Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Kentucky was posted on May 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SCADA System Design & Engineering Services

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 11 hours ago

DEADLINE

in 17 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 11 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

This contract involves conducting a thorough assessment of the existing SCADA system, focusing on evaluating current operations and identifying areas for improvement. It includes engineering the integration of new Programmable Logic Controllers (PLCs) to support the expansion of the DHL ramp, ensuring that the updated system aligns with operational requirements. In addition to implementation, the contract requires the development of comprehensive design documentation, including detailed architecture and network diagrams, to provide clear, structured guidance for the system setup and future maintenance. The opportunity is a subcontract under the NAICS code 541330, associated with planning and development efforts managed by an agency in Kentucky. The solicitation was posted on May 21, 2026, with proposals due by June 18, 2026. The contract emphasizes technical expertise in SCADA systems engineering and integration, offering a specialized role in enhancing infrastructure efficiency for a key logistics expansion project.

General Info

Assess SCADA system, integrate new PLCs, develop design documents for DHL ramp expansion.

Agency

Kentucky → Planning & DevelopmentView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

KY, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-035-RFP.

The full solicitation package (12 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Supervisory Control and Data Acquisition (SCADA) System Upgrades & Maintenance

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKentucky → Planning & Development
ContactsNo contacts available
OfficeN/A
Organization / Agency
Kentucky → Planning & Development
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Conduct assessment of existing SCADA system, engineer integration of new PLCs for DHL ramp expansion, and develop detailed design documentation including architecture and network diagrams.

More opportunities from Kentucky → Planning & Development

Same awarding agency

NAICS: 237990
SLED
Runway 18L/36R Tunnel Rehabilitation & Safety Improvements
Solicitation # 26-045-ITB
The Runway 18L/36R Tunnel Rehabilitation and Safety Improvements project, solicitation 26-045-ITB, is a comprehensive effort by the Kenton County Airport Board to restore the South Airfield Drive tunnel at the Cincinnati/Northern Kentucky International Airport. The project addresses critical structural deterioration, water infiltration, and outdated systems within the 1,250 linear foot reinforced concrete tunnel. The scope of work includes concrete slab, wall, and soffit repairs, waterproofing, and the replacement of expansion joints. Additionally, the project involves upgrading the electrical distribution, installing new LED lighting and controls, replacing ventilation exhaust fans and unit heaters, and enhancing fire protection, security, and technology systems. The overall goal is to ensure the tunnel remains operational for vehicular traffic while maintaining the structural integrity necessary to support air traffic on Runway 18L/36R. The contract is awarded to the lowest qualified bidder based on the summation of estimated quantities multiplied by unit bid prices. Bids were due by September 17, 2026, and must be submitted electronically. The project is subject to stringent federal and state regulations, including the Davis-Bacon Act for prevailing wages, Buy American requirements under 49 USC 50101, and ADA/ADAAG accessibility standards. Bidders are required to provide a 5% proposal bond and must submit extensive certifications regarding non-debarment, affirmative action, and tax delinquency. The total project cost is estimated at approximately 17 million dollars, with construction planned for early 2027 to accommodate long-lead equipment procurement and avoid holiday traffic disruptions. Quality control is the responsibility of the contractor, while quality assurance is managed by the owner and the Resident Project Representative.
Other Heavy and Civil Engineering Construction

POSTED

about 1 month ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS