Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Sausalito Sewer Collection System Rehabilitation Project

Active
20260930018State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sausalito Sewer Collection System Rehabilitation Project, managed by the Sausalito-Marin City Sanitary District in Sausalito, California, is a construction effort to rehabilitate sanitary sewer mains and associated infrastructure. The scope of work includes the use of pipe bursting and open cut methods to install 6.63-inch to 12.75-inch HDPE DR17 or PVC C900 pipes, as well as manhole rehabilitation involving sealing and coating with a minimum 250 mil flexible polyurethane. Additional requirements include sag and spot repairs, manhole frame and cover replacements, lateral reconnections, and the legal disposal of Asbestos Cement Pipe. The project necessitates pre- and post-construction CCTV inspections, potholing, and the restoration of damaged pavement and landscaping, all while maintaining continuous facility operations. The estimated project cost is 2.5 million dollars with a performance period of 400 calendar days. Bids are due by 2:00 p.m. on October 22, 2026, and will be awarded to the lowest responsive and responsible bidder. Qualified bidders must hold a valid California Contractor's License and registration with the Department of Industrial Relations, and must provide certifications regarding the Iran Contracting Act and VOC regulations. The contract requires a bid bond, as well as performance and material and labor payment bonds for 100 percent of the contract price. Payment is processed via progress payment requests with a 30-day payment term following the receipt of undisputed requests.

General Info

Sausalito sewer rehabilitation project, $2.5 million budget, 400-day term, bids due October 2026.

Documents

1

Sausalito Sewer Collection System Rehabilitation IFB

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sausalito-Marin City Sanitary District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The Sausalito Sewer Collection System Rehabilitation Project involves the rehabilitation of sanitary sewer mains through pipe bursting and open cut methods, using 6.63-inch to 12.75-inch HDPE DR17 or PVC C900 pipes. Key work items include manhole rehabilitation, sealing, and coating with flexible polyurethane, sag and spot repairs, manhole frame and cover replacements, lateral locations and reconnections, and all necessary appurtenances to ensure a complete and operational system. The project also requires pre- and post-construction CCTV inspections, potholing of existing laterals and utility mains, and legal disposal of Asbestos Cement Pipe (ACP). Contractors must secure all necessary permits and business licenses, restore damaged landscaping and pavement, and test all rehabilitated pipes and manholes. The scope emphasizes maintaining continuous operation of existing facilities, traffic control, and adherence to environmental regulations.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified DBE, MBE, and WBE firms across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026. Primary contact for this opportunity is Christina Pauls in the estimating department.
GSE Construction Co., Inc.

POSTED

about 7 hours ago

DEADLINE

in 17 days
View Details

More opportunities from California → Sausalito-Marin City Sanitary District

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS