. The scope of work includes the reinstatement of active house laterals and drainage pipes, as well as necessary dewatering. The contractor is responsible for the field verification of the size, depth, and location of all sewers and manholes to ensure accurate installation. The project is categorized under NAICS code 237110 and is managed by the Engineering agency in Indiana. Interested parties must submit their responses by the deadline of October 1, 2026, following the posting date of September 28, 2026. The final deliverable consists of the successfully installed sewer pipe and fully reinstated laterals.

General Info

Subcontract for replacing 42 feet of sewer piping in Indiana by October 2026.

Documents

This scope was carved out of 2026-RFP-056.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

EMERGENCY SANITARY SEWER REPAIR AT 8237 LAKE SHORE DRIVE

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIndiana → Engineering
ContactsNo contacts available
OfficeN/A
Organization / AgencyIndiana → Engineering
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs removal and replacement of damaged sewer piping for prime contractors on Gary Sanitary District projects. Removes and replaces 42 LF of 12" Ø pipe, reinstates active house laterals and drainage pipes, and performs dewatering. Requires field verification of size, depth, and location of sewer and manholes. Delivers installed 12" Ø sewer pipe and reinstated laterals.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, along with the excavation of cobbles and large boulders. This solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned, minority, and woman-owned enterprises, with a bid deadline of September 29, 2026. James W. Fowler Co. is actively encouraging M/W/DBE participation and offering assistance with bonding, insurance, and lines of credit to qualified subcontractors.
James W. Fowler Co.

POSTED

about 7 hours ago

DEADLINE

in about 1 hour
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies, along with the abandonment of existing mains on Walnut Street, Ebony Lane, and 247th Place. W.A. Rasic Construction Company is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. The response deadline for these quotations is October 19, 2026, at 1:00 PM. Eligible subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. The solicitation specifically encourages participation from DBE, MBE, WBE, and SBE firms, including the use of consortia for larger contract portions. Selected subcontractors will be required to execute a standard subcontract agreement and meet general insurance requirements. Additionally, W.A. Rasic Construction Company may require payment and performance bonds totaling 100 percent of the subcontractor bid, with bond premiums reimbursed up to a maximum of 1.5 percent. Matt Metoyer serves as the primary point of contact for this solicitation.
W.A. Rasic Construction Company

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Indiana → Engineering

Same awarding agency

NAICS: 237110
New
SLED
EMERGENCY SANITARY SEWER REPAIR AT 8237 LAKE SHORE DRIVE
Solicitation # 2026-RFP-056
Solicitation 2026-RFP-056, issued by the Gary Sanitary District on September 28, 2026, seeks a lump sum proposal for emergency sanitary sewer repairs at 8237 Lake Shore Drive in Gary, Indiana. The scope of work includes the removal and replacement of approximately 42 linear feet of 12-inch PVC SDR 35 pipe, the installation of cured-in-place internal pipe patches, and 1,158 linear feet of CIPP lining from Manhole No. 4402 to Manhole No. 4417. The project requires strict adherence to the City of Gary Sewer and City Infrastructure Standards and Specifications Manual, with a mandate that work be completed within 60 days of the Notice to Proceed. Key technical requirements include pre- and post-work CCTV inspections conducted to NASCO standards and the use of CIPP liners conforming to ASTM F1216, F1743, D790, and D638. Contractors must provide a one-year roadway guarantee and submit a project schedule, subcontractor list, and wage rate sheets prior to starting work. Compliance is mandatory regarding City of Gary Ordinance No. 6972 and GSD Resolution No. 2113, with a strong emphasis on diversity certifications and local hiring. Proposals are due by October 1, 2026, at 2:00 p.m. via the OpenGov portal. Failure to submit required weekly certified payrolls or compliance documentation may result in the withholding of payments.
Water and Sewer Line and Related Structures Construction

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS