SB001-27 Demolition of 225 Langley Drive

Closed
PE-66751-NONST-2027-000000097State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contractor is responsible for the complete demolition and removal of all structures and site features at 225 Langley Drive in Lawrenceville, Georgia, including the convenience store building, underground and aboveground storage tanks, fueling canopy, dispenser islands, dumpster enclosure, grease trap, concrete parking lot, and all abandoned features, with the exception of the existing concrete entrance and driveway apron which must remain intact. The work must comply with the International Building Code, requiring perimeter security and continuous erosion control measures, including protection of stormwater inlets throughout the project. All disturbed areas must be properly graded with a minimum one percent slope to prevent water pooling, backfilled, compacted, and seeded with straw to stabilize the soil in accordance with the site plan. Upon demolition completion, concrete bin blocks must be installed at driveway locations. All demolition debris must be hauled away and disposed of in compliance with the Georgia Comprehensive Solid Waste Management Act of 1990 and Chapter 391-3-4 of the Georgia Rules for Solid Waste Management, ensuring proper recycling or landfill disposal. The contractor is required to adhere to the detailed boundaries and specifications outlined in the site plan and Phase I Environmental Assessment report, which provide additional context for the scope of work. The solicitation, identified as PE-66751-NONST-2027-000000097, was issued by the City of Lawrenceville under the Georgia state agency and has a response deadline of July 30, 2026. All inquiries should be directed to Chris Duncan at chris.duncan@lawrencevillega.org.

General Info

Demolish all structures at 225 Langley Drive except entrance, comply with codes, manage debris, and stabilize site per specifications.

Agency

Georgia → City of LawrencevilleView Agency

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(1)

Notice of Bid SB001-27 Demolition of 225 Langley Drive

PDFrfb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Lawrenceville
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → City of Lawrenceville
View Agency Profile
Office AddressN/A
Contacts

Full Description

Show more
The work to be performed by the Contractor consists of but is not limited to the following major items: 1. Secure the perimeter following International Building Code. Install erosion control measurements around jobsite including protection of stormwater intlets at all times.
2. All building structures and site features, including but not limited to floor slabs, drains, lifts, concrete sidewalks/footpaths, septic tanks (if any), debris, drums, containers, used aboveground storage tanks (ASTs), signs, junk, trash, the convenience store building, underground storage tanks (USTs), fueling canopy, fuel dispenser islands, dumpster enclosure and pads, grease trap, utility appurtenances, foundations, underground structures, trees, shrubs, and any other abandoned site features located inside or outside the main building area, shall be completely demolished and removed from the site. The existing concrete parking lot shall be demolished and removed, with the exception of the existing concrete entrance/driveway apron, which shall remain in place. (Refer to the site plan for the limits of demolition).
3. Disturbed area must be graded, backfilled & compacted, sloped in such a manner that the site does not retain water (around 1% grade). Seed and Straw must be applied after site disturbance. (Refer to site plan)
4. Once demolition is completed, Contractor should place concrete bin blocks at driveways.
5. All demolition debris must be removed and disposed of properly in an appropriate landfill or recycled in accordance with the provisions of the Georgia Comprehensive Solid Waste Management Act of 1990 and the Georgia Rules for Solid Waste Management Chapter 391-3-4.
6. See additional information in the Site Plan and Phase I Environmental Assessment report.

More opportunities from Georgia → City of Lawrenceville

Same awarding agency

NAICS: 237310
SLED
SB011-27 822 Leonard Court Sinkhole Repair
Solicitation # SB011-27
The City of Lawrenceville, Georgia, is soliciting competitive sealed bids for the 822 Leonard Court Sinkhole Repair project, identified as solicitation SB011-27. The scope of work requires a general contractor to provide all labor, equipment, and materials for traffic control following MUTCD standards, erosion control using best management practices such as silt fences and portable concrete washouts, and comprehensive site work including the demolition of asphalt and curb and gutter, grading, and excavation. Additionally, the contractor will be responsible for the installation of asphalt paving and the construction of concrete curb and gutter. The project must commence within ten days of the Notice to Proceed and be fully completed within 30 consecutive calendar days. Award will be granted to the lowest responsive and responsible bidder. To be considered, bidders must provide a statement of equipment, a non-collusion affidavit, and a statement of qualifications. Corporations not chartered in Georgia must provide certification of authorization to do business within the state. The contractor is required to maintain surety and insurance companies with an AM Best rating of A- 5 or greater and must comply with the Occupational Safety and Health Act of 1970 and Equal Employment Opportunity regulations. Precision Planning, Inc. serves as the architect for the project. Payment will be issued by the City of Lawrenceville within 30 days of receipt of a payment request.
Highway, Street, and Bridge Construction

POSTED

16 days ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS