Sanitary Sewer Pipe Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Sanitary Sewer Pipe Replacement involves the removal of existing sewer lines and the installation of new sanitary sewer piping for prime contractors on Gary Sanitary District projects. The scope of work includes the excavation of 160 linear feet of 12-inch pipe and the installation of 12-inch PVC SDR 35 pipe maintained at a 0.22% slope, along with the sealing of manhole penetrations. To ensure safety and stability, the contractor must utilize appropriate shoring, sheeting, and bracing equipment. The project requires strict adherence to Spec Sections 02251, 02316, 02317, 02500, and 02507, with the final deliverable being a fully installed and mandrel-tested sewer line. This opportunity falls under NAICS code 237110 and was posted on October 21, 2026, with a response deadline of November 5, 2026.

General Info

Subcontract for replacing 160 linear feet of sanitary sewer pipe for Gary Sanitary District.

Documents

This scope was carved out of 2026-RFP-062.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Request for Quotes Sanitary Sewer Repair 2708 Monroe Street

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIndiana → Engineering
ContactsNo contacts available
OfficeN/A
Organization / AgencyIndiana → Engineering
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs the removal of existing sewer lines and installation of new sanitary sewer piping for prime contractors on Gary Sanitary District projects. Excavates 160 LF of 12-inch pipe, installs 12-inch PVC SDR 35 pipe with 0.22% slope, and seals manhole penetrations. Utilizes shoring, sheeting, and bracing equipment. Complies with Spec Sections 02251, 02316, 02317, 02500, and 02507. Delivers installed and mandrel-tested sewer line.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves critical wastewater infrastructure upgrades for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive improvements to the Morgans Branch Pumping Station. Key station upgrades entail the installation of a new wet well, valve vault, and associated appurtenances, alongside the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and supporting site improvements such as stormwater facilities, fencing, and landscaping. The estimated project value is 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must adhere to strict submission requirements, including the use of prescribed EJCDC forms and the provision of bid security. The project mandates specific socioeconomic goals, including a 10 percent combined MBE/WBE participation goal for the State of North Carolina and separate EPA goals of 10.9 percent for MBE and 10.4 percent for WBE. Performance and payment bonds are required, and insurance providers must maintain an A.M. Best rating of A-VII or better. Contract administration is governed by EJCDC standard general and supplementary conditions. Payments are processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. The project includes liquidated damages of 1,000 dollars per day for delays in reaching both substantial and final completion. Quality assurance is managed through site inspections by the Engineer and independent testing laboratories, with specific adherence to NEMA and ASTM standards for motors and masonry.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing and restoration, as well as the relining, modification, or replacement of small and large diameter steel and ductile iron pipes and associated supports. Additional requirements include the installation or replacement of valves, piping appurtenances, and the operation of a temporary 11 MGD pumped bypass. The project also encompasses the rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Requested services and supplies specifically include lead abatement, metals fabrication, painting and coatings, electrical and instrumentation, trucking and hauling, and bypass pumping. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the general bid date following on November 18, 2026. Submissions must utilize Garney Standard Purchase Order and Subcontract documents, and any exceptions must be provided as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 26 days
View Details

More opportunities from Indiana → Engineering

Same awarding agency

New
SLED
Request For Quotes Sanitary Sewer Lining at 8535 Lakewood Avenue
Solicitation # 2026-RFP-060
Solicitation 2026-RFP-060, issued by the Gary Sanitary District on October 21, 2026, seeks proposals for Cured-in-Place Pipe (CIPP) lining of 15-inch diameter sanitary sewer pipes at 8535 Lakewood Avenue in Gary, Indiana. The scope of work involves lining three specific sections: 1,219 linear feet from Manhole 4494 to 4488, 654 linear feet from Manhole 4486 to 4469, and 52 linear feet from Manhole 4486 to 4487. The project includes detailed invert depth specifications for manholes ranging from 12.4 to 33.0 feet. Work must be completed within 60 days of the Notice to Proceed, and the selected contractor must be able to commence work immediately. The contract will be awarded based on the lowest price, provided the contractor meets all mandatory requirements. These include possessing a Vector truck, CCTV Televising truck, Boiler truck, and Refrigerator truck, as well as providing a Certificate of Insurance and valid business and contractor licenses. Proposers must submit a lump sum bid via the OpenGov portal by November 5, 2026, and must sign a compliance memo regarding City of Gary ordinances and GSD resolutions to be deemed responsive. Technical requirements include adhering to ASTM F1216 and NASCO standards for CCTV video, which must be submitted to the Engineering Department for final acceptance. Additional requirements include weekly certified payrolls, diversity certifications, and the procurement of necessary stormwater, street closing, and road cut permits.

POSTED

about 21 hours ago

DEADLINE

in 14 days
View Details
New
SLED
Request for Quotes Sanitary Sewer Repair 2708 Monroe Street
Solicitation # 2026-RFP-062
Solicitation 2026-RFP-062 is a request for quotes from the Gary Sanitary District for the repair of a sanitary sewer located at 2708 Monroe Street in Gary, Indiana. The project requires a contractor to furnish all labor, materials, and equipment to remove and replace approximately 160 linear feet of 12-inch diameter pipe with 12-inch PVC SDR 35 between Manhole No. 272 and Manhole No. 272A. The scope includes restoring all disturbed driveways, sidewalks, and landscaping, as well as performing specific pavement restoration according to City of Gary and INDOT standards. Technical specifications require a minimum uniform pipe slope of 0.22% and that new piping extends four inches into the inner surface of existing manholes. The contract is awarded on a lump sum basis, with a performance period of 60 days starting immediately upon the issuance of the Notice to Proceed. Key deliverables include a pre-mobilization video of the work area, a project schedule, and a mandrel test upon completion conducted in the presence of GSD staff. The contractor must provide a one-year guarantee on pavement work and adhere to City of Gary Ordinance No. 6972 and Gary Sanitary District Board of Commissioners Resolution No. 2113. Required submission documents include a certificate of insurance, valid contractor and business licenses, diversity certifications, and weekly certified payrolls. Proposals are due by November 5, 2026, via the OpenGov portal.

POSTED

about 21 hours ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS