Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

SBA Taxiways E, A3, and A5 Pavement Reconstruction Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The SBA Taxiways E, A3, and A5 Pavement Reconstruction Project, managed by the City of Santa Barbara, involves comprehensive pavement repairs and infrastructure upgrades at the Santa Barbara Municipal Airport. The scope of work includes a full-depth reconstruction of approximately 1,700 feet of Taxiway E to reshape its geometry and improve safety for large commercial aircraft, a 200-foot mill and fill rehabilitation for Taxiway A3, and a protective seal coat for the entire 300-foot length of Taxiway A5. To support the expanded impervious pavement on Taxiway E, the project includes the installation of new gravel-based infield stormwater infiltration trenches. Additionally, the modifications to Taxiway E will necessitate the relocation of taxiway edge lights, buried electrical conduits, and adjustments to the existing storm drain piping and infrastructure.

General Info

City of Santa Barbara pavement reconstruction and infrastructure upgrades at Santa Barbara Municipal Airport.

Agency

California → City of Santa Barbara

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Fairview Avenue and Moffett Place, Santa Barbara, CA, 93117

Set-Aside

NONE

Documents

(1)

166 - 42-08242026-166 NOE SBA Taxiways E, A3 and A5 Pavement Reconstruction Project

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Barbara
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Santa Barbara
Office AddressN/A
Contacts
Jessica MetzgerAirport Planner

Full Description

Show more
This Project consists of four different parts; Taxiway E “Echo”, Taxiway A3 “Alpha Three”, Taxiway A5 “Alpha Five”, and infield stormwater infiltration trenches. The three taxiways at the Santa Barbara Municipal Airport (Airport) require varying levels of large-scale pavement repairs to restore the asphalt concrete pavement to like new condition. Taxiway E will undergo a full-depth reconstruction for approximately 1,700 feet in length. During the reconstruction process, the Airport will reshape the geometry of Taxiway E, therefore expanding the amount of impervious pavement to enhance the safety and circulation of large commercial aircraft in the area south of the Airport terminal. Taxiway A3 will require a mill (grind) and fill (repave) rehabilitation, less intrusive than reconstruction, for a portion of the total taxiway, approximately 200 feet in length. Taxiway A5 has the most minimal pavement rehabilitation planned that only requires a protective seal coat applied to the taxiway surface for the whole length of the taxiway, approximately 300 feet. In response to the expansion of impervious pavement, the Airport will also add new infield stormwater infiltration trenches, primarily constructed of gravel, to encourage slow stormwater infiltration into the surrounding soils. Changes to the geometry of Taxiway E will also require relocation of taxiway edge lights along with its buried electrical conduit and modifications to the buried storm drain piping and infrastructure.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
David C. McCollom WTP Membrane Basin Rehabilitation
Solicitation # david-c-mccollom-wtp-membrane-basin-rehabilitation
Kiewit Infrastructure West Co. is soliciting quotes for the David C. McCollom WTP Membrane Basin Rehabilitation project located in California. The scope of work includes a variety of services such as demolition, concrete rehabilitation, metals, painting and coating, mechanical insulation and testing, adjusting and balancing, and dumpster or trash services. Interested firms must contact Kiewit to receive an official Invitation to Bid through the Building Connected system. This solicitation includes set-asides for various small business categories, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone Small Businesses, Veteran-Owned Small Businesses, and Disadvantaged Business Enterprises. To be considered a responsive bidder, firms must hold a valid California Contractor’s license appropriate to their trade and provide acceptable insurance coverage. Responsible subcontractors and material contractors are required to provide bonding for 100% of their contract value, though Kiewit will reimburse the bond premiums. Additionally, Kiewit is a signatory to several collective bargaining agreements involving carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. The deadline for responses is September 1, 2026, and further inquiries regarding project specifics, scheduling, or materials should be directed to the Lead Estimator.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 7 days
View Details