Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

SCADA and PLC Electrical Integration

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for SCADA and PLC Electrical Integration involves the installation of solar-powered mixing equipment and the execution of PLC programming for water reservoir projects managed by the Public Works Department of the City of Menlo Park. The scope of work includes programming the Programmable Logic Controller, updating alarm programs, and integrating sensors into the SCADA system to ensure a fully operational control system. All technical work must be performed in strict compliance with the California Electrical Code. Interested parties should note that the response deadline for this opportunity is December 3, 2026.

General Info

SCADA and PLC integration for Menlo Park water reservoirs, due December 3, 2026.

Documents

This scope was carved out of 2026-110526.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

BID - Reservoir No. 2 Roof Replacement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works Department of City of Menlo Park
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs solar-powered mixing equipment and performs PLC programming for prime contractors on City of Menlo Park water reservoir projects. Programs the Programmable Logic Controller (PLC), updates alarm programs, and integrates sensors into the SCADA system. All work must comply with the California Electrical Code. Delivers an operational solar mixing and SCADA control system.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
Inland Empire Job Corps-Request for Quote Electrical Repairs
Solicitation # inland-empire-job-corps-request-quote-electrical-repairs
Management & Training Corporation is seeking quotes for a subcontracting opportunity to perform electrical and fire alarm repairs at the Inland Empire Job Corps Center in San Bernardino, California. The scope of work includes installing GFCI protection for multiple receptacles in the cafeteria, culinary arts kitchen, and academic education building, repairing open-ground conditions, and correcting deficiencies in specific panelboards. Additionally, the contractor must install filler plates in panelboards, update and label circuit directories for several panels, and provide permanent legible labeling for feeder conductors and distribution equipment. All work must comply with the National Electrical Code, NFPA standards, and applicable federal, state, and local requirements. This solicitation is open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities under NAICS 238210. Bids must be submitted as a lump sum fee by November 12, 2026, and must include a bid sheet, a completed supplier packet with a W-9 and self-certification, three references for similar projects, and proof of insurance. Required insurance includes general liability with a minimum of 1 million dollars per occurrence and worker's compensation with employer's liability of at least 500,000 dollars. The award will be based on best value, and the selected contractor must adhere to Service Contract Labor Standards and various FAR clauses regarding security, privacy, and small business utilization.
Inland Empire Job Corps

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details
NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity for the installation of emergency shut-off switches on power tools at the Atterbury Job Corps Center in Edinburgh, Indiana, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The scope of work specifically requires the installation of two mushroom-head push-button emergency shut-off switches in the Facility Maintenance Shop, along with a new 60A, 208/120V, 3-phase, 4-wire, 6-circuit branch circuit panel featuring a 60A shunt-trip main circuit breaker. All work must comply with OSHA, EPA, and FNC guidelines, as well as applicable state and local codes, with Indiana regulations taking precedence if they are more stringent than federal requirements. The procurement is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Indiana Contractor's License. A mandatory site visit was scheduled for November 10, 2026, with a response deadline of November 20, 2026. Award will be based on best value, evaluated on a 100-point scale covering price (60), quality (20), past performance (10), and schedule (10). Contractors are required to maintain comprehensive insurance, including general liability of at least 1 million dollars per occurrence and automobile liability. Compliance with the Davis Bacon Act wage rates is mandatory. Payment terms are Net 30, and final payment is contingent upon the submission of certified payroll records, a completed SF 1413, and the release of liens. The contractor must provide a one-year guarantee on all workmanship starting from the date of substantial completion.
Atterbury Job Corps. – Adams & Associates

POSTED

about 2 hours ago

DEADLINE

in 13 days
View Details
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformer assets. The scope of work includes performing visual and infrared thermographic inspections on energized transformers, installing standardized external oil sampling devices to eliminate the need for internal compartment access, and conducting comprehensive oil testing analysis. Additionally, the selected contractor will evaluate nitrogen blanket systems, install monitoring instrumentation such as pressure and oil level gauges, provide on-site training for agency staff, and develop standard operating procedures for oil handling and sampling. Services will be performed across multiple agency locations, including RP-1, RP-2, RP-4, RP-5, CCWRF, and CDA. This is a fixed-pricing contract intended as a single award to the most capable offeror, with the possibility of multiple awards. Proposals are due by December 23, 2026, via PlanetBids. Evaluation criteria emphasize the contractor's experience with utilities or industrial facilities, their proposed staffing plan, and their ability to meet the project timeline. Key requirements include ASNT Level 1 certification for thermography and adherence to NETA MTS, IEEE, NFPA 70E, and ASTM D923 standards. The contract is designated as a Prevailing Wage Contract, requiring registration with the California Department of Industrial Relations. Contractors must maintain commercial general liability and auto liability insurance of at least 1,000,000 dollars per occurrence.
Inland Empire Utilities Agency

POSTED

about 2 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 238210
New
Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility
Solicitation # purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility-2
Axia Electric LLC is soliciting bids from SBE/DBE certified firms for the Eastern Municipal Water District's Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility Project in California. The scope of work is divided between the San Jacinto Valley Advanced Water Purification Facility and Brine Ponds, specifically requesting subcontractors for low voltage systems, fiber optics, and electrical materials and supply. Bids must be submitted by 2:00 PM on November 18th, with a final deadline of November 19th, 2026. Proposals should be sent to the lead estimator, Ryan Falk, and must include any lower-tier SBE/DBE participation information for evaluation. Qualified bidders must be registered to perform public work pursuant to Labor Code Section 1725.5 and Section 1771.1 (a) and must agree to abide by the AGC Master Labor Agreements and Axia's Standard Long Form Subcontract or Purchase Order. All proposers are bound by the prime contract terms, including payment provisions and strict insurance requirements. Minimum insurance coverage includes 1 million dollars for per occurrence General Liability, 2 million dollars for Aggregate and Completed Operations, 5 million dollars for Excess Liability, 1 million dollars for Auto Liability, and 1 million dollars for Workers Compensation and Employer Liability.
Axia Electric

POSTED

about 2 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves the inspection, testing, repair, and certification of emergency lighting systems to ensure compliance with NFPA 101 (2024 Edition) and NFPA 70 standards. The selected electrical contractor will be responsible for inventorying all fixtures, performing functional power-outage testing, applying durable tracking labels to fixtures, and integrating recurring maintenance into the facility's Computerized Maintenance Management System. The estimated contract value is between $25,000 and $100,000, with a required performance period of 30 business days following the Notice to Proceed. Bids are due by December 1, 2026, and must be submitted via email to Sandra Clore. Mandatory requirements for a responsive bid include a physical site visit and a bid bond of 20% for projects valued at $25,000 or more. Award decisions will be based on overall best value. The contract is subject to the Davis-Bacon Act, Federal Contractor Minimum Wage requirements, and various FAR clauses, including those regarding small business utilization and whistleblower rights. Awarded contractors must provide performance and payment bonds from a surety with at least an A- rating and submit a detailed cost breakout on company letterhead. Final acceptance is contingent upon a joint substantial completion inspection and the resolution of a final punch list.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 25 days
View Details

More opportunities from California → Public Works Department of City of Menlo Park

Same awarding agency

NAICS: 238160
New
SLED
BID - Reservoir No. 2 Roof Replacement Project
Solicitation # 2026-110526
The Reservoir No. 2 Roof Replacement Project, managed by the City of Menlo Park Public Works Department, involves the comprehensive replacement of the roof structure at 3650 Sand Hill Road. The scope of work includes the demolition of the existing timber and steel framed roof, membrane, and precast concrete columns, followed by the installation of new concrete sheer walls, footings, and various concrete repairs. Key deliverables include the design and installation of a complete aluminum roof system featuring ladders, walk pads, vents, and flashing, as well as a new membrane liner, solar-powered mixing equipment, and control updates including PLC programming. Additionally, the project requires reservoir cleaning, disinfection, and minor concrete repairs to the exterior of Reservoir No. 1. The contract will be awarded to the lowest responsive and responsible bidder, with a bid bond requirement of 10% of the total bid amount. Successful bidders must provide performance and payment bonds, with the performance bond covering 100% of the contract bid. The project is subject to California Department of Industrial Relations prevailing wage requirements and requires a comprehensive safety plan. Payment is structured on a lump sum basis for the aluminum roof structure and CSPE reservoir liner, with monthly invoicing and a 30-day payment term. Bidders must certify they are not under suspension or debarment and must possess a valid contractor's license at the time of bid opening.
Roofing Contractors

POSTED

2 days ago

DEADLINE

in 27 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS