Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on June 6, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SB039-24 King Arthur Drive Drainage Repair Project

Closed
PE-66751-NONST-2024-000000026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves comprehensive demolition and removal work at the King Arthur Drive site, including the removal of the existing headwall, rip rap, curb and gutter, storm pipes, concrete flume, fencing, and a shed. The project also encompasses installation of erosion control measures, new storm drainage infrastructure such as storm pipes, junction boxes, catch basins, grate inlets, and headwalls with rip rap, followed by cleanup and re-grouting of structures. Additionally, the work includes replacing residential concrete driveways, installing a new concrete flume, milling and overlaying the asphalt roadway, and restoring disturbed areas with sod or mulch. All equipment and materials will be supplied by the contractor and installed according to the project drawings and specifications, adhering to federal, state, and local regulations, with the Georgia Department of Transportation's latest standards governing construction. Traffic control responsibilities rest with the general contractor. The project, titled SB039-24 King Arthur Drive Drainage Repair, is managed by the City of Chamblee, Georgia, with a contract value estimated between $500,000 and $1,500,000. The solicitation was posted on June 6, 2024, with a response deadline of July 10, 2024, and the primary contact is Chris Duncan.

General Info

Agency

Georgia → City of Chamblee

Place of Performance

GA, USA

Set-Aside

NONE

Documents

1

SB039-24 King Arthur Drive Drainage Repair Project Bid Documents

PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 66751 LAWRENCEVILLE, PE-66751-NONST-2024-000000026 to PE-66751-NONST-2024-000000026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Chamblee
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → City of Chamblee
Office AddressN/A

Full Description

Show more
¿ Complete Demolition and removal of existing headwall and rip rap. ¿ Demolition includes remove and replace curb & gutter, tree removal, milling asphalt, sawcut and remove asphalt and concrete, remove storm pipes and structures, remove existing concrete flume, remove and replace fencing, relocate shed. ¿ Installation of erosion control BMP¿s. ¿ Install new storm pipes and tie-in to existing storm drain structures including stone bedding, backfill up to spring elevation with # 57 stone. ¿ Installation of new precast junction boxes, catch basins, grate inlets, and headwalls with rip rap. Cleanup and re-grout structures. ¿ Replace residential concrete driveways, install proposed concrete flume, mill and overlay asphalt roadway. ¿ Installation of sod/mulch on areas disturbed by construction activities. ¿ The equipment and materials to be furnished by the Contractor will be installed at the locations shown on the drawings and as described in the respective sections of these specifications. ¿ All work shall comply with all Federal, State, and local requirements and specifications. ¿ The latest GDOT Standard Specifications for Road and Bridge Construction of the Georgia Department of Transportation, shall govern the construction of this project ¿ Traffic control is to be proviced by General Contractor.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS