THIS IS A COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL ITEMS PREPARED IN ACCORDANCE WITH THE FORMAT IN FAR SUBPART 12.6-STREAMLINED PROCEDURES FOR EVALUATION AND SOLICITATION FOR COMMERCIAL ITEMS-AS SUPPLEMENTED WITH ADDITIONAL INFORMATION INCLUDED IN THIS NOTICE. THIS ANNOUNCEMENT CONSTITUTES THE ONLY SOLICITATION; QUOTATIONS ARE BEING REQUESTED, AND A WRITTEN SOLICITATION DOCUMENT WILL NOT BE ISSUED. THE SOLICITATION IS BEING ISSUED USING SIMPLIFIED ACQUISITION PROCEDURES. This solicitation is a Request for Quotation (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2005-59. This is a 100% Small Business Set-Aside. The associated North American Industrial Classification System (NAICS) code for this procurement is 423930 with a small business size standard of 100 employees. Offerors must submit all questions concerning this solicitation in writing to
contact@example.gov Questions should be received no later than 6 calendar days after the issuance date of this solicitation. Any responses to questions will be made in writing, without identification of the questioner, and will be included in an amendment to the solicitation. All responsible offerors shall provide a quotation for the following line items: UNIT OF ISSUE UNIT PRICE LINE ITEM 0001 (BASE): 6/15/12 - 6/14/13 Hauling Rate Per Haul Statement of Work for Scrap Metal Services Background: The National Institute of Standards and Technology (NIST), located in Gaithersburg, MD, has an excess property program responsible for the reuse, recycle and disposition of equipment. This program produces over 500,000 pound of scrap metal each year. The NIST excess program is anticipated to expand in the coming years, with an anticipated increase in scrap of 200,000 to 300,000 pound per year. The NIST requires services to recycle the scrap metals produced. Specific Requirements: The contractor shall recycle 100% of the scrap metal produced, through the NIST excess program, at no cost to the government. The kinds of scrap metal are: scrap aluminum; stainless steel; light iron; tin. The contractor shall deliver 40 yard recycle containers, galore boxes, or hoppers to different locations within NIST. The main locations are near buildings 301 and 309 on the main campus and at the NIST annex (Nike site) located off of Muddy Branch Road. When contacted by an authorized NIST representative the contactor shall pick up the full container and deliver an empty container. The contractor shall be responsible for maintaining accurate weight records by type of scrap, the contractor shall provide a copies of the weight records to the NIST contracting officer's representative (COR). The contractor shall: 1. Within 48 hours of notification by an authorized NIST representative, the contractor shall perform the exchange of the full container with an empty container of like size. 2. Recycle the scrap metal from the NIST locations near 309 parking areas, building 301 and at the NIST annex (Nike site) located off of Muddy Branch road. There shall be no cost to the government for delivering or pick up of the recyclable containers. A rate for gross tonnage shall be negotiated for comingled scrap metal. For the other kinds of scrap metals the negotiated rate shall be by pound for each separate kind. 3. Under the Code of Federal Regulations (CFR) Title 41, Part 102-38, Section 295, NIST has the statutory authority to retain the proceeds from sales of these recyclables. The proceeds from these recyclables shall be mailed to: NIST, Administrative Services Division, Excess Recyclables Program, 100 Bureau Drive, MS 1920, Gaithersburg, MD 20899, Attn: Krista Faecke Invoicing and Due Dates The Contractor shall provide copies of the of all container exchanges including the weight and the type of metal recycled on a weekly and monthly basis as well as an annual consolidated report including the date, the weight, the type of metal recycled and the prices. Standards for invoicing acceptance: The Contracting Officer's Representative (COR) will provide comments on each invoice received within 5 calendars days from receipt of a given invoice. The invoice shall include total weights for the type of metal recycled the price. If any trash is found comingled with the recyclables it will be deducted from the total weight and a handling fee should be charged. The contractor shall make any needed changes within 3 calendar days from receipt of electronic or written comments from the COR. Period and Place of Performance: The period of performance shall be one (1) year after award of this requirement. The Government may elect to award up to four (4) 1-year options to continue the work specified in this requirement. New price rates shall be negotiated every option year. Performance will be on site at NIST, 100 Bureau Drive, Gaithersburg, MD campus, with the requirement to relocate to or operate from other locations in instances such as a disaster(s). Work shall be performed between the hours of 7:30 AM to 4:00 PM. Container Exchanges: The contractor will deliver or pickup containers during times the NIST campus is open. The contractor shall not deliver or pickup in the event of unplanned closure of the facility due to natural disasters, emergency, or severe weather. Also there shall be no deliveries or pick-ups on legal federal holidays: - New Year's Day, January 1st - Martin Luther King's Birthday, 3rd Monday in January - President's Day, 3rd Monday in February - Memorial Day, Last Monday in May - Independence Day, July 4th - Labor Day, 1st Monday in September - Columbus Day, 2nd Monday in October - Veteran's Day, November 11th - Thanksgiving Day, 4th Thursday in November - Christmas Day, December 25th GOVERNMENT-FURNISHED PROPERTY, DATA AND/OR INFORMATION All property, data and information provided by the Government in the performance of this task remains the property of the Government and shall be surrendered to the government upon completion or termination of this contract. Likewise, all deliverables generated under this requirement remain the property of the Government. The Government does not anticipate providing any property during the performance of this requirement. RISK ASSESSMENT The HSPD-12 Security Risk Level assigned to this contract is low risk. DELIVERABLES AND PAYMENT SCHEDULE The Contractor may invoice the Government upon receipt from the TIC that a given deliverable is of acceptable quality and that all other assigned tasks are up to date. CONTRACTOR'S MINIMUM QUALIFICATIONS The Contractor shall have at least three (3) years of experience in recycling scrap metal. GENERAL INFORMATION This work does not involve confidential or proprietary data. The certification and accreditation requirements of Clause 1352.239-73 do not apply and a security accreditation package is not required. The following Personnel are authorized to place call to the Contractor for dumpster exchange: Brett Whithworth Timothy Orr Bruce Connelly Patrick Murphy Angel Roman Misconduct or Disruption of Services: At any time during the performance period of this contract, the Contracting Officer, Technical Information Contact (TIC) or Operating Unit (OU) Director may request the Contractor employee be immediately removed from the premises if they determine, at their unilateral discretion, that any of the Contractor employee's actions or impaired state to be a disruption to the workforce. Safety: The Contractor employee shall be responsible for knowing and complying with all installation safety prevention regulations. Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal. Security: NIST is a restricted campus. An identification badge is required for access for entry into buildings and also is shown to the armed Security Police when entering the campus. Identification Badges: Contractor employees shall comply with NIST identification and access requirements. The Contractor employee is responsible for absences due to expired identification and access documents. Each Contractor employee shall wear a visible identification badge provided by the NIST Security Office. The badge must show the full name, title, and if required by NIST, the words "Contractor" in front. The Contractor employee shall turn in the NIST identification badge and vehicle pass to the TIC or Contracting Officer (CO) upon termination of their services under this contract. Vehicle Registration: All Contractor employees must register their vehicles with the NIST Security Office to gain access to the campus. A valid driver's license, Government-furnished civilian ID, proof of insurance and current registration must be presented to the NIST Security Office, at which time a NIST vehicle pass will be issued. The pass shall be displayed on the vehicle's rear view mirror in accordance with instructions. The Contractor employee shall follow NIST procedures for removal and turn-in of the vehicle pass upon termination of services under this contract. Media Inquiries: The Contractor employee shall not respond to any media inquiries. Any inquiries from the media shall be immediately relayed to the TIC and/or CO. There shall be no interviews, comments, or any other response to the media or the public without the knowledge and approval of the NIST Director. _______ LINE ITEM 0002 (BASE): 6/15/12 - 6/14/13 Price for scrap Per lb. Statement of Work for Scrap Metal Services Background: The National Institute of Standards and Technology (NIST), located in Gaithersburg, MD, has an excess property program responsible for the reuse, recycle and disposition of equipment. This program produces over 500,000 pound of scrap metal each year. The NIST excess program is anticipated to expand in the coming years, with an anticipated increase in scrap of 200,000 to 300,000 pound per year. The NIST requires services to recycle the scrap metals produced. Specific Requirements: The contractor shall recycle 100% of the scrap metal produced, through the NIST excess program, at no cost to the government. The kinds of scrap metal are: scrap aluminum; stainless steel; light iron; tin. The contractor shall deliver 40 yard recycle containers, galore boxes, or hoppers to different locations within NIST. The main locations are near buildings 301 and 309 on the main campus and at the NIST annex (Nike site) located off of Muddy Branch Road. When contacted by an authorized NIST representative the contactor shall pick up the full container and deliver an empty container. The contractor shall be responsible for maintaining accurate weight records by type of scrap, the contractor shall provide a copies of the weight records to the NIST contracting officer's representative (COR). The contractor shall: 1. Within 48 hours of notification by an authorized NIST representative, the contractor shall perform the exchange of the full container with an empty container of like size. 2. Recycle the scrap metal from the NIST locations near 309 parking areas, building 301 and at the NIST annex (Nike site) located off of Muddy Branch road. There shall be no cost to the government for delivering or pick up of the recyclable containers. A rate for gross tonnage shall be negotiated for comingled scrap metal. For the other kinds of scrap metals the negotiated rate shall be by pound for each separate kind. 3. Under the Code of Federal Regulations (CFR) Title 41, Part 102-38, Section 295, NIST has the statutory authority to retain the proceeds from sales of these recyclables. The proceeds from these recyclables shall be mailed to: NIST, Administrative Services Division, Excess Recyclables Program, 100 Bureau Drive, MS 1920, Gaithersburg, MD 20899, Attn: Krista Faecke Invoicing and Due Dates The Contractor shall provide copies of the of all container exchanges including the weight and the type of metal recycled on a weekly and monthly basis as well as an annual consolidated report including the date, the weight, the type of metal recycled and the prices. Standards for invoicing acceptance: The Contracting Officer's Representative (COR) will provide comments on each invoice received within 5 calendars days from receipt of a given invoice. The invoice shall include total weights for the type of metal recycled the price. If any trash is found comingled with the recyclables it will be deducted from the total weight and a handling fee should be charged. The contractor shall make any needed changes within 3 calendar days from receipt of electronic or written comments from the COR. Period and Place of Performance: The period of performance shall be one (1) year after award of this requirement. The Government may elect to award up to four (4) 1-year options to continue the work specified in this requirement. New price rates shall be negotiated every option year. Performance will be on site at NIST, 100 Bureau Drive, Gaithersburg, MD campus, with the requirement to relocate to or operate from other locations in instances such as a disaster(s). Work shall be performed between the hours of 7:30 AM to 4:00 PM. Container Exchanges: The contractor will deliver or pickup containers during times the NIST campus is open. The contractor shall not deliver or pickup in the event of unplanned closure of the facility due to natural disasters, emergency, or severe weather. Also there shall be no deliveries or pick-ups on legal federal holidays: - New Year's Day, January 1st - Martin Luther King's Birthday, 3rd Monday in January - President's Day, 3rd Monday in February - Memorial Day, Last Monday in May - Independence Day, July 4th - Labor Day, 1st Monday in September - Columbus Day, 2nd Monday in October - Veteran's Day, November 11th - Thanksgiving Day, 4th Thursday in November - Christmas Day, December 25th GOVERNMENT-FURNISHED PROPERTY, DATA AND/OR INFORMATION All property, data and information provided by the Government in the performance of this task remains the property of the Government and shall be surrendered to the government upon completion or termination of this contract. Likewise, all deliverables generated under this requirement remain the property of the Government. The Government does not anticipate providing any property during the performance of this requirement. RISK ASSESSMENT The HSPD-12 Security Risk Level assigned to this contract is low risk. DELIVERABLES AND PAYMENT SCHEDULE The Contractor may invoice the Government upon receipt from the TIC that a given deliverable is of acceptable quality and that all other assigned tasks are up to date. CONTRACTOR'S MINIMUM QUALIFICATIONS The Contractor shall have at least three (3) years of experience in recycling scrap metal. GENERAL INFORMATION This work does not involve confidential or proprietary data. The certification and accreditation requirements of Clause 1352.239-73 do not apply and a security accreditation package is not required. The following Personnel are authorized to place call to the Contractor for dumpster exchange: Brett Whithworth Timothy Orr Bruce Connelly Patrick Murphy Angel Roman Misconduct or Disruption of Services: At any time during the performance period of this contract, the Contracting Officer, Technical Information Contact (TIC) or Operating Unit (OU) Director may request the Contractor employee be immediately removed from the premises if they determine, at their unilateral discretion, that any of the Contractor employee's actions or impaired state to be a disruption to the workforce. Safety: The Contractor employee shall be responsible for knowing and complying with all installation safety prevention regulations. Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal. Security: NIST is a restricted campus. An identification badge is required for access for entry into buildings and also is shown to the armed Security Police when entering the campus. Identification Badges: Contractor employees shall comply with NIST identification and access requirements. The Contractor employee is responsible for absences due to expired identification and access documents. Each Contractor employee shall wear a visible identification badge provided by the NIST Security Office. The badge must show the full name, title, and if required by NIST, the words "Contractor" in front. The Contractor employee shall turn in the NIST identification badge and vehicle pass to the TIC or Contracting Officer (CO) upon termination of their services under this contract. Vehicle Registration: All Contractor employees must register their vehicles with the NIST Security Office to gain access to the campus. A valid driver's license, Government-furnished civilian ID, proof of insurance and current registration must be presented to the NIST Security Office, at which time a NIST vehicle pass will be issued. The pass shall be displayed on the vehicle's rear view mirror in accordance with instructions. The Contractor employee shall follow NIST procedures for removal and turn-in of the vehicle pass upon termination of services under this contract. Media Inquiries: The Contractor employee shall not respond to any media inquiries. Any inquiries from the media shall be immediately relayed to the TIC and/or CO. There shall be no interviews, comments, or any other response to the media or the public without the knowledge and approval of the NIST Director. _______ LINE ITEM 0003 (Opt. One): 6/15/13 - 6/14/14 Hauling Rate Per Haul Statement of Work for Scrap Metal Services Background: The National Institute of Standards and Technology (NIST), located in Gaithersburg, MD, has an excess property program responsible for the reuse, recycle and disposition of equipment. This program produces over 500,000 pound of scrap metal each year. The NIST excess program is anticipated to expand in the coming years, with an anticipated increase in scrap of 200,000 to 300,000 pound per year. The NIST requires services to recycle the scrap metals produced. Specific Requirements: The contractor shall recycle 100% of the scrap metal produced, through the NIST excess program, at no cost to the government. The kinds of scrap metal are: scrap aluminum; stainless steel; light iron; tin. The contractor shall deliver 40 yard recycle containers, galore boxes, or hoppers to different locations within NIST. The main locations are near buildings 301 and 309 on the main campus and at the NIST annex (Nike site) located off of Muddy Branch Road. When contacted by an authorized NIST representative the contactor shall pick up the full container and deliver an empty container. The contractor shall be responsible for maintaining accurate weight records by type of scrap, the contractor shall provide a copies of the weight records to the NIST contracting officer's representative (COR). The contractor shall: 1. Within 48 hours of notification by an authorized NIST representative, the contractor shall perform the exchange of the full container with an empty container of like size. 2. Recycle the scrap metal from the NIST locations near 309 parking areas, building 301 and at the NIST annex (Nike site) located off of Muddy Branch road. There shall be no cost to the government for delivering or pick up of the recyclable containers. A rate for gross tonnage shall be negotiated for comingled scrap metal. For the other kinds of scrap metals the negotiated rate shall be by pound for each separate kind. 3. Under the Code of Federal Regulations (CFR) Title 41, Part 102-38, Section 295, NIST has the statutory authority to retain the proceeds from sales of these recyclables. The proceeds from these recyclables shall be mailed to: NIST, Administrative Services Division, Excess Recyclables Program, 100 Bureau Drive, MS 1920, Gaithersburg, MD 20899, Attn: Krista Faecke Invoicing and Due Dates The Contractor shall provide copies of the of all container exchanges including the weight and the type of metal recycled on a weekly and monthly basis as well as an annual consolidated report including the date, the weight, the type of metal recycled and the prices. Standards for invoicing acceptance: The Contracting Officer's Representative (COR) will provide comments on each invoice received within 5 calendars days from receipt of a given invoice. The invoice shall include total weights for the type of metal recycled the price. If any trash is found comingled with the recyclables it will be deducted from the total weight and a handling fee should be charged. The contractor shall make any needed changes within 3 calendar days from receipt of electronic or written comments from the COR. Period and Place of Performance: The period of performance shall be one (1) year after award of this requirement. The Government may elect to award up to four (4) 1-year options to continue the work specified in this requirement. New price rates shall be negotiated every option year. Performance will be on site at NIST, 100 Bureau Drive, Gaithersburg, MD campus, with the requirement to relocate to or operate from other locations in instances such as a disaster(s). Work shall be performed between the hours of 7:30 AM to 4:00 PM. Container Exchanges: The contractor will deliver or pickup containers during times the NIST campus is open. The contractor shall not deliver or pickup in the event of unplanned closure of the facility due to natural disasters, emergency, or severe weather. Also there shall be no deliveries or pick-ups on legal federal holidays: - New Year's Day, January 1st - Martin Luther King's Birthday, 3rd Monday in January - President's Day, 3rd Monday in February - Memorial Day, Last Monday in May - Independence Day, July 4th - Labor Day, 1st Monday in September - Columbus Day, 2nd Monday in October - Veteran's Day, November 11th - Thanksgiving Day, 4th Thursday in November - Christmas Day, December 25th GOVERNMENT-FURNISHED PROPERTY, DATA AND/OR INFORMATION All property, data and information provided by the Government in the performance of this task remains the property of the Government and shall be surrendered to the government upon completion or termination of this contract. Likewise, all deliverables generated under this requirement remain the property of the Government. The Government does not anticipate providing any property during the performance of this requirement. RISK ASSESSMENT The HSPD-12 Security Risk Level assigned to this contract is low risk. DELIVERABLES AND PAYMENT SCHEDULE The Contractor may invoice the Government upon receipt from the TIC that a given deliverable is of acceptable quality and that all other assigned tasks are up to date. CONTRACTOR'S MINIMUM QUALIFICATIONS The Contractor shall have at least three (3) years of experience in recycling scrap metal. GENERAL INFORMATION This work does not involve confidential or proprietary data. The certification and accreditation requirements of Clause 1352.239-73 do not apply and a security accreditation package is not required. The following Personnel are authorized to place call to the Contractor for dumpster exchange: Brett Whithworth Timothy Orr Bruce Connelly Patrick Murphy Angel Roman Misconduct or Disruption of Services: At any time during the performance period of this contract, the Contracting Officer, Technical Information Contact (TIC) or Operating Unit (OU) Director may request the Contractor employee be immediately removed from the premises if they determine, at their unilateral discretion, that any of the Contractor employee's actions or impaired state to be a disruption to the workforce. Safety: The Contractor employee shall be responsible for knowing and complying with all installation safety prevention regulations. Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal. Security: NIST is a restricted campus. An identification badge is required for access for entry into buildings and also is shown to the armed Security Police when entering the campus. Identification Badges: Contractor employees shall comply with NIST identification and access requirements. The Contractor employee is responsible for absences due to expired identification and access documents. Each Contractor employee shall wear a visible identification badge provided by the NIST Security Office. The badge must show the full name, title, and if required by NIST, the words "Contractor" in front. The Contractor employee shall turn in the NIST identification badge and vehicle pass to the TIC or Contracting Officer (CO) upon termination of their services under this contract. Vehicle Registration: All Contractor employees must register their vehicles with the NIST Security Office to gain access to the campus. A valid driver's license, Government-furnished civilian ID, proof of insurance and current registration must be presented to the NIST Security Office, at which time a NIST vehicle pass will be issued. The pass shall be displayed on the vehicle's rear view mirror in accordance with instructions. The Contractor employee shall follow NIST procedures for removal and turn-in of the vehicle pass upon termination of services under this contract. Media Inquiries: The Contractor employee shall not respond to any media inquiries. Any inquiries from the media shall be immediately relayed to the TIC and/or CO. There shall be no interviews, comments, or any other response to the media or the public without the knowledge and approval of the NIST Director. _______ LINE ITEM 0004 (Opt. One): 6/15/13 - 6/14/14 Price for scrap Per lb. Statement of Work for Scrap Metal Services Background: The National Institute of Standards and Technology (NIST), located in Gaithersburg, MD, has an excess property program responsible for the reuse, recycle and disposition of equipment. This program produces over 500,000 pound of scrap metal each year. The NIST excess program is anticipated to expand in the coming years, with an anticipated increase in scrap of 200,000 to 300,000 pound per year. The NIST requires services to recycle the scrap metals produced. Specific Requirements: The contractor shall recycle 100% of the scrap metal produced, through the NIST excess program, at no cost to the government. The kinds of scrap metal are: scrap aluminum; stainless steel; light iron; tin. The contractor shall deliver 40 yard recycle containers, galore boxes, or hoppers to different locations within NIST. The main locations are near buildings 301 and 309 on the main campus and at the NIST annex (Nike site) located off of Muddy Branch Road. When contacted by an authorized NIST representative the contactor shall pick up the full container and deliver an empty container. The contractor shall be responsible for maintaining accurate weight records by type of scrap, the contractor shall provide a copies of the weight records to the NIST contracting officer's representative (COR). The contractor shall: 1. Within 48 hours of notification by an authorized NIST representative, the contractor shall perform the exchange of the full container with an empty container of like size. 2. Recycle the scrap metal from the NIST locations near 309 parking areas, building 301 and at the NIST annex (Nike site) located off of Muddy Branch road. There shall be no cost to the government for delivering or pick up of the recyclable containers. A rate for gross tonnage shall be negotiated for comingled scrap metal. For the other kinds of scrap metals the negotiated rate shall be by pound for each separate kind. 3. Under the Code of Federal Regulations (CFR) Title 41, Part 102-38, Section 295, NIST has the statutory authority to retain the proceeds from sales of these recyclables. The proceeds from these recyclables shall be mailed to: NIST, Administrative Services Division, Excess Recyclables Program, 100 Bureau Drive, MS 1920, Gaithersburg, MD 20899, Attn: Krista Faecke Invoicing and Due Dates The Contractor shall provide copies of the of all container exchanges including the weight and the type of metal recycled on a weekly and monthly basis as well as an annual consolidated report including the date, the weight, the type of metal recycled and the prices. Standards for invoicing acceptance: The Contracting Officer's Representative (COR) will provide comments on each invoice received within 5 calendars days from receipt of a given invoice. The invoice shall include total weights for the type of metal recycled the price. If any trash is found comingled with the recyclables it will be deducted from the total weight and a handling fee should be charged. The contractor shall make any needed changes within 3 calendar days from receipt of electronic or written comments from the COR. Period and Place of Performance: The period of performance shall be one (1) year after award of this requirement. The Government may elect to award up to four (4) 1-year options to continue the work specified in this requirement. New price rates shall be negotiated every option year. Performance will be on site at NIST, 100 Bureau Drive, Gaithersburg, MD campus, with the requirement to relocate to or operate from other locations in instances such as a disaster(s). Work shall be performed between the hours of 7:30 AM to 4:00 PM. Container Exchanges: The contractor will deliver or pickup containers during times the NIST campus is open. The contractor shall not deliver or pickup in the event of unplanned closure of the facility due to natural disasters, emergency, or severe weather. Also there shall be no deliveries or pick-ups on legal federal holidays: - New Year's Day, January 1st - Martin Luther King's Birthday, 3rd Monday in January - President's Day, 3rd Monday in February - Memorial Day, Last Monday in May - Independence Day, July 4th - Labor Day, 1st Monday in September - Columbus Day, 2nd Monday in October - Veteran's Day, November 11th - Thanksgiving Day, 4th Thursday in November - Christmas Day, December 25th GOVERNMENT-FURNISHED PROPERTY, DATA AND/OR INFORMATION All property, data and information provided by the Government in the performance of this task remains the property of the Government and shall be surrendered to the government upon completion or termination of this contract. Likewise, all deliverables generated under this requirement remain the property of the Government. The Government does not anticipate providing any property during the performance of this requirement. RISK ASSESSMENT The HSPD-12 Security Risk Level assigned to this contract is low risk. DELIVERABLES AND PAYMENT SCHEDULE The Contractor may invoice the Government upon receipt from the TIC that a given deliverable is of acceptable quality and that all other assigned tasks are up to date. CONTRACTOR'S MINIMUM QUALIFICATIONS The Contractor shall have at least three (3) years of experience in recycling scrap metal. GENERAL INFORMATION This work does not involve confidential or proprietary data. The certification and accreditation requirements of Clause 1352.239-73 do not apply and a security accreditation package is not required. The following Personnel are authorized to place call to the Contractor for dumpster exchange: Brett Whithworth Timothy Orr Bruce Connelly Patrick Murphy Angel Roman Misconduct or Disruption of Services: At any time during the performance period of this contract, the Contracting Officer, Technical Information Contact (TIC) or Operating Unit (OU) Director may request the Contractor employee be immediately removed from the premises if they determine, at their unilateral discretion, that any of the Contractor employee's actions or impaired state to be a disruption to the workforce. Safety: The Contractor employee shall be responsible for knowing and complying with all installation safety prevention regulations. Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal. Security: NIST is a restricted campus. An identification badge is re...