Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 20, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Scott Road Gap Transmission Pipeline Project

Closed
1503WState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Scott Road Gap Transmission Pipeline Project involves the installation of approximately 800 linear feet of 30-inch steel transmission pipeline, along with smaller segments of 12-inch and 24-inch PVC pipelines, including all necessary appurtenances such as valves, thrust collars, blow-offs, air valves, and manway structures. The scope encompasses connecting to existing lines, installing shoring and bracing in compliance with California Labor Codes, and performing excavation, backfill, pavement removal and restoration, pipeline dewatering, disinfection, and traffic control measures. The work must adhere strictly to the specifications and contract drawings, with quantities provided as estimates that bidders are responsible for verifying through detailed design drawings to ensure accurate bid submissions. The project is managed by the Eastern Municipal Water District under the California agency, with a solicitation posted on March 20, 2024, and a response deadline set for April 17, 2024. The contract falls under NAICS code 336390, indicating a focus on other transportation equipment manufacturing, and involves a competitive bidding process without specified set-asides. The primary point of contact for inquiries is Jennifer Morgenstern, reachable via email or phone. The project emphasizes compliance with safety, environmental, and construction standards, and bidders are expected to review detailed design documents to accurately determine the scope and quantities involved.

Documents

5

1503W Construction Drawings for Scott Road Gap Transmission Pipeline

PDF, High priority: read this firstconstruction-drawings
High

Specification 1503W Scott Road Gap Transmission Pipeline Project NIB

PDF, High priority: read this firstnib
High

Specification 1503W Scott Road Gap Transmission Pipeline Project Proposal Package

PDF, High priority: read this firstrfp
High

Specification No. 1503W Scott Road Gap Transmission Pipeline Project

PDF, High priority: read this firstspecifications
High

Eastern Municipal Water District Bid Bond

PDF, Low prioritybid-bond
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Eastern Municipal Water District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
Under these Specifications the Contractor shall perform all work for the installation of approximately 800 linear feet of 30-inch CML&C steel transmission pipeline, 20 feet of 12-inch PVC C-900 pipeline, 1 foot of 24-inch PVC C-900 pipe, including all appurtenances and restraining of and connections to existing lines. Work shall include manway structure, thrust collars, valves, blow-offs, air valves, shoring and bracing per California Labor Codes, backfill, pavement removal, replacement and restoration per encroachment permits, trench and pipeline dewatering, disinfection, traffic control, and other related work. All work shall be in accordance with these specifications and the contract drawings. Quantities are approximate. Bidders are responsible to verify actual quantities from the detailed design drawings to accurately calculate quantity take-offs.

More opportunities from California → Eastern Municipal Water District

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS