SBD 247 Seal Coat
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves applying a rubberized chip seal coat with a flush coat across the entire width of Route 247 from postmile 22.1 to 39.0 in San Bernardino County, California, with additional pavement rehabilitation through the replacement of defective asphalt concrete sections. This maintenance effort is designed to extend the service life of the roadway, enhance surface durability, and maintain safe travel conditions using standard Caltrans District 8 procedures. The work is located within previously developed areas and is exempt from environmental review under CEQA Class 1, as it constitutes routine pavement maintenance with no significant environmental impact. The project is managed by Caltrans, District 8, with Hannah Duarte serving as the primary point of contact. Although the solicitation is listed as a forecast and not a formal procurement notice, the activity is intended for implementation under existing Caltrans frameworks, with no specified contract value, pricing details, or formal evaluation criteria outlined in the available documentation. Performance is limited to the defined corridor along Route 247, and delivery or completion timelines are not provided, indicating the project may proceed under a scheduled maintenance program without a formal bid process currently active. No standard FAR clauses, packaging requirements, inspection protocols, invoice procedures, or contracting officer representatives are explicitly detailed in the materials, and there are no indications of subcontracting plans, socioeconomic set-asides, or offeror certifications. The absence of formal contract clauses, payment information, or technical specifications suggests the document serves as a preliminary notice rather than a complete solicitation, with implementation pending further action by Caltrans under its internal processes. Environmental compliance is confirmed via a certified exemption filing, and while the work area is well-defined, logistical details such as delivery terms, performance periods, and submission requirements remain unstated, leaving these elements to be determined through internal agency coordination rather than public procurement guidelines.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
