Santa Paula Creek Flood Risk Management Facility 2026 Emergency Sediment Removal Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ventura County Watershed Protection District is initiating the Santa Paula Creek Flood Risk Management Facility 2026 Emergency Sediment Removal Project in Santa Paula, California. This emergency project is a response to excessive sediment accumulation caused by significant rainstorms in late 2025 and the heightened risk of debris flows and flooding forecasted for the 2026-2027 wet season. The primary objective is to remove up to 70,000 cubic yards of sediment across approximately 14 acres to maintain channel capacity, prevent the overtopping of facility banks, and protect adjacent residential and commercial properties and roads from flooding. The scope of work includes excavating sediment up to 12 feet deep over 3,900 linear feet of the channel and clearing sediments from the fish ladder over 800 linear feet to ensure proper connectivity. Operations will involve the use of temporary stream crossings and earthen coffer dams to allow for dry excavation, with all removed materials transferred to a designated stockpile location. To mitigate environmental impact, qualified biologists will conduct daily surveys and relocate aquatic organisms, and work will be scheduled outside of bird nesting seasons. The project is estimated to take 90 working days and has been filed as an emergency project exempt under the California Environmental Quality Act.

General Info

Emergency sediment removal in Santa Paula to prevent flooding and protect local properties.

Agency

California → Ventura County Watershed Protection District

Place of Performance

Santa Paula, CA, 93060

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Ventura County Watershed Protection District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Ventura County Watershed Protection District
Office AddressN/A
Contacts
Dominic TyburskiAssistant Director

Full Description

Show more
Excessive sediments accumulated within the downstream portion of the Santa Paula Creek Flood Risk Management Facility (Facility), constructed by the U.S. Army Corps of Engineers and maintained by the Ventura County Watershed Protection District (VCWPD), due to the significant rainstorms that occurred late December 2025. The Governor of California issued a Proclamation of a State of Emergency (SOE) on December 24, 2025, and a follow-up on April 17, 2026, clarifying that “the Office of Emergency Services has validated additional damages and costs attributable to the Late December 2025 Storms, including…flooding and a heightened risk of debris flows and mudslides in Ventura County”. In addition, the National Oceanic and Atmospheric Administration issued an El Niño Advisory, clarifying on September 10, 2026, that “During the October-December 2026 season, there is a 75% chance of a historic event that would exceed the strength of previous El Niño events dating back to 1950.” In response, the Governor issued another SOE on September 21, 2026, for the 2026-2027 wet season. To address these risks, VCWPD proposes the Santa Paula Creek Flood Risk Management Facility 2026 Emergency Sediment Removal Project (Project), which will remove up to 70,000 cubic yards of sediment. Between the railroad and just upstream of the Santa Clara River confluence, the work would occur over up to 3,900 linear feet, weather and time permitting. An estimated maximum 12 feet of sediment depth would be removed from the channel, with the excavation depth gradually becoming shallower to daylight at the upstream end. The Project would maintain adequate capacity, prevent overtopping of the concreted rock riprap facility banks, prevent erosion of the east maintenance access road, and prevent undermining and flooding of adjacent commercial and residential properties and roads. The Project would also remove sediments accumulated within the fish ladder at the upstream end of the Facility, and would ensure suitable connection to the low flow channel immediately upstream and downstream of the fish ladder, as specified in the Facility’s Operations, Maintenance, Repair, Replacement, and Rehabilitation (OMRR&R) Manual. This work would occur over about 800 linear feet. Combined total work area within the Facility is up to 14 acres. All materials removed from the site would be transferred to the VCWPD stockpile location on uplands immediately west of the channel and south of Hwy 126. Work would include installation of temporary stream crossings utilizing six 40-ft-lengths of 3-ft-diameter pipes placed side by side to avoid operating heavy equipment in flowing water. Earthen coffer dams comprised of dry alluvium would be placed as needed to divert surface water and allow excavation of accumulated sediment under dry conditions. A team of qualified biologists would relocate aquatic organisms to suitable habitat within flowing water before, during, and immediately following each diversion. Proposed work may take about 90 working days to complete. The work area is currently largely devoid of mature vegetation due to the scouring flows received during the previous three winter storm seasons. Biological surveys would be conducted before work and each morning during work activities to identify and avoid or relocate sensitive biological resources. Work would occur outside the bird nesting season. The temporary diversion channels and final graded channel would be configured to allow successful fish passage. Boulders would be placed in the final channel with guidance from qualified biologists to provide resting areas and cover for aquatic species.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
9585 - Castle Creek Channel Improvements at Warner Park
Solicitation # 9585
The City of Madison is soliciting bids for contract 9585, project 13863, to perform the Castle Creek Channel Improvements at Warner Park in Dane County, Wisconsin. The scope of work involves reconstructing an existing concrete lined channel by lowering and widening the channel from Sherman Avenue to Warner Lagoon, implementing storm sewer improvements, and performing native plant restoration. The project includes the potential removal, salvage, and reinstallation of existing bridges following final grading and riprap placement. Contractors must adhere to various environmental permits, including authorizations from the US Army Corps of Engineers, the WDNR for hydrologic restoration and storm water construction, and the City of Madison for erosion control. Bidders must be prequalified, specifically in category 246 for Ecological Restoration, or utilize a prequalified subcontractor for related work items. The contract is designated as a Best Value Contract for multi-trade bids equal to or greater than 386,500 dollars. A 5 percent bid bond is required, and the project carries a Small Business Enterprise goal of 12 percent. Awardees must provide payment and performance bonds and comply with the City of Madison Affirmative Action Ordinance. Performance is subject to strict quality standards, including a one-year guarantee on seeded areas and compliance with Wind Sock Standards for erosion control. Failure to comply with specific contract articles may result in liquidated damages of 0.5 percent of the award price per week, capped at 5 percent or 10,000 dollars. Grant funds for the project are administered on a reimbursement basis.
City of Madison

POSTED

2 days ago

DEADLINE

in 11 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS